Permit Information
Permit NumberBLD19-03257
StatusIssued
Name C & T CONSTRUCTION
Site Address 7761 W CRESTWOOD DR
Project Name12A
Customer NumberBLD19-03229, 03247 - 03257
ePlanReview 
Description
***02/18/20 PLAN MODIFICATION TO UPDATE 2 HOUR WALL*** (12 PERMITS FILED WITH BLD19-03229) Permit for the construction of a new 1599 sq. ft., 3 story (first story 201 sq. ft., second story 746 sq. ft., third story 652 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 146 sq. ft. of covered patio/porch and a 460 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance6/17/20206/17/20206/17/2020APASS
DetailsTell Riley
Inspection requested via web by Carl Funk//add VB over window headers//add stud where cut for bearing//add studd to header over stairs-joey will send photos//other framing ok per plans or in compliance with engineers changes and verbal walk through based on the first 8 units inspected//
BLD-Framing/Rough-in6/12/20206/12/20206/12/2020APASS
DetailsTell Riley
Inspection requested via web by Carl Funk//ok to insulate//see Joey onsite for correction notes//
BLD-Wall Bracing6/2/20206/2/20206/2/2020PPART
DetailsTell Riley
Firewall Inspection requested via web by Carl Funk//interior gyp shear wall//ok to cover when screws have been added at blocking lines on each floor as discussed//screws per details and email from engineer for gyp shear walls//
BLD-Energy code compliance5/18/20205/18/20205/18/2020APART
DetailsTell Riley
Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
BLD-Energy code compliance5/15/20205/15/20205/15/2020PNR
DetailsTell Riley
Insulation Firewall Inspection requested via web by Carl Funk//need to fix R21/add R21 in areas noted on walk through//
BLD-Framing/Rough-in5/7/20205/8/20205/8/2020APART
DetailsTell Riley
Inspection requested via web by Carl Funk//fire separation walls only//need verification on fire rating on heater box(all units)//other corrections made//ok to insulate fire separation walls only//
BLD-Framing/Rough-in5/7/20205/7/20205/7/2020AFAIL
DetailsTell Riley
Fire blocking firewall Phone #: ###-#### Inspection requested via web by Carl Funk/framing for fire walls ONLY//add nuts and bolts in areas noted//add studs in areas noted//add fire blocking in areas noted//see details for truss connections at fire walls//complete air seal//
Routing - MECHANICAL3/27/2020 3/27/2020 PASS
DetailsTroy James
Resubmitted ACCA report
BLD-Wall Bracing3/19/20203/20/20203/20/2020APART
DetailsTell Riley
Inspection requested via web by Carl Funk
BLD-Wall Bracing3/16/20203/17/20203/17/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//need to add nails, fix hold downs nails//did walk through with carl//add hold downs where needed//
Permit Ready to Issue  2/19/2020 DONE
CHANGE STATUS TO (ISS)  2/19/2020 DONE
Plan assigned to (RDP)2/11/20202/11/20202/18/2020 DONE
DetailsRob Patrick
02/17 Plan Mod
Routing - PLAN CHECK2/18/2020 2/18/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/18/2020 DONE
DetailsRob Patrick
Plan Modification Accepted  2/11/2020 DONE
2 copies of Sheet A4.4.
BLD-Foundation10/18/201910/18/201910/18/2019PPART
DetailsTell Riley
SERGIO- wall foundation inspection Phone #: ###-####//wip//
BLD-Footing10/17/201910/17/201910/17/2019PPART
DetailsTell Riley
Sergio Phone #: ###-####//ok when verts added to meet 32" requrement//
OVERRIDE  10/3/2019  
Inspection Record Card- Bld  10/3/2019 DONE
Telephone call  10/3/2019 DONE
spoke with carl informing permit is ready and fee amount
Issue PAID IN FULL permit  10/3/2019 DONE
Plan assigned to (RDP)8/28/2019 10/3/2019 DONE
DetailsRob Patrick
09/16 sfd L2 PAPER...Failed
Routing - PLAN CHECK10/3/2019 10/3/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  10/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  10/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  10/3/2019 DONE
Plan resubmittals received  10/2/2019 DONE
Two copies each of structural design calcualtions stamped and taken to plan reviewer.
Plan resubmittals received  9/27/2019 DONE
Two copies of plan sheets A2.0, A2.2, A2.6, A2.7, A4.4, S2.0 and E2.1. taken to rob
1st review completed  9/25/2019 FAIL
DetailsRob Patrick
Multiple Corrections
Routing - PLAN CHECK9/6/2019 9/25/2019 FAIL
DetailsRob Patrick
Multiple Corrections
Routing - MECHANICAL8/28/2019 9/6/2019 PASS
DetailsTroy James
Routing - Design Review9/5/2019 9/5/2019 PASS
DetailsKatelyn Menuge
Redlined facade and landscape changes.
Routing - PLANNING8/28/2019 9/4/2019 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS8/28/2019 9/3/2019 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT ###-####
Routing - Addressing8/28/2019 8/30/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review8/28/20198/31/20198/29/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  8/28/2019 DONE
Recd Pcfee & Taken To Pln CK  8/28/2019 DONE
Intake Approval  8/28/2019 PASS
Application received 8/22/2019   
Application received 8/22/2019