Information based on query as of Thursday, April 25, 2024.
Permit Information
Permit NumberBLD18-01892
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameB36 Cafeteria Remodel
Customer Number 
ePlanReviewYes
Description
(MICRON B36 CAFETERIA) **(Project Management - Ron Hill)** Micron #36 - Project scope includes the renovation of the existing 2,000 sq ft servery, new coolers and freezer. Updated finishes in the existing 4,000 sq ft seating area will be consistent with other projects on campus. Exterior work will be limited to new roof equipment associated with kitchen and servery upgrades. This building is fully fire sprinklered for area and A-2 occupant load in excass of 100. The building area has been evaluated using the mixed separated use option with the area ratios totaling .97. The building is also fully alarmed. Any altertions to the sprinkler system willl require a separate permit and shall comply with NFPA 13 and 2 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  5/14/2019 DONE
Print Occupancy Form  5/13/2019 DONE
Print Occupancy Form  5/10/2019 DONE
BLD-Final5/6/20195/7/20195/7/2019APASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Final5/2/20195/2/20195/2/2019PNR
DetailsJim Storey
Kevin Phone #: ###-####
FIRE-Final Inspection5/2/20195/2/20195/2/2019PPASS
DetailsTroy Cobbley
life safety passed

Kevin Phone #: ###-####
FIRE-Final Inspection4/26/20194/29/20194/29/2019AFAIL
DetailsTroy Cobbley
Need plans and small documents

Kevin Phone #: ###-####
BLD-Final4/26/20194/29/20194/29/2019ACANC
DetailsMike Jordan
Kevin Phone #: ###-####
BLD-Conference2/26/20192/26/20192/26/2019PPASS
DetailsJim Storey
insp record recored in wrong bld for tennent build out. all activities are ok for temp occ for bld18-01819. fire and bld. 301
Permit Ready to Issue  8/13/2018 DONE
CHANGE STATUS TO (ISS)  8/13/2018 DONE
Plan Mod
Plan assigned to (CDM)8/2/20188/2/20188/11/2018 PASS
DetailsCarl D Madsen
plan mod
PLANS/APPL TAKEN TO FRONT DESK  8/11/2018 DONE
Routing - PLAN CHECK8/6/2018 8/6/2018 PASS
DetailsCarl D Madsen
Plan Modification Accepted  8/2/2018 DONE
Plan mod workflow started for replacement of additional finishes between the Servery and the existing seating area.
Permit Ready to Issue  7/30/2018 DONE
NEED
GC FORM
REVISED VALUE
Emailed Paul 7/30/18 AM, need to confirm value & GC
Issue & PRINT to be Invoiced  7/30/2018 DONE
Print Occupancy Form  7/30/2018 DONE
Plan assigned to (CDM)6/7/20186/7/20187/28/2018 PASS
DetailsCarl D Madsen
Micron building 36 L-2
Routing - PLAN CHECK7/19/2018 7/28/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/28/2018 DONE
Route to Impact Fee Review6/30/20187/3/20187/2/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  6/30/2018 FAIL
Routing - PLAN CHECK6/7/2018 6/30/2018 FAIL
DetailsCarl D Madsen
Routing - FIRE6/7/20186/7/20186/18/2018 PASS
DetailsErika Akin
Attached comments to case
Routing PW Environmental6/8/2018 6/12/2018 PASS
DetailsRick Christenson
All drains accepting food service wastewater shall drain to existing grease interceptor.
Routing - PLUMBING6/7/2018 6/11/2018 PASS
DetailsBill VanDegrift
1) minor additions to existing
2) additional cross connection protection may be required
Routing - Addressing6/7/2018 6/8/2018 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/7/2018 6/8/2018 PASS
DetailsRachael Beierle
Routing - MECHANICAL6/7/2018 6/8/2018 PASS
DetailsTroy James
Intake Approval  6/7/2018 PASS
Application received  5/30/2018 DONE
Application submitted via PDS Online on May 30 2018 9:53AM