Third Notice | | 4/16/2019 | 4/12/2019 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Second Notice | | 3/17/2019 | 4/11/2019 | | DONE |
|
|
|
mailed 4-12-19
|
First Notice | | 2/14/2019 | 3/7/2019 | | DONE |
|
|
|
mailed 3-11
|
BLD-Final | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Dave Hannah
|
|
|
Please call prior to arrival for access to building floors-Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
Permanent Occupancy | | | 2/4/2019 | | DONE |
|
|
|
|
BLD-Final | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | NR |
Mike Jordan
|
|
|
Ron Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/31/2019 | | DONE |
|
|
|
Plan mod
|
OVERRIDE | | | 12/7/2018 | | |
|
|
|
|
Plan assigned to (JG) | 11/13/2018 | 11/13/2018 | 12/7/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod Jacobs - 10th & 12th Floor
|
Routing - PLAN CHECK | 12/5/2018 | | 12/7/2018 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 12/7/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE (fees due)
|
Routing - PLAN CHECK | 11/21/2018 | | 11/28/2018 | | FAIL |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 11/16/2018 | | DONE |
Javier Guzman
|
|
|
failed plan mod prescreen for the following
Provide and upload the following:
1. Revised plan sheets need to stamped, signed and dated by the Idaho licensed architect
2. Lobby opposite swing doors required at doors 200A, 200B, 100A and 100B
3. Provide keynote to what are the new walls or lines shown at MFP room 102 going towards room 103, at breakroom 101 and also across doors 101B, 118A through 123A
|
Plan Modification Accepted | | | 11/13/2018 | | DONE |
|
|
|
Modified fire wall location (a1.1 and a1.2)
|
BLD-Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PART |
Dave Hannah
|
|
|
zack Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Derek Phone #: ###-####
|
FIRE-Final Inspection | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | CANC |
Jim Page
|
|
|
zack Phone #: ###-####
|
BLD-Final | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | NR |
Dave Hannah
|
|
|
zack Phone #: ###-####
|
Temporary Occupancy | 10/29/2018 | 1/27/2019 | 10/29/2018 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | NR |
Dave Hannah
|
|
|
Dereck-wants temp c of o Phone #: ###-####
|
FIRE-Final Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety inspection complete. TCO authorized for life safety pending fire alarm completion associated with project. Permit for life fire safety can be finaled when remaining noted items on fire alarm are complete.
Dereck-wants temp c of o Phone #: ###-####wants temp c of o
|
FIRE-Conference | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete
Zack Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/23/2018 | 10/23/2018 | 10/24/2018 | A | DONE |
Dave Hannah
|
|
|
Derek Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Dave Hannah
|
|
|
Derek Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | NR |
Mike Jordan
|
|
|
Please call Derek or Zach 30 Minutes prior to arriving.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald. No call back and no access to jobsite. Will need to reschedule.
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Dave Hannah
|
|
|
This inspection is for hard lid soffits on floor 10. Please call upon arrival and I will get you up to the floor. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Ceiling Grid Inspection | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PART |
Brandon Shaw
|
|
|
12th floor phase 1...
|
BLD-Framing/Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PART |
Dave Hannah
|
|
|
Zack Phone #: ###-#### hard lids soffits ok to cover
|
BLD-Framing/Rough-in | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Dave Hannah
|
|
|
Rough framing on 10th floor minus plumbing wall at South west area. Please call upon arrival and I can bring you to the floor I will be back onsite at 1:00 pm today.
Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Framing/Rough-in | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Dave Hannah
|
|
|
Please call upon arrival for access for 12th floor framing inspection. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
Permit Ready to Issue | | | 7/23/2018 | | DONE |
|
|
|
Need - MET
GC
Revised Cert of Value
|
Issue PAID IN FULL permit | | | 7/23/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/23/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/24/2018 | 5/24/2018 | 7/21/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 6/06 L2 Jacobs ePlan
|
Routing - PLAN CHECK | 7/19/2018 | | 7/21/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/29/2018 | | 7/3/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 6/29/2018 | | 6/29/2018 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 6/13/2018 | 6/16/2018 | 6/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 5/24/2018 | | 6/13/2018 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 6/13/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 5/24/2018 | | 6/4/2018 | | PASS |
Troy James
|
|
|
No mechanical work being done per architect.
|
Routing - Addressing | 5/24/2018 | | 5/24/2018 | | PASS |
Doug Chausow
|
|
|
Floors 10 and 12
|
Routing - PUBLIC WORKS | 5/24/2018 | | 5/24/2018 | | FAIL |
Morgan Webb
|
|
|
NEED PLUMBING PLANS SHOWING DEMOED AND NEW PLUMBING FIXTURES.
|
Intake Approval | | | 5/24/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/21/2018 | | FAIL |
Brian McGowan
|
|
|
No wall schedule and details were provided.
Floor plans do not note or designate new, to be removed or existing walls.
No Mechanical plans were provided.
Please provide the above mentioned.
|
Application received | | | 5/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 17 2018 5:03PM
|