Print Statement | | | 7/22/2019 | | DONE |
|
|
|
|
Third Notice | | 6/12/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11 with first follow up
|
First Follow up | | | 7/10/2019 | | DONE |
|
|
|
|
Third Notice | | 5/11/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10
|
Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | | 3/17/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
Zoning Approval | 3/7/2019 | 3/7/2019 | 3/7/2019 | | PASS |
Katelyn Menuge
|
|
|
Zoning Final
|
Permanent Occupancy | | | 3/7/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/27/2019 | | DONE |
|
|
|
should not have been final/closed
|
BLD-Final | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Scott Phone #: ###-####
|
PubWorks Occupancy Approval | 2/1/2019 | 2/1/2019 | 2/1/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O has been OK'd...
|
FIRE-Final Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | A | PART |
Jim Page
|
|
|
TCO for fire life safety approved per conversation with Ron Johnson for 30 days for vendor/employee training only. Once fire alarm permit is finaled then life fire safety can be signed off as finaled.
Schedule to come at the same time as the Fire Alarm inspection. Thanks Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Final Inspection | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | CANC |
Troy Cobbley
|
|
|
Need the project related FIR permits scheduled and finaled prior to a life safety inspection.
Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Final Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | FAIL |
Jim Page
|
|
|
FIR permits for fire alarm, fire alarm communicator and hood suppression system needs to be completed and finaled before life fire safety inspection can be completed.
Phone #: ###-#### Inspection requested via web by JT Turner
|
Zoning Approval Temp | 1/25/2019 | 1/25/2019 | 1/25/2019 | | PASS |
Katelyn Menuge
|
|
|
BND19-00025 Landscape
|
Routing - Addressing | 1/25/2019 | | 1/25/2019 | | PASS |
Doug Chausow
|
|
|
Corrected address to: 3266 E Barber Valley Dr.
|
Print Occupancy Form | | | 1/25/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/24/2019 | | |
|
|
|
|
Print Occupancy Form | | | 1/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/6/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 11/26/2018 | 11/26/2018 | 12/6/2018 | | PASS |
Carl D Madsen
|
|
|
Plan Mod - Adjustments to the mechanical ductwork to provide additional heat into the "doghouses" on the roof as a solution to a requestfrom Tim Frost (City of Boise Fire Sprinkler Inspector) to insure that the fire sprinkler pipes in the "doghouses" would notfreeze if/when the outside air temperature reaches -25 F.
|
Routing - PLAN CHECK | 11/27/2018 | | 12/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 12/6/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE (fees due)
|
Routing - MECHANICAL | 11/27/2018 | | 11/29/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 11/27/2018 | | 11/27/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC. See redline marks.
|
Routing - PUBLIC WORKS | 11/27/2018 | | 11/27/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 11/26/2018 | | DONE |
|
|
|
Adjustments to the mechanical ductwork to provide additional heat into the "doghouses" on the roof as a solution to a requestfrom Tim Frost (City of Boise Fire Sprinkler Inspector) to insure that the fire sprinkler pipes in the "doghouses" would notfreeze if/when the outside air temperature reaches -25 F.
|
BLD-Wall cover | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PART |
Brandon Shaw
|
|
|
Need Engineer fix for two broken trusses at BLDG B main entry... OK to isulate...
|
BLD-Energy code compliance | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PART |
Brandon Shaw
|
|
|
Air Seal inspection for area A.
|
CHANGE STATUS TO (ISS) | | | 9/11/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/11/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/6/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 8/22/2018 | 8/22/2018 | 9/6/2018 | | PASS |
Carl D Madsen
|
|
|
Plan Mod - Adjustments to the mechanical ductwork in the kitchen to accommodate the space provided between the roof trusses and
ceiling.
Also the installation of an underground lift station on the outlet side of the grease interceptor, because of invert elevations
of sanitary sewer piping that were modified because of an electrical conduit bank running through the building.
|
Routing - PLAN CHECK | 8/27/2018 | | 9/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 8/27/2018 | | 9/6/2018 | | PASS |
DeAnn Brown
|
|
|
Plan Mod - Adjustments to the mechanical ductwork in the kitchen to accommodate the space provided between the roof trusses and
ceiling.
Also the installation of an underground lift station on the outlet side of the grease interceptor, because of invert elevations
of sanitary sewer piping that were modified because of an electrical conduit bank running through the building.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/6/2018 | | DONE |
|
|
|
PLAN MOD (Do not change status to ISS without BLD18-00230 - all plan mod fees put on this permit)
|
BLD-Energy code compliance | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PART |
Brandon Shaw
|
|
|
Air seal BLDG- C to common area
|
Routing - MECHANICAL | 8/27/2018 | | 9/4/2018 | | PASS |
Troy James
|
|
|
|
BLD-Framing/Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PART |
Brandon Shaw
|
|
|
Area C shower stall drywall and tape
|
Routing - PLUMBING | 8/27/2018 | | 8/30/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
BLD-Framing/Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PART |
Brandon Shaw
|
|
|
Corrections SAT...
|
Routing PW Environmental | 8/27/2018 | | 8/29/2018 | | PASS |
Rick Christenson
|
|
|
Plan Mod - Adjustments to the mechanical ductwork in the kitchen to accommodate the space provided between the roof trusses and
ceiling.
Also the installation of an underground lift station on the outlet side of the grease interceptor, because of invert elevations
of sanitary sewer piping that were modified because of an electrical conduit bank running through the building.
|
Routing PW Flood Plain | 8/27/2018 | | 8/28/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Brandon Shaw
|
|
|
BLDG D- OK to cover exterior and one side of individual units
|
Routing - PUBLIC WORKS | 8/27/2018 | | 8/27/2018 | | PASS |
Rachael Beierle
|
|
|
ROUTED TO PRETREATMENT FOR PLAN MOD
|
Plan Modification Accepted | | | 8/22/2018 | | DONE |
|
|
|
Plan Mod - Adjustments to the mechanical ductwork in the kitchen to accommodate the space provided between the roof trusses and
ceiling.
Also the installation of an underground lift station on the outlet side of the grease interceptor, because of invert elevations
of sanitary sewer piping that were modified because of an electrical conduit bank running through the building.
|
Expiration Notice | 5/1/2018 | 5/22/2018 | 5/1/2018 | | DONE |
Brittany Hill
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/1/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/18/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 11/27/2017 | 11/27/2017 | 4/18/2018 | | PASS |
Carl D Madsen
|
|
|
Veranda at Barber Station
|
Routing PW Street Lights | 11/27/2017 | | 4/18/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 4/13/2018 | | 4/18/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 4/13/2018 | | 4/18/2018 | | PASS |
Todd Tucker
|
|
|
|
Routing Off Site - STRUCTURAL | 4/13/2018 | | 4/18/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2018 | | DONE |
|
|
|
NEED
ACHD
RP
GC FORM
BLD17-03587 NEEDS TO BE FINAL
|
Routing - Design Review | 4/13/2018 | | 4/13/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 3/14/2018 | | 4/11/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/14/2018 | | 4/11/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 12/29/2017 | 1/1/2018 | 3/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing PW Flood Plain | 3/21/2018 | | 3/21/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. JCT
|
Routing - PLUMBING | 3/14/2018 | | 3/19/2018 | | PASS |
Bill VanDegrift
|
|
|
1) additional cross connection protection may be required.
2) backflow protection required on water service.
|
Routing PW Flood Plain | 3/14/2018 | | 3/14/2018 | | FAIL |
Jason C. Taylor
|
|
|
Need LOMR uploaded to case files. Jason Taylor ###-####
|
Routing - Design Review | 3/14/2018 | | 3/14/2018 | | FAIL |
Katelyn Menuge
|
|
|
Need landscape modifications to L1.0
|
Routing PW Drainage | 1/17/2018 | | 1/17/2018 | | PASS |
Brian Murphy
|
|
|
|
1st review completed | | | 12/29/2017 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/27/2017 | | 12/29/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/27/2017 | | 12/29/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 11/27/2017 | 11/27/2017 | 12/7/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing PW Sewer Design | 12/7/2017 | | 12/7/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Environmental | 11/27/2017 | | 12/5/2017 | | PASS |
Rick Christenson
|
|
|
Per 1500 Gallon Exterior Interceptor Installed.
|
Routing - PLUMBING | 11/27/2017 | | 12/4/2017 | | FAIL |
Bill VanDegrift
|
|
|
change mark
1) provide secondary roof drainage system
red line
1) additional cross connection protection may be required
2) backflow protection required on the water service
|
Routing PW Drainage | 11/27/2017 | | 11/30/2017 | | FAIL |
Brian Murphy
|
|
|
need apdex j patio runoff anti crowned streets
|
Routing - MECHANICAL | 11/27/2017 | | 11/29/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Flood Plain | 11/27/2017 | | 11/28/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need LOMR uploaded to case files. Jason Taylor ###-####
|
Routing - Design Review | 11/27/2017 | | 11/28/2017 | | FAIL |
Katelyn Menuge
|
|
|
Prior to sign-off, applicant must vacate and relocate any easement lines where structures are proposed, and complete ROS17-00088.
|
Routing - PLANNING | 11/27/2017 | | 11/27/2017 | | PASS |
David Moser
|
|
|
Current Planning Review is not required and the development was reviewed under DRH17-00358 and DRH17-00525
|
Routing - Addressing | 11/27/2017 | | 11/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/27/2017 | | 11/27/2017 | | PASS |
Rachael Beierle
|
|
|
PERMIT UNDER SWR17-01374
|
Routing - Erosion and Sediment | 11/27/2017 | | 11/27/2017 | | PASS |
Michael Zawacki
|
|
|
RP needed. Dewatering plan may be needed, area is know for shallow water table, no dewatering allowed without approved plan.
Site walk through required prior to ground disturbing activities.
|
Routing PW Solid Waste | 11/27/2017 | | 11/27/2017 | | PASS |
Evan Carpenter
|
|
|
|
Intake Approval | | | 11/27/2017 | | PASS |
|
|
|
|
Intake Approval | | | 11/15/2017 | | FAIL |
Julie Romig
|
|
|
1. Architectural Stamp/Signature on the specification manual cover.
2. Provide either a completed CDHD application or stamped CDHD approved plan.
3. Lighting COMcheck - separate file not found.
4. Reduce size of all drawing sheets over 1 MB and re-upload with same file name. Files larger than 1 MB are very slow to open and read, delaying review times.
|
Application received | | | 11/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2017 2:14PM
|
Temporary Occupancy | 2/27/2019 | 5/28/2019 | | | |
|
|
|
|