INSP-Final Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Contact is Roy Fouts Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining fire sprinkker piping in scope of work complete, approved for cover.
Contact is Roy Fouts Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Final Inspection | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | CANC |
Jim Page
|
|
|
Contact is Chris looking for anytime after 1 Phone #: ###-#### >> Inspection requested via web by Chris Green Inspection cancelled from web by: Chris Green
|
INSP-Final Inspection | 12/16/2019 | 12/16/2019 | 12/16/2019 | A | FAIL |
Troy Cobbley
|
|
|
I spoke to office who put me to voice mail. I went to job site as well and found locked doors. No inspection could be performed. Contact is Chris please call a half hour in advance. he is working in Nampa. Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Final Inspection | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | CANC |
Jim Page
|
|
|
Cancelled per conversation with Robert, ceiling elevation was changed which affected sidewall positioning, will be requested for a later date.
Contact is Nick Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | PART |
Troy Cobbley
|
|
|
** Pass Partial Rough OK to cover hard lids in offices. MAS***
Jimmy is your contact Phone #: ###-#### >> Inspection requested via web by Chris Green
|
CHANGE STATUS TO (ISS) | | | 10/8/2019 | | DONE |
|
|
|
plan mod fee paid
|
Plan Modification Accepted | | | 10/7/2019 | | DONE |
|
|
|
upright protection drawings, cloud ceilings
|
Plan assigned to (Stumbaugh) | 10/7/2019 | | 10/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/7/2019 | | 10/7/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
Fee $65.00
|
Permit Ready to Issue | | | 10/7/2019 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 9:28AM
|
Intake Approval | | | 9/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/23/2019 | | 9/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/23/2019 | | 9/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/23/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 9/23/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/23/2019 | | DONE |
|
|
|
|