Permit Information
Permit NumberBLD17-01332
StatusIssued
Name GORETOY VLADIMIR
Site Address 9461 W HACKAMORE DR
Project Name
Customer Number 
ePlanReviewNo
Description
Turning garage into living space (572sq') and adding on new garage (506sq') and shop/hobby room (769sq'). All work per plans, notes, engineering & local code. Separate electrical, mechanical, & plumbing permits required. **JB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Change Expiration Date Only  5/1/2020 DONE
DetailsJason Blais
A 180 day extension is granted from 6/20/20. This is the first extension request for an issued permit.
BLD-Conference12/20/201912/23/201912/23/2019ADONE
DetailsMike Jordan
Vlad- call prior Phone #: ###-####
BLD-Energy code compliance12/23/201912/23/201912/23/2019APASS
DetailsMike Jordan
Vlad- call prior Phone #: ###-####
BLD-Energy code compliance12/23/201912/23/201912/23/2019APASS
DetailsMike Jordan
Vlad- call prior Phone #: ###-####
BLD-Conference12/2/201912/2/201912/2/2019PDONE
DetailsMike Jordan
Vlad- please try to call 20 prior Phone #: ###-####. Ok to sheet rock ceilings only.
BLD-Conference8/22/20198/22/20198/22/2019PDONE
DetailsMike Jordan
David Phone #: ###-####
BLD-Framing/Rough-in9/24/20189/25/20189/25/2018APASS
DetailsMike Jordan
Call ten minutes before to meet // Vlad Phone #: ###-####. New patio framing ok. New entry framing ok. Ok to install windows tyvek and roofing.
BLD-Conference2/22/20182/23/20182/23/2018PPASS
DetailsMike Jordan
Please call ahead for access - Vlad Phone #: ###-####
BLD-Wall Bracing2/23/20182/23/20182/23/2018PPASS
DetailsMike Jordan
Please call ahead for access - Vlad Phone #: ###-####. New addition on west side.
BLD-Wall Bracing1/24/20181/25/20181/25/2018ANR
DetailsMike Jordan
shear nail- Sanal Phone #: ###-####. Install all missing blocking per the engineering.
BLD-Framing/Rough-in11/22/201711/24/201711/24/2017APART
DetailsJim Sly
Please call ahead for access for floor framing - Vladmir Phone #: ###-####
Floor framing and Insulation.......OK.
BLD-Framing/Rough-in11/20/201711/21/201711/21/2017APART
DetailsMike Jordan
floor- call on your way please- Vlad Phone #: ###-####. Floor framing over existing garage slab. vapor barrier installed. Needs to insulate with R-30. Advised to dry under floor area prior to insulation and to keep dry.
Routing - MECHANICAL11/21/2017 11/21/2017 PASS
DetailsChad Schwendiman
BLD-Framing/Rough-in10/30/201711/2/201711/2/2017PCANC
DetailsMike Jordan
Cancel per Vladimir floor framing // Vlad Phone #: ###-####
BLD-Conference10/3/201710/4/201710/4/2017ADONE
DetailsMike Jordan
Between 11:00 and 12:00. Needs electrical conferance.
BLD-Conference10/2/201710/3/201710/3/2017ACANC
DetailsMike Jordan
Call half hour before to meet // Vlad Phone #: ###-####. Moved to am tomorrow.
BLD-Foundation6/9/20176/12/20176/12/2017APASS
DetailsJim Sly
Jose Phone #: ###-#### - 12pm please
BLD-Foundation6/5/20176/8/20176/8/2017PCANC
DetailsDave Hannah
Jose Phone #: ###-####-would like around two if possible
BLD-Footing6/7/20176/8/20176/8/2017APASS
DetailsJim Storey
BLD-Footing6/7/20176/7/20176/7/2017PNR
DetailsMike Jordan
BLD-Footing6/6/20176/7/20176/7/2017PCANC
DetailsMike Jordan
Will be ready at 10 Phone #: ###-####. Moved to pm inspection per Juan via phone call.
BLD-Footing6/5/20176/6/20176/6/2017PNR
DetailsMike Jordan
Jose Phone #: ###-####. Will recall for in the am.
OVERRIDE  5/16/2017  
Plan assigned to (JAB) Josh5/11/20175/11/20175/16/2017 PASS
DetailsJosh Bogle
wainting in Brian to double-check my work josh 5-11-17
1st review completed  5/16/2017 DONE
DetailsJosh Bogle
Routing - PLAN CHECK5/16/2017 5/16/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  5/16/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/16/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/16/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/16/2017 DONE
Telephone call  5/16/2017 DONE
Spoke with Vladimir informing him that his permit is ready to be picked up and the amount due for issuance
Issue PAID IN FULL permit  5/16/2017 DONE
Plan resubmittals received  5/9/2017 DONE
Two copies of Structural Engineering Calculations, Two copies of sheets S1.0, S1.1, S1.2, S3.0, S4.0 and S4.1 taken to Josh B
Routing Walk-In (BLD)5/8/20175/8/20175/8/2017PCANC
DetailsJosh Bogle
permit tech took in resubmittals
Routing Walk-In (BLD)5/4/20175/4/20175/8/2017PDONE
DetailsCandy A. Nichols
Routing Walk-In (Zoning)5/4/20175/4/20175/4/2017PPASS
DetailsDavid Moser
Application received 5/4/2017