Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD19-02218
StatusIssued
Name ESI
Site Address 455 N BENJAMIN LN
Project Name455 Benjamin Vanilla T.I.
Customer Number 
ePlanReviewYes
Description
(VANILLA T.I. - NO OCCUPANCY) ***PLAN MOD INCLUDES ACCESSIBLE BATHROOMS, BREAKROOM KITCHENETTE AND THE ADDITION OF A HI-LO DRINKING FOUNTAIN*** NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. ***Special inspections required see 310 form*** This building is not fire sprinkled. Permit to remodel 15,000 sqft of the 1st and 2nd floor of an existing warehouse office area. Work to include: Demo select portions of exterior north and east walls, demo select interior non-bearing walls, demo existing plumbing fixtures, new exterior windows, new interior non-load bearing wall to create (2) accessible bathrooms, (1) new kitchenette, electrical work, mechanical work, and plumbing work. Interior finishes shall comply with chapter 8 of 2015 IBC. Approval is contingent on adhering to the approved plans. Structural engineering has been provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20204/9/20204/9/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by nate hutton
Zoning Approval4/9/20204/9/20204/9/2020 PASS
DetailsKayCee Babb
Photos of xeriscape landscaping provided, complying with DRH19-00183.
BLD-Final2/25/20202/26/20202/26/2020APEND
DetailsMike Jordan
Mike Phone #: ###-####. QWill be ok to final once zoning has finaled.
Zoning Approval2/24/20202/24/20202/24/2020 FAIL
DetailsKayCee Babb
Side gravel area does not meet conditions of approval of DRH19-00183 or Building permit redlines.
BLD-Final2/20/20202/21/20202/21/2020PFAIL
DetailsMike Jordan
Mike Phone #: ###-####. Needs to provide ledgible plans, provide final letter from special inspection agency. Noted no framing inspections were called in by contractor for interior framed walls.
FIRE-Final Inspection2/20/20202/21/20202/21/2020APASS
DetailsTroy Cobbley
Life safety passed.

Mike Phone #: ###-####
CHANGE STATUS TO (ISS)  1/9/2020 DONE
Inspection Record Card- Bld  1/9/2020 DONE
Plan assigned to (M_H)12/19/2019 1/2/2020 DONE
DetailsMichael Hanson
01/01 plan mod- enlarge restrooms
Routing - PLAN CHECK1/2/2020 1/2/2020 PASS
DetailsMichael Hanson
1-hour plan mod fee
Routing - PLUMBING1/2/2020 1/2/2020 PASS
DetailsDan Ediger
Per ePlan approval
Routing - PUBLIC WORKS1/2/2020 1/2/2020 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT FOR FEES.
Permit Ready to Issue  1/2/2020 DONE
Plan Mod Approved

ALL MET
Need
Revised Value from GC
Routing - PLUMBING12/27/2019 12/27/2019 PASS
DetailsDan Ediger
Per Plans and ISPC
Intake Approval  12/26/2019 PASS
DetailsMichael Hanson
Plan Mod intake approval
Plan Modification Accepted  12/19/2019 DONE
plan mod- enlarge restrooms
Issue PAID IN FULL permit  7/31/2019 DONE
Inspection Record Card- Bld  7/31/2019 DONE
Routing - PLAN CHECK7/23/2019 7/23/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/23/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/23/2019 DONE
MET BLAKEOLIVER@ESICONSTRUCTION.COM
Need GC
Need rev cert of val
Plan assigned to (M_H)6/27/2019 7/23/2019 DONE
DetailsMichael Hanson
1st review completed - 07/09 #518 L2 ePlan - Vanilla TI
Routing - Design Review7/11/2019 7/11/2019 PASS
DetailsKayCee Babb
To comply with redlines on L1 Landscape Plan.
Route to Impact Fee Review7/9/20197/12/20197/10/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE6/27/20196/27/20197/9/2019 PASS
DetailsMark Scharfen
07.09.2019-Completed fire review. Vanilla finish, no occupancy, no report and no notes on plan.
Routing Off Site - STRUCTURAL6/27/2019 7/9/2019 PASS
DetailsMichael Hanson
Passed per ePlan approval by Sidney Gold @ KPFF
1st review completed  7/9/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing - PLAN CHECK6/27/2019 7/9/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing - PLUMBING6/27/2019 6/27/2019 PASS
DetailsDan Ediger
Per plans and ISPC
Routing - PUBLIC WORKS6/27/2019 6/27/2019 PASS
DetailsMorgan Webb
NO NEW FEES
Routing - Design Review6/27/2019 6/27/2019 FAIL
DetailsKayCee Babb
Full exterior elevations need to be uploaded to Building permit, to reflect compliance with DRH19-00183.
Intake Approval  6/26/2019 PASS
DetailsJoe Bruce
Prescreen approved by M_H
Intake Approval  6/25/2019 FAIL
DetailsMichael Hanson
Please add TBD to special inspections firm and owner signature and date are required on the 310 firm.
Revise and resubmit.
Intake Approval  6/21/2019 FAIL
DetailsMichael Hanson
Please provide:
304 form completed and signed
Complete all fields on the 310 coversheet
Remove not for construction preliminary plans on sheet L1
Intake Approval  6/17/2019 FAIL
DetailsMichael Hanson
Please provide required 518 checklist completed and signed.
Application received  6/14/2019 DONE
Application submitted via PDS Online on Jun 14 2019 3:59PM