Permit Information
Permit NumberBLD19-03923
StatusIssued
Name EDGETEK CONSTRUCTION LLC
Site Address 10990 W FAIRVIEW AVE
Project NameLupo Motors
Customer Number 
ePlanReviewYes
Description
(LUPO MOTORS) //PLAN MODIFICATION TO UPDATE DOOR HARWARE FOR EXISTING VAULT DOOR // SPECIAL INSPECTIONS ARE REQUIRED FOR POST INSTALLED EPOXY ANCHORS, CONTRACTOR TO PROVIDE INSPECTOR REPORT UPON ARRIVAL. Permit for the remodel of a 4,760 sqft bank to convert it into a car dealership. Work to include: Demo non-load bearing interior walls, demo portion of east exterior wall to install a roll-up door, remodel an existing restroom to remove 1 toilet to provide accessibility requirements, concrete work on site plan, plumbing work, electrical work, and interior finishes. Approval is contingent on adhering to the approved plans, structural engineering, local ordinances and policies. Interior finishes shall be in compliance with Chapter 8 of 2015 IBC. This building is not fire sprinkled. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20208/11/20208/11/2020PNR
DetailsTell Riley
David on-site contact 830.0212 Phone #: ###-#### Inspection requested via web by Ron Ramza//need plumbing permit and final//breakroom/kitchen is existing and was not changed//other areas appear to be ok per the plans//
FIRE-Final Inspection8/11/20208/11/20208/11/2020PPASS
DetailsTroy Cobbley
Life safety passed.

David on-site contact 830.0212 Phone #: ###-#### Inspection requested via web by Ron Ramza
CHANGE STATUS TO (ISS)  8/7/2020 DONE
Permit Ready to Issue  7/22/2020 DONE
Plan Mod Approved
DO NOT REISSUE
Plan assigned to (M_H)7/7/2020 7/21/2020 DONE
DetailsMichael Hanson
07/17 Plan Mod Lupo Motors ePlan
Routing - PLAN CHECK7/21/2020 7/21/2020 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/21/2020 DONE
DetailsMichael Hanson
FIRE-Final Inspection7/6/20207/7/20207/7/2020AFAIL
DetailsTroy Cobbley
Called three times, left one message. Went to project site and made no contact, doors locked. No inspection performed. WIll need to be rescheduled.

Items completed from failed inspection 07/06/2020. Phone #: ###-#### Inspection requested via web by Ron Ramza
Plan Modification Accepted  7/7/2020 DONE
Door Hardware update for existing vault door.
FIRE-Final Inspection7/6/20207/6/20207/6/2020PFAIL
DetailsTroy Cobbley
Provide tagged and mounted fire extinguisher as discussed, provide panic hardware on west door as per plans. Also approved plans show approved hardware on Vault door.
BLD-Final7/2/20207/6/20207/6/2020PCANC
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Ron Ramza Inspection cancelled from web by: Ron Ramza
FIRE-Final Inspection7/2/20207/6/20207/6/2020PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Ron Ramza Inspection cancelled from web by: Ron Ramza
BLD-Framing/Rough-in11/27/201911/29/201911/29/2019APASS
DetailsBrandon Shaw
Inspect OH Door framing ; Break room framing
David is contact 208.830.0212 Phone #: ###-#### Inspection requested via web by Ron Ramza
BLD-Framing/Rough-in11/18/201911/20/201911/20/2019PFAIL
DetailsTell Riley
David is contact ###-#### Inspection requested via web by Ron Ramza//needed inspection for garage door opening//need to provide apporved plans and all documents and retain onsite//anchors were installed prior to special inspection--will need special inspection verification prior to approval//
Issue PAID IN FULL permit  11/15/2019 DONE
Print Occupancy Form  11/15/2019 DONE
Routing - Design Review11/12/2019 11/12/2019 PASS
DetailsKayCee Babb
Per DRH19-00421. To comply with redlines on sheets AS1-1 and A4-1.
Routing - PLAN CHECK11/12/2019 11/12/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  11/12/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  11/12/2019 DONE
MET DAVIDBALDWIN1988@GMAIL.COM
Need:
GC Form
Revised Cert of Value
Plan assigned to (M_H)10/21/2019 11/12/2019 DONE
DetailsMichael Hanson
2nd review completed - 10/31 #518 L2 ePlan - Lupo Motors
Routing - PLAN CHECK11/7/2019 11/7/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Route to Impact Fee Review10/29/201911/1/201910/30/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE10/21/201910/21/201910/29/2019 PASS
DetailsErika Akin
No comments attached. Restroom remodel for auto dealership. Display of vehicles inside shall comply with IFC 314.4. Inspector to field verify in addition to fire extinguishers and life safety.
1st review completed  10/29/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK10/21/2019 10/24/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing - Design Review10/21/2019 10/21/2019 FAIL
DetailsKayCee Babb
Compliance with conditions of approval of DRH19-00421 required, including: provide 6 street trees; install terminal planters on either side of overhead door access lane; stucco shall not extend below two feet above ground.
Plan Reviewer's activity  10/18/2019  
DetailsBrian McGowan
The scale on the Floor Plan on AD1-1 is 3/16" not 1/4".
Intake Approval  10/18/2019 PASS
Intake Approval  10/15/2019 FAIL
DetailsBrian McGowan
1. Please verify the scale of the Floor Plan on AD1.1.
2. Provide exterior building elevations for the addition of the Garage Door and the exterior finish materials to show compliance with DRH19-00421.
3. Provide wall sections as needed to show how the new building materials are being attached to the existing walls (attachment to brick and walls must meet installation requirements and manufacturer specifications).
Intake Approval  10/3/2019 FAIL
DetailsBrian McGowan
1. Please provide a more comprehensive Key Plan so the fixture count required can be verified.
2. Does Lupo Motors have a Certificate of Occupancy? I cannot find a C of O for them or a current Floor Plan.
Application received  10/1/2019 DONE
Application submitted via PDS Online on Oct 1 2019 1:17PM