INSP-Final Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Contact is Morgan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled due to time constraints due to work load. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler, fire alarm and fire alarm communicator trades need to be coordinated together to complete this inspection. Provide a record of testing from the monitoring service as discussed. Smoke detector in dayroom is over 23 feet from corner, relocate for code compliance. Provide fan shutdown on large ceiling fan on appuratus floor. Fire alarm system is an engineered system, a resubmittal for plan mod is required to show the addition of the smoke detector in the captians quarters and the addition of the fan shutdown relay. No devices were tested and monitoring was not verified.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan Modification Accepted | | | 10/15/2019 | | DONE |
|
|
|
as built per morgan with protex
|
Plan assigned to (Lee) | 10/15/2019 | | 10/15/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 10/15/2019 | | PASS |
|
|
|
|
1st review completed | | | 10/15/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/15/2019 | | 10/15/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/15/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 10/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/15/2019 | | DONE |
|
|
|
AS BUILT
|
Plan resubmittals received | | | 4/17/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 4/16/2019 | | 4/17/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/17/2019 | | DONE |
|
|
|
Passed with comments and drawing notes.
|
Permit Ready to Issue | | | 4/17/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 4/17/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 2/20/2019 | | 2/20/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/20/2019 | | FAIL |
|
|
|
See 1st review comments.
|
Application received | | | 2/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 19 2019 2:45PM
|