Change Expiration Date Only | | | 7/15/2020 | | DONE |
|
|
|
per Jason Blais - TCO extended 90 days from 7/20/2020. See DOCs
|
Change Expiration Date Only | | | 7/14/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/14/2020 | | DONE |
|
|
|
emailed Chad to let him know the TCO will expire 7/20/20 and how to request an extension.
|
BLD-Aging Inspection | 7/6/2020 | 7/6/2020 | 7/8/2020 | | PASS |
Jim Storey
|
|
|
|
Change Expiration Date Only | | | 5/21/2020 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/4/2020 | 5/4/2020 | 5/4/2020 | | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 4/28/2020 | 4/28/2020 | 4/28/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Change Expiration Date Only | | | 4/24/2020 | | DONE |
|
|
|
90 day extension per Jason Blais. See DOCs
|
Telephone call | | | 4/23/2020 | | DONE |
|
|
|
Emailed Jerod Pogue at Wright Brothers to let him know his TCO will expire soon and to request an extension from Jason Blais
|
Telephone call | | | 3/26/2020 | | DONE |
|
|
|
emailed GC TCO courtesy letter. See docs
|
BLD-Aging Inspection | 3/2/2020 | 3/2/2020 | 3/2/2020 | | PASS |
Jim Storey
|
|
|
|
Change Expiration Date Only | | | 1/22/2020 | | DONE |
|
|
|
per Jason Blais - see DOCS
|
Telephone call | | | 1/22/2020 | | DONE |
|
|
|
TCO extended 90 days per Jason Blais. See DOCS
|
BLD-Aging Inspection | 1/1/2020 | 1/1/2020 | 1/2/2020 | | PASS |
Jim Storey
|
|
|
|
Telephone call | | | 12/20/2019 | | DONE |
|
|
|
Mailed and emailed courtesy letter detailing the conditions of the temporary occupancy and how to final.
|
Temporary Occupancy | 10/24/2019 | 1/22/2020 | 10/24/2019 | | DONE |
Judith Amador
|
|
|
|
BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | P | PART |
Jim Storey
|
|
|
Fire life and safety will be out in the AM for inspection Phone #: ###-#### Inspection requested via web by chad stradley // temp ok// perm ok upon all others sign offs.
|
FIRE-Final Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, permenant fire lane signage to be placed at a later date, temp signage is placed as of this entry. Final life fire safety inspection for bldg 9 complete.
Larry Phone #: ###-####
|
PubWorks Occupancy Approval | 10/21/2019 | 10/21/2019 | 10/21/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need fire review notes and all small documents, the site and building address/number need to match the permit documents, provide lever hardware as per the approved door schedule, provide clearance at the fire hydrants..Inspection stopped.
Larry Phone #: ###-####
|
BLD-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | CANC |
Jim Storey
|
|
|
Fire life and safety will be out in the am. So will planning and zoning, and public works Phone #: ###-#### >> Inspection requested via web by chad stradley Inspection cancelled from web by: chad stradley
|
Zoning Approval Temp | 10/18/2019 | 10/18/2019 | 10/18/2019 | | PASS |
Katelyn Menuge
|
|
|
BND19-00190
|
BLD-Conference | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Jim Storey
|
|
|
Fire barrier wall Phone #: ###-#### Inspection requested via web by chad stradley one side ok to proceed. per plan.
|
BLD-Framing/Rough-in | 8/14/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Jim Storey
|
|
|
electrical inspection will be complete Thursday PM or Friday morning before your inspection. Thank you Phone #: ###-#### Inspection requested via web by chad stradley
|
BLD-Footing | 5/9/2019 | 5/10/2019 | 5/10/2019 | P | PART |
Jim Storey
|
|
|
rebar inspection Phone #: ###-#### Inspection requested via web by chad stradley rebar ok need 3 inches encapulation from ground pending si report of compliance.
|
BLD-Foundation | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Jim Storey
|
|
|
damp proofing on building retaining walls Phone #: ###-#### Inspection requested via web by chad stradley
|
CHANGE STATUS TO (ISS) | | | 5/3/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JHB) | 3/21/2019 | 3/21/2019 | 5/2/2019 | | PASS |
Joe Bruce
|
|
|
05/01 (Plan Mod) Falcon One Storage Condos
|
Routing - PLAN CHECK | 5/1/2019 | | 5/2/2019 | | PASS |
Joe Bruce
|
|
|
**Plan Modificaiton Passed Plan Review**
|
Permit Ready to Issue | | | 5/2/2019 | | DONE |
|
|
|
Plan mod approved (plan mod fees under BLD19-03877 main case)
(DO NOT REISSUE or sign off in eplan with out all three BLD18-04075, BLD18-04076 and BLD19-00317 permits have been changed to issued after plan mod fees are paid)
|
Routing - PLAN CHECK | 4/17/2019 | | 5/1/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 4/17/2019 | | 5/1/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
Plan resubmittals requested | | | 5/1/2019 | | DONE |
Joe Bruce
|
|
|
Emailed Matt McAnulty additionl comments.
|
Plan resubmittals received | | | 5/1/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan Modification Accepted | | | 4/17/2019 | | DONE |
Joe Bruce
|
|
|
PLAN MODIFICATION for buildings #7, #8A, & #8B to revise light gauge metal framing to pre-fab metal building.
|
Plan Modification Accepted | | | 4/16/2019 | | FAIL |
Joe Bruce
|
|
|
5) The metal building drawings do not match the architectural drawings. All architectural drawings must be updated to match the new metal building drawings for buildings 7 and 8. Floorplans, elevations, details, and sections shall be updated to reflect the new structure for buildings 7 and 8. Continuity of fire barrier must be maintained.
|
Intake Approval | | | 3/22/2019 | | FAIL |
Joe Bruce
|
|
|
1) Provide a stamp by an Idaho licensed engineer on the new metal building drawings.
2) The metal building drawings do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify ALL new plan sheets have the required space for city approval stamp.
3) The metal building drawings to not meet our minimum requirements. Minimum sheet size accepted is 18”x24”.
4) Provide structural calculations for the metal buildings. These shall be stamped/signed by an Idaho licensed engineer.
5) The metal building drawings do not match the architectural drawings. All architectural drawings must be updated to match the new metal building drawings for buildings 7 and 8. Floorplans, elevations, details, and sections shall be updated to reflect the new structure for buildings 7 and 8. Continuity of fire barrier must be maintained.
6) Update sheet G-001 with the new drawings added to the sheet index.
|
Telephone call | | | 3/21/2019 | | DONE |
|
|
|
plan mod came in but it was for 3 different buildings so they will need to send us 3 plan mod apps. one for each building BLD18-04075 (Bldg 7) BLD18-04076 (Bldg 8A) BLD19-00317 (Bldg 8B)-
i emailed Matt to let him know we needed the 3 apps
|
Plan Modification Accepted | | | 3/21/2019 | | DONE |
|
|
|
plan mod accepted in e plan-changes to structural footing and framing on Bldg 7, 8A & 8B-sheets S2.8.2, S4.8.2 and struc calcs-assigned to Joe B
|
BLD-Footing | 3/8/2019 | 3/11/2019 | 3/11/2019 | A | PART |
Jim Storey
|
|
|
to include UFER inspection Phone #: ###-#### Inspection requested via web by chad stradley rebar ok pending si reports
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
Need
Revised Value- (for each building)
(DO NOT ISSUE WITHOUT ALL PERMITS, BLD18-03877, BLD18-04070 TO BLD18-04076, BLD19-00314 TO BLD19-000317)
|
Issue PAID IN FULL permit | | | 2/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/13/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 11/14/2018 | 11/14/2018 | 2/11/2019 | | PASS |
Joe Bruce
|
|
|
(3rd Rev Comp) 12/07 - (502) Falcon One Storage Condos Bldg 8(B)
|
Routing Off Site - STRUCTURAL | 2/8/2019 | | 2/11/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/8/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 2/6/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 1/30/2019 | | 2/6/2019 | | FAIL |
Joe Bruce
|
|
|
See structural comment in the Agency Comments folder for remaining issue to address. Provide a complete written response outlining the analysis method you are taking responsibility for.
|
Routing PW Sewer Design | 1/30/2019 | | 1/31/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - FIRE | 1/17/2019 | 1/17/2019 | 1/30/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan resubmittals requested | | | 1/30/2019 | | FAIL |
Joe Bruce
|
|
|
PW Sewer and Structutral have additional comments. **JHB**
|
Plan resubmittals received | | | 1/30/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 1/17/2019 | | 1/29/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 1/17/2019 | | 1/28/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing PW Sewer Design | 1/17/2019 | | 1/23/2019 | | FAIL |
DeAnn Brown
|
|
|
|
Routing - Design Review | 1/17/2019 | | 1/18/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - FIRE | 11/14/2018 | 11/14/2018 | 12/12/2018 | | FAIL |
Erika Akin
|
|
|
|
1st review completed | | | 12/12/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 11/14/2018 | | 12/7/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 11/14/2018 | | 11/29/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 11/14/2018 | | 11/26/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 11/14/2018 | | 11/20/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 11/14/2018 | | 11/19/2018 | | PASS |
Dan Ediger
|
|
|
|
Routing - Design Review | 11/14/2018 | | 11/16/2018 | | FAIL |
Katelyn Menuge
|
|
|
|
Routing - PLANNING | 11/14/2018 | | 11/16/2018 | | PASS |
Leon Letson
|
|
|
|
Routing PW Street Lights | 11/14/2018 | | 11/15/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 11/14/2018 | | 11/15/2018 | | FAIL |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 11/14/2018 | | 11/14/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Addressing | 11/14/2018 | | 11/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2018 | | 11/14/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 11/14/2018 | | 11/14/2018 | | CANC |
Andy J. Long
|
|
|
|
Intake Approval | | | 11/7/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/25/2018 | | FAIL |
Javier Guzman
|
|
|
|
Application received | | 10/22/2018 | 10/22/2018 | | DONE |
Joe Bruce
|
|
|
|