Print Statement | | | 1/9/2020 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2020 | | DONE |
|
|
|
Spoke with Mike Burden at Scott Hedrick, and he said that the entire final value of mechanical goes to Paige.
|
First Notice | | 12/30/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
Permanent Occupancy | | | 12/20/2019 | | DONE |
|
|
|
|
BLD-Final | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Tell Riley
|
|
|
Jay Phone #: ###-####//signed card--final occupancy ok//
|
FIRE-Final Inspection | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Call for access 30 mins- Jay Phone #: ###-####
|
BLD-Aging Inspection | 12/17/2019 | 12/17/2019 | 12/18/2019 | | PASS |
Tell Riley
|
|
|
WIP
|
FIRE-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is ok with the fire dept approval until the existing fire dept access as been modified as discussed to cut back the trees and provide a ramp. jay Phone #: ###-####
|
Temporary Occupancy | 10/18/2019 | 1/16/2020 | 10/18/2019 | | DONE |
Judith Amador
|
|
|
|
Temporary Occupancy | 10/18/2019 | 1/16/2020 | 10/18/2019 | | DONE |
Judith Amador
|
|
|
|
BLD-Final | 10/14/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Tell Riley
|
|
|
Jay Phone #: ###-####/for temporary occupancy only//need final statement from special inspections//will need permanant signatures prior to permanant occupancy//
|
PubWorks Occupancy Approval | 10/15/2019 | 10/15/2019 | 10/15/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 10/11/2019 | 10/14/2019 | 10/14/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit inspected/finaled for a temporary to be given due to the fire dept access issues.
jay Phone #: ###-####
|
FIRE-Final Inspection | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | FAIL |
Troy Cobbley
|
|
|
The fire dept access needs addressed as discussed, need K class fire extinguisher, need thumbturn deadbolt on Kitchen door addressed, need the project related fire alarm and hood suppression permits finaled. Jay Phone #: ###-####
|
PubWorks Temp Occupancy Appr | 10/3/2019 | 10/3/2019 | 10/3/2019 | | DONE |
Tiffany Lowery
|
|
|
Engineer letter received, site not complete at inspection and roof drains are not connected to storm drain system.
|
BLD-Ceiling Grid Inspection | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Tell Riley
|
|
|
JAY Phone #: ###-####
|
BLD-Conference | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | DONE |
Tell Riley
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Tell Riley
|
|
|
Jay Phone #: ###-####//ok to cover walls//trades rough ins complete//call for grid inspection//
|
BLD-Concrete | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PART |
Jim Sly
|
|
|
CMU-Jay Phone #: ###-#### Up to 4 feet........OK pending MTI special inspection, tests and approvals.
|
BLD-Foundation | 3/19/2019 | 3/20/2019 | 3/21/2019 | P | PEND |
Dave Hannah
|
|
|
Jay Phone #: ###-#### ok after spec inspection sign off
|
BLD-Footing | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Dave Hannah
|
|
|
Jay- Would like to pour by 10 am please Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/5/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/5/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/4/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 3/4/2019 | | DONE |
|
|
|
CHANGE TO ISS STATUS AND CHANGE EXPIRATION DATE. FEE WERE NOT ADDING IN WHEN GC FORM AND REVISED VALUES CAME IN
|
OVERRIDE | | | 1/7/2019 | | |
|
|
|
|
Plan assigned to (CDM) | 11/21/2018 | 11/21/2018 | 1/7/2019 | | PASS |
Carl D Madsen
|
|
|
12-01 Koelsch Elementary New
|
Routing Off Site - STRUCTURAL | 1/3/2019 | | 1/7/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/3/2019 | | 1/7/2019 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/7/2019 | | DONE |
|
|
|
MET
NEED
ACHD
Met-RP
met-GC
met- Cert of val
|
Routing PW Drainage | 1/4/2019 | | 1/4/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 12/19/2018 | | 12/28/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 12/19/2018 | | 12/28/2018 | | FAIL |
Carl D Madsen
|
|
|
AHJ
|
Routing PW Sewer Design | 12/20/2018 | | 12/20/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Drainage | 12/19/2018 | | 12/19/2018 | | FAIL |
Brian Murphy
|
|
|
need m well and 5 feet seperation
|
Route to Impact Fee Review | 12/10/2018 | 12/13/2018 | 12/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 12/10/2018 | | DONE |
|
|
|
|
Routing - FIRE | 11/21/2018 | 11/21/2018 | 12/7/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 11/21/2018 | | 12/4/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 11/21/2018 | | 11/28/2018 | | PASS |
Troy James
|
|
|
|
Routing - ELECTRICAL | 11/21/2018 | | 11/27/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Solid Waste | 11/21/2018 | | 11/27/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 11/21/2018 | | 11/26/2018 | | FAIL |
|
|
|
PROPERTY LINE GRADES
|
Routing PW Street Lights | 11/21/2018 | | 11/26/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 11/21/2018 | | 11/26/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 11/21/2018 | | 11/23/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 11/21/2018 | | 11/23/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLAN CHECK | 11/21/2018 | | 11/23/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 11/21/2018 | | 11/23/2018 | | FAIL |
DeAnn Brown
|
|
|
Please adjust sheet C5.0 per the changemarks in eplanreview.
|
Routing - Erosion and Sediment | 11/21/2018 | | 11/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified PD; RP tbd once contract is awarded. ESC Site preparation inspection is required at the beginning of the project.
|
Routing PW Environmental | 11/21/2018 | | 11/21/2018 | | PASS |
Terry Alber
|
|
|
Grease abatement shown. Sampling port not required.
|
Routing - PUBLIC WORKS | 11/21/2018 | | 11/21/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 11/19/2018 | | PASS |
|
|
|
The Plan Intake Review was approved
|
Intake Approval | | | 11/19/2018 | | PASS |
|
|
|
|
Application received | | | 11/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 12 2018 8:40AM
|