Permit Information
Permit NumberFIR16-00808
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51 System 30-2
Customer NumberC24074
ePlanReviewYes
Description
[Micron Building 51 - System LV30-2 - C24074]
The fire sprinkler scope of work consists of providing fire protection for part of the interstitial space level 30. There is extensive under duct protection. This system is designed as a grid.

• The underground is under permit FIR16-00701
• Building drawings are also linked in under permit BLD16-01184 (Steel Superstructure)
• See addendum for graphic scope of work.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-03440] - Construction to include the building envelope to include exterior walls and roof, link construction to B36, all interior construction, doors, hardware and finishes and specialty wall, ceiling and floor materials and details, mechanical, electrical, plumbing and Fire Alarm and Fire Protection systems. Fire Protection Drawings will be a deferred submittal. Proposed Pyrophoric Room will be permitted separately.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/13/20198/13/20198/13/2019PPASS
DetailsJim Page
Final fire sprinkler inspection for scope of work complete.
INSP-Final Inspection4/12/20194/12/20194/12/2019PCANC
DetailsJim Page
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.

Clarence Phone #: ###-####
INSP-Final Inspection6/29/20176/30/20176/30/2017PPART
DetailsJim Page
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
INSP-Sprinkler Rough-in/Hydro6/22/20176/23/20176/23/2017APASS
DetailsJim Page
Rough to cover inspection complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping complete.
Fees Due Hold6/17/2017 6/21/2017 DONE
DetailsChristina Prado
Fees Due Hold6/15/2017 6/16/2017 DONE
DetailsChristina Prado
INSP-Sprinkler Rough-in/Hydro6/14/20176/15/20176/15/2017ACANC
DetailsJim Page
Inspection request cancelled per conversation with Chris, request will be rescheduled for a later date.
Fees Due Hold6/10/2017 6/14/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check6/9/2017 6/9/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/9/2017 DONE
DetailsTim Frost
Permit Ready to Issue  6/9/2017 DONE
Issue and Print Permit  6/9/2017 DONE
Inspection Record Card- Fire6/9/2017 6/9/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check3/2/2017 3/2/2017 FAIL
DetailsTim Frost
Miscellaneous action  3/2/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check12/28/2016 12/28/2016 FAIL
DetailsTim Frost
1st review completed  12/28/2016 FAIL
DetailsTim Frost
Miscellaneous action  12/28/2016 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  12/27/2016 PASS
Plan assigned to (Tim)12/27/2016 12/27/2016 DONE
DetailsTim Frost
Application received  12/15/2016 DONE
Application submitted via PDS Online on Dec 15 2016 9:39AM