INSP-Final | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 4/23/2015 | 4/27/2015 | 4/27/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide knox box, provide signage on riser room door and provide map at the facp
|
INSP-Alarm Testing | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. I spoke to Nathan about rescheduling
|
INSP-Final | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Katie Marron
|
|
|
Scope of work completed. Rough in and final inspections passed. Fire Sprinkler permit finaled.
|
INSP-Alarm Testing | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | CANC |
Katie Marron
|
|
|
Permit number and inspection type does not match scope of work.
|