Site Final | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Michael Zawacki
|
|
|
First section of foundation has been poured, eco pan on site. No dirt leaving limits of disturbance, no dust issues. Water truck is on site. All vehicles being parked in paved parking lot.
|
Site Preparation | 6/19/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Michael Zawacki
|
|
|
SWPPP map and book on site, permit displayed on window. Inlets in parking lot are protected. Site has entrance and private parkin lot, long way from public road.
|
Site Preparation | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | CANC |
Andy J. Long
|
|
|
|
Issue & PRINT permit COM | | | 6/13/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/26/2018 | | 4/26/2018 | | PASS |
Andy J. Long
|
|
|
ESC site map and plan narrative approved. RP to be desiganted by Beniton Construction, required before permit issue. Site preparation inspection is required.
|
Application received | | | 4/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 6 2018 12:44PM
|