INSP-Final Inspection | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Please call Logan with Questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | FAIL |
Troy Cobbley
|
|
|
*** FAIL No ceiling tiles installed. Heads not installed in tiles. MAS***
We would like to perform this inspection in conjunction with fire lie safety final for bld.
Please call Logan with questions and time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Logan Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Issue and Print Permit | | | 9/25/2019 | | DONE |
|
|
|
|
Application received | | | 9/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 24 2019 8:47AM
|
Intake Approval | | | 9/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/24/2019 | | 9/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/24/2019 | | 9/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/24/2019 | | DONE |
|
|
|
met
|