Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberFIR19-00004
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 3455 N WINSOME RD
Project NameCHRISTENSEN RESIDENCE
Customer Number 
ePlanReviewYes
Description
PLAN MOD Approved 2-13-2019***MAS***TFSS TO INSTALL A NEW NFPA 13D FIRE SPRINKLER SYSTEM IN THIS NEW SINGLE FAMILY DWELLING
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/27/20198/27/20198/27/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete, irrigation isolation not required on flow switch activation, irrigation on seperate non-potable water line and not part of the treated domestic water system.

Call before heading out, thank you Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in3/25/20193/26/20193/26/2019APASS
DetailsJim Page
All tenting in place at time of inspection, overehad fire sprinkler piping approved for cover, approval sticker is placed by riser.

Tenting Inspection - Call James if there are any issues. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in3/5/20193/5/20193/5/2019APART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete, piping between conditioned spaces approved for cover, tenting not installed at time of inspection, piping in attic spaces requiring tenting not approved for cover.
INSP-Sprinkler Rough-in/Hydro3/4/20193/5/20193/5/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Please call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Plan assigned to (Stumbaugh)2/4/2019 2/13/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check2/13/2019 2/13/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/13/2019 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  2/13/2019 DONE
approved mod, no fees per Mark
CHANGE STATUS TO (ISS)  2/13/2019 DONE
Plan Modification Accepted  2/4/2019 DONE
adding a double check backflow device. Eplan workflow started.
Issue and Print Permit  1/8/2019 DONE
Sprinkler Plan Check1/3/2019 1/7/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/7/2019 PASS
DetailsMark Stumbaugh
Permit Ready to Issue  1/7/2019 DONE
met
Application received  1/3/2019 DONE
Application submitted via PDS Online on Jan 3 2019 1:46PM
Intake Approval  1/3/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/3/2019 1/3/2019 DONE
DetailsMark Stumbaugh