INSP-Final Inspection | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Jim Page
|
|
|
Tenting has been corrected, all tenting in place at time of inspection, cover is approved.
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed, no pressure loss observed at riser provided gauge.
Hydro and tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | FAIL |
Jim Page
|
|
|
System lost 20psi during hydro. Tenting has been comprimised by other trades, cover is no longer autorized, a re-inspection for tenting is required. Cover sticker has been removed, any and all cover material installed before tenting re-inspection that prevents a visual inspection of the pipe will be required to be removed. Hydro RE-inspection. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, will be rescheduled for a later date.
Hydrostatic test Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete. All tenting in place at time of inspection, cover is approved. Cover approval sticker has been placed.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|