Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Arielle Hendricks - final ok
|
Final | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | FAIL |
Jack Reynolds
|
|
|
Val ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - insulation shield still needs installed around water heater b vent.
|
Final | 3/25/2020 | 3/31/2020 | 3/31/2020 | A | PART |
Jack Reynolds
|
|
|
Val ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - still need to inspect corrections made to b vent for water heater
|
Final | 2/11/2020 | 2/12/2020 | 2/11/2020 | A | CANC |
Jack Reynolds
|
|
|
Please call Val when on way: ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Final | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | CANC |
Jack Reynolds
|
|
|
Please call on way Val ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - b vent extended by others needs to be permited and insulation shield installed to maintain 1" clearances. Talked with the general onsite and he said he would contract A-1
|
Rough-in | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Jack Reynolds
|
|
|
Please call on way Val ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - R/I pass
|
Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | P | NH |
Jack Reynolds
|
|
|
Please inspect later PM. Val in on site ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - no access to project
|
Final | 1/21/2020 | 1/22/2020 | 1/22/2020 | P | CANC |
Jack Reynolds
|
|
|
Please inspect later PM. Val in on site ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - no access project on backside of house boarded up and no answer at front door
|
Final | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | CANC |
Jack Reynolds
|
|
|
Builder ###-#### - HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - should have been a R/I
|
Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 | A | FAIL |
Jack Reynolds
|
|
|
Builder ###-#### - HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - A/C needs 25 amp fuses installed - two wall cavities need ducted up to grille
|
Final | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | CANC |
Ben Livingston
|
|
|
Please inspect in the later PM (2-5) and call on way: ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Final | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | NR |
Eric Strole
|
|
|
Please inspect in the AM and call on way: ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks-Need to hook-up all bath fans.
|