Description
(TIKKER ENGINEERING – FIRST FLOOR SUITE #170) (2 PERMITS FILED UNDER BLD18-04246 IN EPLANREVIEW) Permit is to remodel an existing 10,940 sq. ft. vanilla created under BLD18-01807. this occupied tenant space is to be 3,536 sq. ft. on the west end of the 1st floor and the remaining vacant space on the east portion of 1st floor is to be 7,311 sq. ft. under BLD18-04376. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select interior windows, construction of select interior nonbearing walls to create tenant demising wall, (2) offices, a conference room, a storage/file room, a break room and open office areas, select wall infill, select new door/door frames, millwork, select new suspended acoustic ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/23/2019 DONE
Third Notice 6/12/20197/10/2019 DONE
mailed 7-11 with first follow up
First Follow up  7/10/2019 DONE
First Follow up  7/10/2019 DONE
Third Notice 5/11/20196/7/2019 DONE
mailed 6-10
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19
Second Notice 3/21/20194/8/2019 DONE
mailed 4-11-19
First Notice 3/2/20193/11/2019 DONE
mailed 3-12-19
BLD-Final2/19/20192/20/20192/20/2019APASS
DetailsMike Jordan
Tony- please call 45 min ahead for access Phone #: ###-####. OK for perm occ.
Permanent Occupancy  2/20/2019 DONE
BLD-Final2/15/20192/15/20192/15/2019PNR
DetailsJim Sly
Tony Phone #: ###-####
Need fire final.....
FIRE-Final Inspection2/15/20192/15/20192/15/2019PDONE
DetailsJim Page
Life fire safety inspection passed per Troy's notes on 05FEB2019.

Tony Phone #: ###-####
BLD-Conference2/12/20192/12/20192/12/2019PCANC
DetailsMike Jordan
BLD-Final2/11/20192/12/20192/12/2019ACANC
DetailsMike Jordan
Please call 45 minutes before arrival. Thank you Phone #: ###-#### Inspection requested via web by Tony Dondero. Moved to pm.
FIRE-Final Inspection2/11/20192/12/20192/12/2019ACANC
DetailsTroy Cobbley
Please call 45 minutes before arrival. Thank you Phone #: ###-#### >> Inspection requested via web by Tony Dondero Inspection cancelled from web by: Tony Dondero
Print Occupancy Form  2/11/2019 DONE
BLD-Final2/6/20192/7/20192/8/2019PCANC
DetailsMike Jordan
Tony Phone #: ###-####
FIRE-Final Inspection2/6/20192/7/20192/7/2019ACANC
DetailsTroy Cobbley
Tony Phone #: ###-####
Case Summary (BLD)  2/7/2019 DONE
Temporary Occupancy2/6/20195/7/20192/6/2019 DONE
DetailsCandy A. Nichols
BLD-Conference2/5/20192/5/20192/5/2019PCANC
DetailsMike Jordan
Tony Phone #: ###-####
BLD-Final2/5/20192/5/20192/5/2019PPASS
DetailsMike Jordan
Tony Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection2/4/20192/5/20192/5/2019APASS
DetailsTroy Cobbley
life safety passed

Tony Phone #: ###-####
FIRE-Final Inspection2/4/20192/4/20192/4/2019PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit finaled, need door hardware installed, need fire extinguishers. Exit lights/emergency lights did function.

Tony Phone #: ###-####
BLD-Ceiling Grid Inspection1/23/20191/23/20191/23/2019APASS
DetailsMike Jordan
BLD-Framing/Rough-in12/24/201812/26/201812/26/2018APASS
DetailsDave Hannah
Please call 45 minutes before arrival. Thank you Tony Donddero Phone #: ###-#### Inspection requested via web by Tony Dondero
Issue PAID IN FULL permit  12/12/2018 DONE
emailed jnorton@jwci.com to sign buolding permit and send back
Print Occupancy Form  12/12/2018 DONE
emailed jnorton@jwci.com permits to sign and send back
Plan assigned to (JG)11/30/201811/30/201812/11/2018 PASS
DetailsJavier Guzman
1st rev comp, 12/05 L1 Tikker Engineering ePlan
PLANS/APPL TAKEN TO FRONT DESK  12/11/2018 DONE
Permit Ready to Issue  12/11/2018 DONE
DO NOT ISSUE WITHOUT BLD18-04376
MET
Need
Revised Cert of Value
GC FORM
Routing - PLAN CHECK12/5/2018 12/6/2018 PASS
DetailsJavier Guzman
Route to Impact Fee Review12/4/201812/7/201812/5/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  12/4/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK11/30/2018 12/4/2018 FAIL
DetailsJavier Guzman
Routing - PLUMBING11/30/2018 12/4/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PUBLIC WORKS11/30/2018 12/3/2018 PASS
DetailsMorgan Webb
Routing - MECHANICAL11/30/2018 12/3/2018 PASS
DetailsTroy James
Routing - Addressing11/30/2018 11/30/2018 PASS
DetailsDoug Chausow
See BLD18-01807
Intake Approval  11/29/2018 PASS
DetailsJavier Guzman
Intake Approval  11/26/2018 FAIL
DetailsMichael Hanson
Provide planning and zoning approval letter for exterior modifications.
Application received  11/21/2018 DONE
Application submitted via PDS Online on Nov 21 2018 10:47AM