Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-04112
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 2015 N CURTIS RD
Project NameKoelsch - New Cafeteria Bldg
Customer Number 
ePlanReviewYes
Description
(Koelsch Elementary) Proposed new stand-alone cafeteria building at Koelsch Elementary. The new building has a cafeteria space, full cooking kitchen, restrooms, and a custodian closet. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/9/2020 DONE
Telephone call  1/9/2020 DONE
Spoke with Mike Burden at Scott Hedrick, and he said that the entire final value of mechanical goes to Paige.
First Notice 12/30/201912/30/2019 DONE
mailed 1-1-20
Permanent Occupancy  12/20/2019 DONE
BLD-Final12/18/201912/19/201912/19/2019APASS
DetailsTell Riley
Jay Phone #: ###-####//signed card--final occupancy ok//
FIRE-Final Inspection12/17/201912/18/201912/18/2019APASS
DetailsTroy Cobbley
Life safety passed.

Call for access 30 mins- Jay Phone #: ###-####
BLD-Aging Inspection12/17/201912/17/201912/18/2019 PASS
DetailsTell Riley
WIP
FIRE-Final Inspection10/17/201910/18/201910/18/2019APART
DetailsTroy Cobbley
A temporary for life safety is ok with the fire dept approval until the existing fire dept access as been modified as discussed to cut back the trees and provide a ramp. jay Phone #: ###-####
Temporary Occupancy10/18/20191/16/202010/18/2019 DONE
DetailsJudith Amador
Temporary Occupancy10/18/20191/16/202010/18/2019 DONE
DetailsJudith Amador
BLD-Final10/14/201910/17/201910/17/2019PPASS
DetailsTell Riley
Jay Phone #: ###-####/for temporary occupancy only//need final statement from special inspections//will need permanant signatures prior to permanant occupancy//
PubWorks Occupancy Approval10/15/201910/15/201910/15/2019 DONE
DetailsTiffany Lowery
FIRE-Final Inspection10/11/201910/14/201910/14/2019PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit inspected/finaled for a temporary to be given due to the fire dept access issues.

jay Phone #: ###-####
FIRE-Final Inspection10/2/201910/3/201910/3/2019PFAIL
DetailsTroy Cobbley
The fire dept access needs addressed as discussed, need K class fire extinguisher, need thumbturn deadbolt on Kitchen door addressed, need the project related fire alarm and hood suppression permits finaled. Jay Phone #: ###-####
PubWorks Temp Occupancy Appr10/3/201910/3/201910/3/2019 DONE
DetailsTiffany Lowery
Engineer letter received, site not complete at inspection and roof drains are not connected to storm drain system.
BLD-Ceiling Grid Inspection9/19/20199/20/20199/20/2019APASS
DetailsTell Riley
JAY Phone #: ###-####
BLD-Conference8/26/20198/26/20198/26/2019PDONE
DetailsTell Riley
Jay Phone #: ###-####
BLD-Framing/Rough-in7/2/20197/3/20197/3/2019PPASS
DetailsTell Riley
Jay Phone #: ###-####//ok to cover walls//trades rough ins complete//call for grid inspection//
BLD-Concrete5/2/20195/2/20195/2/2019PPART
DetailsJim Sly
CMU-Jay Phone #: ###-####
Up to 4 feet........OK pending MTI special inspection, tests and approvals.
BLD-Foundation3/19/20193/20/20193/21/2019PPEND
DetailsDave Hannah
Jay Phone #: ###-#### ok after spec inspection sign off
BLD-Footing3/15/20193/18/20193/18/2019APASS
DetailsDave Hannah
Jay- Would like to pour by 10 am please Phone #: ###-####
Issue PAID IN FULL permit  3/5/2019 DONE
Print Occupancy Form  3/5/2019 DONE
Print Occupancy Form  3/4/2019 DONE
CHANGE STATUS TO (RDY)  3/4/2019 DONE
CHANGE TO ISS STATUS AND CHANGE EXPIRATION DATE. FEE WERE NOT ADDING IN WHEN GC FORM AND REVISED VALUES CAME IN
OVERRIDE  1/7/2019  
Plan assigned to (CDM)11/21/201811/21/20181/7/2019 PASS
DetailsCarl D Madsen
12-01 Koelsch Elementary New
Routing Off Site - STRUCTURAL1/3/2019 1/7/2019 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/3/2019 1/7/2019 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  1/7/2019 DONE
Permit Ready to Issue  1/7/2019 DONE
MET
NEED
ACHD
Met-RP
met-GC
met- Cert of val
Routing PW Drainage1/4/2019 1/4/2019 PASS
DetailsBrian Murphy
Routing - PLAN CHECK12/19/2018 12/28/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL12/19/2018 12/28/2018 FAIL
DetailsCarl D Madsen
AHJ
Routing PW Sewer Design12/20/2018 12/20/2018 PASS
DetailsDeAnn Brown
Routing PW Drainage12/19/2018 12/19/2018 FAIL
DetailsBrian Murphy
need m well and 5 feet seperation
Route to Impact Fee Review12/10/201812/13/201812/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  12/10/2018 DONE
Routing - FIRE11/21/201811/21/201812/7/2018 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL11/21/2018 12/4/2018 FAIL
DetailsCarl D Madsen
Routing - MECHANICAL11/21/2018 11/28/2018 PASS
DetailsTroy James
Routing - ELECTRICAL11/21/2018 11/27/2018 PASS
DetailsJavier Guzman
Routing PW Solid Waste11/21/2018 11/27/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage11/21/2018 11/26/2018 FAIL
PROPERTY LINE GRADES
Routing PW Street Lights11/21/2018 11/26/2018 PASS
DetailsTom Marshall
Routing - PLUMBING11/21/2018 11/26/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING11/21/2018 11/23/2018 PASS
DetailsNicolette Womack
Routing - Addressing11/21/2018 11/23/2018 PASS
DetailsLaura Hunter
Routing - PLAN CHECK11/21/2018 11/23/2018 FAIL
DetailsCarl D Madsen
Routing PW Sewer Design11/21/2018 11/23/2018 FAIL
DetailsDeAnn Brown
Please adjust sheet C5.0 per the changemarks in eplanreview.
Routing - Erosion and Sediment11/21/2018 11/23/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified PD; RP tbd once contract is awarded. ESC Site preparation inspection is required at the beginning of the project.
Routing PW Environmental11/21/2018 11/21/2018 PASS
DetailsTerry Alber
Grease abatement shown. Sampling port not required.
Routing - PUBLIC WORKS11/21/2018 11/21/2018 PASS
DetailsMorgan Webb
Plan Reviewer's activity  11/19/2018 PASS
The Plan Intake Review was approved
Intake Approval  11/19/2018 PASS
Application received  11/12/2018 DONE
Application submitted via PDS Online on Nov 12 2018 8:40AM