Information based on query as of Monday, May 6, 2024.
Permit Information
Permit NumberFIR18-00915
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 1001 S ORCHARD ST
Project NameBCACHA - TI
Customer Number 
ePlanReviewYes
Description
Tenant Improvement Only affects Wet System only of 15,685 Sq Ft single Level bldg. Adding and relocating heads to accommodate for new walls and ceilings. Piping shall remain the same unless otherwise noted.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/11/20192/12/20192/12/2019APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/7/20192/11/20192/11/2019PFAIL
DetailsTroy Cobbley
Need to have access to verify the insulation has been installed since the ceiling were put in.


Contact Leroy Anderson ###-#### 30 min prior to Fire Final start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Scott Carter II
INSP-Sprinkler Rough-in1/3/20191/4/20191/4/2019PPART
DetailsTroy Cobbley
Rough-in passed but piping can not be covered until the barrier above the ceiling has been repaired/re-installed. One head in a corridor needs to be re-located to match plans and will be checked at the next inspection.


Please contact Brad Westbrook 30 mins prior inspection. Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in1/2/20191/4/20191/3/2019PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro12/26/201812/27/201812/27/2018APASS
DetailsTroy Cobbley
Piping in the two rooms that have been marked "ok" can be covered. I spoke to Leroy about the large note that if any ceiling exceed 10' then plan modifications will be needed.

rough to cover for sheet rock // Austin Phone #: ###-####
Sprinkler Plan Check12/17/2018 12/17/2018 PASS
DetailsMark Stumbaugh
All ceilings to be 10'-0" or lower, or revised hydraulic calculations will be required
PLANS/APPL TAKEN TO FRONT DESK  12/17/2018 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  12/17/2018 DONE
met
Issue and Print Permit  12/17/2018 DONE
Application received  12/5/2018 DONE
Application submitted via PDS Online on Dec 5 2018 8:35AM
Plan assigned to (Tim)12/5/2018 12/5/2018 DONE
DetailsMark Stumbaugh
Intake Approval  12/5/2018 PASS
DetailsTim Frost