Permit Information
Permit NumberBLD18-03211
StatusFinaled
Name SAWTOOTH CONSTRUCTION GROUP INC
Site Address 3100 N LAKEHARBOR LN Unit: 190
Project NameIt's Alive Labs
Customer Number 
ePlanReviewYes
Description
(IT’S ALIVE LABS – OFFICE TENANT IMPROVEMENT) The fire sprinkler system is used for building area increase. To remodel a 2,739 square foot tenant space with a 660 square foot fenced patio area for a new office tenant. Work is to include interior nonbearing walls, a relocated door in the existing 1-hr corridor, interior doors, interior windows, new exterior double leaf door to replace two windows, suspended acoustical ceilings, millwork, and finishes. The existing 1-hr corridor is required to be maintained as a 1-hr corridor with doors having a minimum fire-protection-rating of 20 minutes and windows having a minimum fire-protection-rating of 45 minutes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice1/18/20191/18/20191/23/2019 DONE
DetailsBrandon Shaw
This permit finaled on the web by Kirsten Dallmann
BLD-Final1/16/20191/18/20191/18/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
DOC - Permit Finaled1/18/20191/18/20191/18/2019PPASS
DetailsBrandon Shaw
First Notice 1/28/20191/18/2019 DONE
This permit finaled on the web by Kirsten Dallmann
FIRE-Final Inspection1/16/20191/18/20191/18/2019APASS
DetailsTroy Cobbley
life safety passed


Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
Permanent Occupancy  1/18/2019 DONE
FIRE-Conference1/10/20191/11/20191/11/2019PDONE
DetailsTroy Cobbley
I deferred Kirsten to her architect and the plan reviewer.

Wish to discuss the location of outside exit/sign. Architect pick one door but another door seem more logical. would like your thoughts/opinion. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
BLD-Ceiling Grid Inspection12/31/20181/3/20191/3/2019APASS
DetailsTony Young
Please call before arriving. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
BLD-Ceiling Grid Inspection12/28/201812/31/201812/31/2018ANR
DetailsTony Young
Please call before arriving. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
FIRE-Sprinkler Rough-in12/28/201812/31/201812/31/2018ACANC
DetailsTroy Cobbley
Call prior to arrival. Phone #: ###-#### >> Inspection requested via web by Kirsten Dallmann Inspection cancelled from web by: Kirsten Dallmann
FIRE-Sprinkler Rough-in12/28/201812/31/201812/28/2018ACANC
DetailsJim Page
Call prior to arrival. Phone #: ###-#### >> Inspection requested via web by Kirsten Dallmann Inspection cancelled from web by: Kirsten Dallmann
BLD-Ceiling Grid Inspection12/26/201812/28/201812/28/2018ANR
DetailsTony Young
Please call before arriving. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann,, needs trades,, need to maintain existing 1 hr demising wall
BLD-Ceiling Grid Inspection12/14/201812/17/201812/17/2018PNR
DetailsDave Hannah
Call prior to going Phone #: 2083910523 >> Inspection requested via mobile web by Kirsten Dallmann
BLD-Framing/Rough-in11/19/201811/19/201811/19/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Kirsten Dallmann,, walls ok after bracing better
Plan assigned to (CJW)9/17/20189/17/201810/10/2018 PASS
DetailsCarl Westfall
* 10/03/18 (L3 - 15 days) (ePlan - 5 sheets) It's Alive Labs
Routing - PLAN CHECK9/17/2018 10/10/2018 PASS
DetailsCarl Westfall
1st review completed  10/10/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/10/2018 DONE
Permit Ready to Issue  10/10/2018 DONE
Need- all met
GC Form
Revised Cert of Value
Issue PAID IN FULL permit  10/10/2018 DONE
Print Occupancy Form  10/10/2018 DONE
Routing - FIRE9/17/20189/17/201810/9/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - MECHANICAL9/17/2018 9/26/2018 PASS
DetailsTroy James
Ventilation is required to be met per the 2012 IMC chapter 4.
Routing PW Environmental9/18/2018 9/20/2018 PASS
DetailsRick Christenson
Routing - Addressing9/17/2018 9/18/2018 PASS
DetailsDoug Chausow
Updated suite number to 190, per occupants request.
Routing - PUBLIC WORKS9/17/2018 9/18/2018 PASS
DetailsRachael Beierle
Intake Approval  9/13/2018 PASS
DetailsAdele J Schaffeld-Griffin
Brian accepted pre screen, fees verified 9/13, emailed applicant that this is a change of use on 9/17 to move to Major TI.
Intake Approval  9/5/2018 FAIL
DetailsBrian McGowan
Please provide the following information or corrections in order to approve the prescreen:
1. The permit address is for Suite #180, the plans refer to Suite #190. Please update the address.
2. There are no "AS IS" drawings, did you combine 2 units? Are any existing walls being removed? Please provide an "AS IS" drawing so we can compare the work proposed.
3. The "New Pair Oversized Doors" onto the covered patio indicates an exterior modification. Is there structure involved for widening this opening?
4. The interior door and sidelight to the hallway is being relocated. Is there structure involved (new header)?
5. No mechanical/HVAC alterations are shown or indicated.
6. Please verify if any counters need to be ADA compliant and provide elevations showing compliance as needed.
7. Please provide a Plumbing Plan, fixture schedule, water heater location as/if needed according to the submittal list.
Application received  9/2/2018 DONE
Application submitted via PDS Online on Sep 2 2018 10:50PM