Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-00317
StatusTemporary Occupancy
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 2140 E SUMMERSWEET DR
Project NameFalcon One Storage Condos #9
Customer NumberBLD18-04070-4076,19-00314 TO 00317
ePlanReviewYes
Description
(FALCON ONE STORAGE CONDOS) (BUILDING # 9) **PLAN MODIFICATION 5-2-19, TO SWITCH FROM LIGHT GAUGE METAL FRAMING TO A PRE-FABRICATED METAL BUILDING** (12 PERMITS FILED UNDER BLD18-03877) Permit is for Building #8B that totals 7,467 SF with (7) ten storage units with a 3-hour fire barrier between units 801 and 802. There is a total of 8 storage building areas located on a single parcel. The entire scope of work includes construction of 12 individual storage buildings with a total of 107 storage units, a 658 sq. ft. clubhouse space with two single user restrooms, and a small counter with a sink. These buildings are not fire sprinklered. The buildings are divided into fire areas that shall not exceed 12,000 sq. ft. Special inspections required per attached Form 310. Approval is contingent upon adhering to the approved plans on file and attached engineering. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Change Expiration Date Only  7/15/2020 DONE
per Jason Blais - TCO extended 90 days from 7/20/2020. See DOCs
Change Expiration Date Only  7/14/2020 DONE
Telephone call  7/14/2020 DONE
emailed Chad to let him know the TCO will expire 7/20/20 and how to request an extension.
BLD-Aging Inspection7/6/20207/6/20207/8/2020 PASS
DetailsJim Storey
Change Expiration Date Only  5/21/2020 DONE
BLD-Aging Inspection5/4/20205/4/20205/4/2020 PASS
DetailsJim Storey
Zoning Approval4/28/20204/28/20204/28/2020 PASS
DetailsKatelyn Menuge
Change Expiration Date Only  4/24/2020 DONE
90 day extension per Jason Blais. See DOCs
Telephone call  4/23/2020 DONE
Emailed Jerod Pogue at Wright Brothers to let him know his TCO will expire soon and to request an extension from Jason Blais
Telephone call  3/26/2020 DONE
emailed GC TCO courtesy letter. See docs
BLD-Aging Inspection3/2/20203/2/20203/2/2020 PASS
DetailsJim Storey
Change Expiration Date Only  1/22/2020 DONE
per Jason Blais - see DOCS
Telephone call  1/22/2020 DONE
TCO extended 90 days per Jason Blais. See DOCS
BLD-Aging Inspection1/1/20201/1/20201/2/2020 PASS
DetailsJim Storey
Telephone call  12/20/2019 DONE
Mailed and emailed courtesy letter detailing the conditions of the temporary occupancy and how to final.
Temporary Occupancy10/24/20191/22/202010/24/2019 DONE
DetailsJudith Amador
BLD-Final10/21/201910/22/201910/22/2019PPART
DetailsJim Storey
Fire life and safety will be out in the AM for inspection Phone #: ###-#### Inspection requested via web by chad stradley // temp ok// perm ok upon all others sign offs.
FIRE-Final Inspection10/21/201910/22/201910/22/2019APASS
DetailsJim Page
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, permenant fire lane signage to be placed at a later date, temp signage is placed as of this entry. Final life fire safety inspection for bldg 9 complete.

Larry Phone #: ###-####
PubWorks Occupancy Approval10/21/201910/21/201910/21/2019 DONE
DetailsTiffany Lowery
FIRE-Final Inspection10/17/201910/18/201910/18/2019AFAIL
DetailsTroy Cobbley
Need fire review notes and all small documents, the site and building address/number need to match the permit documents, provide lever hardware as per the approved door schedule, provide clearance at the fire hydrants..Inspection stopped.

Larry Phone #: ###-####
BLD-Final10/17/201910/18/201910/18/2019PCANC
DetailsJim Storey
Fire life and safety will be out in the am. So will planning and zoning, and public works Phone #: ###-#### >> Inspection requested via web by chad stradley Inspection cancelled from web by: chad stradley
Zoning Approval Temp10/18/201910/18/201910/18/2019 PASS
DetailsKatelyn Menuge
BND19-00190
BLD-Conference8/30/20199/3/20199/3/2019APASS
DetailsJim Storey
Fire barrier wall Phone #: ###-#### Inspection requested via web by chad stradley one side ok to proceed. per plan.
BLD-Framing/Rough-in8/14/20198/16/20198/16/2019PPASS
DetailsJim Storey
electrical inspection will be complete Thursday PM or Friday morning before your inspection. Thank you Phone #: ###-#### Inspection requested via web by chad stradley
BLD-Footing5/9/20195/10/20195/10/2019PPART
DetailsJim Storey
rebar inspection Phone #: ###-#### Inspection requested via web by chad stradley rebar ok need 3 inches encapulation from ground pending si report of compliance.
BLD-Foundation5/3/20195/6/20195/6/2019APASS
DetailsJim Storey
damp proofing on building retaining walls Phone #: ###-#### Inspection requested via web by chad stradley
CHANGE STATUS TO (ISS)  5/3/2019 DONE
plan mod
Plan assigned to (JHB)3/21/20193/21/20195/2/2019 PASS
DetailsJoe Bruce
05/01 (Plan Mod) Falcon One Storage Condos
Routing - PLAN CHECK5/1/2019 5/2/2019 PASS
DetailsJoe Bruce
**Plan Modificaiton Passed Plan Review**
Permit Ready to Issue  5/2/2019 DONE
Plan mod approved (plan mod fees under BLD19-03877 main case)
(DO NOT REISSUE or sign off in eplan with out all three BLD18-04075, BLD18-04076 and BLD19-00317 permits have been changed to issued after plan mod fees are paid)
Routing - PLAN CHECK4/17/2019 5/1/2019 FAIL
DetailsJoe Bruce
Routing Off Site - STRUCTURAL4/17/2019 5/1/2019 PASS
DetailsJoe Bruce
AHJ
Plan resubmittals requested  5/1/2019 DONE
DetailsJoe Bruce
Emailed Matt McAnulty additionl comments.
Plan resubmittals received  5/1/2019 DONE
DetailsJoe Bruce
Plan Modification Accepted  4/17/2019 DONE
DetailsJoe Bruce
PLAN MODIFICATION for buildings #7, #8A, & #8B to revise light gauge metal framing to pre-fab metal building.
Plan Modification Accepted  4/16/2019 FAIL
DetailsJoe Bruce

5) The metal building drawings do not match the architectural drawings. All architectural drawings must be updated to match the new metal building drawings for buildings 7 and 8. Floorplans, elevations, details, and sections shall be updated to reflect the new structure for buildings 7 and 8. Continuity of fire barrier must be maintained.
Intake Approval  3/22/2019 FAIL
DetailsJoe Bruce
1) Provide a stamp by an Idaho licensed engineer on the new metal building drawings.
2) The metal building drawings do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify ALL new plan sheets have the required space for city approval stamp.
3) The metal building drawings to not meet our minimum requirements. Minimum sheet size accepted is 18”x24”.
4) Provide structural calculations for the metal buildings. These shall be stamped/signed by an Idaho licensed engineer.
5) The metal building drawings do not match the architectural drawings. All architectural drawings must be updated to match the new metal building drawings for buildings 7 and 8. Floorplans, elevations, details, and sections shall be updated to reflect the new structure for buildings 7 and 8. Continuity of fire barrier must be maintained.
6) Update sheet G-001 with the new drawings added to the sheet index.
Telephone call  3/21/2019 DONE
plan mod came in but it was for 3 different buildings so they will need to send us 3 plan mod apps. one for each building BLD18-04075 (Bldg 7) BLD18-04076 (Bldg 8A) BLD19-00317 (Bldg 8B)-
i emailed Matt to let him know we needed the 3 apps
Plan Modification Accepted  3/21/2019 DONE
plan mod accepted in e plan-changes to structural footing and framing on Bldg 7, 8A & 8B-sheets S2.8.2, S4.8.2 and struc calcs-assigned to Joe B
BLD-Footing3/8/20193/11/20193/11/2019APART
DetailsJim Storey
to include UFER inspection Phone #: ###-#### Inspection requested via web by chad stradley rebar ok pending si reports
Permit Ready to Issue  2/13/2019 DONE
Need
Revised Value- (for each building)

(DO NOT ISSUE WITHOUT ALL PERMITS, BLD18-03877, BLD18-04070 TO BLD18-04076, BLD19-00314 TO BLD19-000317)
Issue PAID IN FULL permit  2/13/2019 DONE
Print Occupancy Form  2/13/2019 DONE
Plan assigned to (JHB)11/14/201811/14/20182/11/2019 PASS
DetailsJoe Bruce
(3rd Rev Comp) 12/07 - (502) Falcon One Storage Condos Bldg 8(B)
Routing Off Site - STRUCTURAL2/8/2019 2/11/2019 PASS
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  2/11/2019 DONE
Plan resubmittals received  2/8/2019 DONE
DetailsJoe Bruce
Plan resubmittals requested  2/6/2019 FAIL
DetailsJoe Bruce
Routing Off Site - STRUCTURAL1/30/2019 2/6/2019 FAIL
DetailsJoe Bruce
See structural comment in the Agency Comments folder for remaining issue to address. Provide a complete written response outlining the analysis method you are taking responsibility for.
Routing PW Sewer Design1/30/2019 1/31/2019 PASS
DetailsDeAnn Brown
Routing - FIRE1/17/20191/17/20191/30/2019 PASS
DetailsErika Akin
Attached comments to case
Plan resubmittals requested  1/30/2019 FAIL
DetailsJoe Bruce
PW Sewer and Structutral have additional comments. **JHB**
Plan resubmittals received  1/30/2019 DONE
DetailsJoe Bruce
Routing - PLAN CHECK1/17/2019 1/29/2019 PASS
DetailsJoe Bruce
Routing Off Site - STRUCTURAL1/17/2019 1/28/2019 FAIL
DetailsJoe Bruce
AHJ
Routing PW Sewer Design1/17/2019 1/23/2019 FAIL
DetailsDeAnn Brown
Routing - Design Review1/17/2019 1/18/2019 PASS
DetailsKatelyn Menuge
Routing - FIRE11/14/201811/14/201812/12/2018 FAIL
DetailsErika Akin
1st review completed  12/12/2018 FAIL
DetailsJoe Bruce
Routing - PLAN CHECK11/14/2018 12/7/2018 FAIL
DetailsJoe Bruce
Routing Off Site - STRUCTURAL11/14/2018 11/29/2018 FAIL
DetailsJoe Bruce
Routing - MECHANICAL11/14/2018 11/26/2018 PASS
DetailsTroy James
Routing PW Drainage11/14/2018 11/20/2018 PASS
DetailsBrian Murphy
Routing - PLUMBING11/14/2018 11/19/2018 PASS
DetailsDan Ediger
Routing - Design Review11/14/2018 11/16/2018 FAIL
DetailsKatelyn Menuge
Routing - PLANNING11/14/2018 11/16/2018 PASS
DetailsLeon Letson
Routing PW Street Lights11/14/2018 11/15/2018 PASS
DetailsTom Marshall
Routing PW Sewer Design11/14/2018 11/15/2018 FAIL
DetailsDeAnn Brown
Routing PW Solid Waste11/14/2018 11/14/2018 PASS
DetailsEvan Carpenter
Routing - Addressing11/14/2018 11/14/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/14/2018 11/14/2018 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment11/14/2018 11/14/2018 CANC
DetailsAndy J. Long
Intake Approval  11/7/2018 PASS
DetailsJavier Guzman
Intake Approval  10/25/2018 FAIL
DetailsJavier Guzman
Application received 10/22/201810/22/2018 DONE
DetailsJoe Bruce