First Notice | | 4/5/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
BLD-Final | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Dave Hannah
|
|
|
|
Permanent Occupancy | | | 3/26/2019 | | DONE |
|
|
|
|
Zoning Approval | 3/21/2019 | 3/21/2019 | 3/21/2019 | | DONE |
Andrea Tuning
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/19/2019 | | DONE |
|
|
|
different company for outdoor seating
|
BLD-Final | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PART |
Dave Hannah
|
|
|
Taylor-still needs mec final & P&Z ok''d a temp Phone #: ###-#### ok for temp occ ok for perm occ after others go perm
|
Temporary Occupancy | 3/14/2019 | 6/12/2019 | 3/14/2019 | | DONE |
Candy A. Nichols
|
|
|
|
FIRE-Final Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for sprinklers complete, final inspection for fire alarms complete, hood suppression system inspection complete. Final life fire safety inspection for area of work complete.
Taylor Phone #: ###-####
|
Zoning Approval Temp | 3/13/2019 | 3/13/2019 | 3/13/2019 | | DONE |
Andrea Tuning
|
|
|
14 day temporary occpancy has been issued per the direction of Cody Riddle. Once the duct work has been painted as required, final occupancy can be signed off.
|
FIRE-Final Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | CANC |
Jim Page
|
|
|
Fire alarms and hood suppression system inspection did not happen, this request is cancelled and will need to be rescheduled to coincide with fire alarm and hood suppression inspection.
call 10 mins ahead- Tyler Phone #: ###-####
|
Meeting | | | 3/12/2019 | | DONE |
|
|
|
Owner of Good Burger informed us a new architect is taking over the project. They will be submitting a plan mod. (Tisha informed me if the old architect will release his plans we can add the new architect Joe T to complete the plan mod. Will need to add Joe as an applicant in eplan when the application is filled out)
|
BLD-Conference | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Taylor Phone #: ###-####
|
BLD-Conference | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | DONE |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
FIRE-Final Inspection | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler, hood suppression (FIR19-00178 is for the hood suppression) and fire alarm permits are still in issued status and have not had final inspections, FIR permits for fire alarm, fire sprinkler and hood suppression must be inspected and finaled before life fire safety can be completed.
Taylor Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
BLD-Other | 1/28/2019 | 1/28/2019 | 1/30/2019 | P | PASS |
Dave Hannah
|
|
|
Taylor-dry wall Phone #: ###-####
|
BLD-Framing/Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
Plan assigned to (JHB) | 1/15/2019 | 1/15/2019 | 1/25/2019 | | CANC |
Joe Bruce
|
|
|
Good Burger III - Plan MOD
|
BLD-Framing/Rough-in | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | DEFR |
Jim Storey
|
|
|
Taylor Phone #: ###-#### out of time
|
BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PART |
Mike Jordan
|
|
|
Taylor Phone #: ###-####. Ok to one side walls. Needs to complete fire caulking on through penetrations in floor. Ok to insulate and install base layer on 2hr. fire wall.
|
Plan resubmittals received | | | 1/16/2019 | | CANC |
Joe Bruce
|
|
|
Recevied plan modification for sheets M.10 and M.11. **JHB**
****CANCEL PLAN MOD PER ROBYN****
|
Plan resubmittals requested | | | 1/16/2019 | | DONE |
Joe Bruce
|
|
|
1) File names should match the previously uploaded sheets so that it overwrites the existing file. Upload the plan modification sheets with the same file name as the previous sheets.
2) There revisions made between M.11 and M.10 could not be established. Please cloud modify and revise the date on the plans for the sheets being modified.
|
CHANGE STATUS TO (ISS) | | | 1/16/2019 | | DONE |
|
|
|
****CANCEL PLAN MOD PER ROBYN****
|
Plan Modification Accepted | | | 1/15/2019 | | DONE |
|
|
|
Sheets M.10 and M.11 shirft of some mechanical equipment.
|
Issue PAID IN FULL permit | | | 1/14/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/14/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 11/30/2018 | 11/30/2018 | 1/10/2019 | | PASS |
Joe Bruce
|
|
|
*(2nd Rev Comp) 12/10 The Good Burger (L-3) (DR)
|
Plan resubmittals received | | | 1/10/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 1/10/2019 | | 1/10/2019 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2019 | | DONE |
|
|
|
NEED- met
GC FORM
REVISED VALUE
MET
ACHD
|
Routing - PLAN CHECK | 12/19/2018 | | 12/20/2018 | | PASS |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 12/19/2018 | | 12/20/2018 | | PASS |
Troy James
|
|
|
Mechanical Engineer will provide a plan mod for the grease duct changes. Grease ducts will have to be installed with reserviors per IMC.
|
Plan resubmittals requested | | | 12/20/2018 | | DONE |
Joe Bruce
|
|
|
Spoke with Robyn about additional DR requirements for permit to be issued. **JHB**
|
Plan resubmittals received | | | 12/19/2018 | | DONE |
Joe Bruce
|
|
|
Recvied corrected sheets in ePlan. **JHB**
|
Routing - Design Review | 12/19/2018 | | 12/19/2018 | | FAIL |
Andrea Tuning
|
|
|
A design review approval is required for the ductwork that will be applied to the exterior of the building. The application shoudl should the color, location and attachment details of the proposed ductwork.
|
Plan resubmittals received | | | 12/18/2018 | | DONE |
Joe Bruce
|
|
|
Sheets file names did not match in ePlan. **JHB**
|
Plan resubmittals requested | | | 12/18/2018 | | DONE |
Joe Bruce
|
|
|
Sent request to archtitect to upload sheets with matching file names. **JHB**
|
Route to Impact Fee Review | 12/11/2018 | 12/14/2018 | 12/11/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 12/11/2018 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 12/11/2018 | | DONE |
Joe Bruce
|
|
|
Emailed plan review report to architect. **JHB**
|
Routing - PLAN CHECK | 11/15/2018 | | 12/11/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 11/15/2018 | 11/15/2018 | 12/10/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (CDM) | 11/15/2018 | 11/15/2018 | 11/30/2018 | | DEFR |
Carl D Madsen
|
|
|
12/10 Good Burger III (L-3)
|
Zoning Approval | 11/28/2018 | 11/28/2018 | 11/28/2018 | | DONE |
Andrea Tuning
|
|
|
Red lined to exclude the outdoor dining.
|
Routing PW Environmental | 11/15/2018 | | 11/27/2018 | | PASS |
Terry Alber
|
|
|
Review passed based on shown grease line and existing grease interceptor. Grease abatement is required.
|
Routing - PUBLIC WORKS | 11/15/2018 | | 11/26/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 11/15/2018 | | 11/26/2018 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 11/15/2018 | | 11/26/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 11/15/2018 | | 11/16/2018 | | PASS |
Doug Chausow
|
|
|
Address: 1003 W Main St
|
Routing - Design Review | 11/15/2018 | | 11/15/2018 | | FAIL |
Andrea Tuning
|
|
|
Outdoor seating will require a site plan and elevations approved by Design Review staff and City Clerk approval of a Sidewalk Café permit prior to building permit submittal or placement of any furnishings. Furnishings shall allow for a minimum 5-foot-wide pedestrian corridor, free of obstructions at all times. All furnishings shall be limited to 3-feet in height.
Any structural encroachments into the right-of-way require Design Review approval and a recorded license agreement with the Ada County Highway District.
|
Routing - PLANNING | 11/15/2018 | | 11/15/2018 | | PASS |
David Moser
|
|
|
Use allowed in C-5 zone and P-1 Parking overlay, See DRH approval
|
Intake Approval | | | 11/13/2018 | | PASS |
|
|
|
|
Intake Approval | | | 10/24/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Provide a Site specific fire flow at hydrants letter from Suez Water or other public water provider
• Provide Planning & Zoning letters of approval for exterior work (overhead and bi-fold doors)
• Provide engineering calculations for the hanging type 1 hood (500 lbs.) and added rooftop weight from MAU (860 lbs.) and rooftop exhaust fan (400 lbs.) and/or any rooftop openings.
|
Application received | | | 10/1/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2018 10:04AM
|
Intake Approval | | | 10/1/2018 | | FAIL |
Javier Guzman
|
|
|
Per applicant asked to fail and return prescreen to applicant
|