Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD17-01549
StatusFinaled
Name PERKINS CONSTRUCTION
Site Address 2855 W LOCKHEED LN
Project NameCity of Boise ARFF BLDG
Customer NumberBLD17-00386
ePlanReview 
Description
(CITY OF BOISE AIR RESCUE & FIRE FIGHTING STATION)(AT BOISE AIRPORT) space pending permit for future tenant. (**GREEN BUILDING - EXPEDITED REVIEW**) This permit is for the 4,344 sq. ft. unoccupied space associated with BLD17-00386. A separate building permit is required for occupancy of this space. This building is fully fir sprinklered and alarmed. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20201/9/20201/9/2020PDONE
DetailsJim Storey
Inspection requested via web by Ron Goff
DOC - Permit Finaled1/9/20201/9/20201/9/2020PPASS
DetailsJim Storey
as dircted bt planreviewer
FIRE-Final Inspection1/8/20201/9/20201/9/2020APASS
DetailsTroy Cobbley
Life safety passed. Phone #: ###-#### Inspection requested via web by Ron Goff
FIRE-Alarm Testing1/8/20201/9/20201/9/2020ACANC
DetailsTroy Cobbley
Permit BLD19-01885 finaled for FED EX. No inspection required. **JHB** Phone #: ###-#### >> Inspection requested via web by Ron Goff
FIRE-Sprinkler Rough-in1/8/20201/9/20201/9/2020ACANC
DetailsTroy Cobbley
Permit BLD19-01885 finaled for FED EX. No inspection required. **JHB** Phone #: ###-#### >> Inspection requested via web by Ron Goff
FIRE-Final Inspection1/7/20201/8/20201/8/2020AFAIL
DetailsJim Page
Per project description, no occupancy under this permit, items/vehicles are parked/stored inside, a seperate permit for occupancy needs to be issued or items need to be removed from space as discussed.

Phone #: ###-#### Inspection requested via web by Ron Goff
BLD-Final1/7/20201/8/20201/8/2020PCANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Ron Goff Inspection cancelled from web by: Ron Goff
FIRE-Sprinkler Rough-in1/7/20201/8/20201/8/2020ACANC
DetailsJim Page
Wrong inspection type requested, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Ron Goff
FIRE-Alarm Testing1/7/20201/8/20201/8/2020ACANC
DetailsJim Page
Wrong inspection type requested, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Ron Goff
BLD-Ceiling Grid Inspection5/24/20195/24/20195/24/2019APASS
DetailsJim Storey
Call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
BLD-Energy code compliance4/26/20194/26/20194/26/2019PPART
DetailsBrandon Shaw
Early afternoon, if possible. Call when at the gate. Thanks. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
BLD-Aging Inspection4/25/20194/25/20194/25/2019 PASS
DetailsJim Storey
FIRE-Conference4/23/20194/23/20194/23/2019PDONE
DetailsTroy Cobbley
Renee and I discussed the location for the building address and agreed for it to be placed on the east side of the hose tower.
BLD-Ceiling Grid Inspection4/17/20194/17/20194/17/2019APASS
DetailsJim Storey
Please call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
BLD-Ceiling Grid Inspection2/6/20192/7/20192/7/2019APASS
DetailsJim Storey
Call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
BLD-Framing/Rough-in12/12/201812/12/201812/12/2018PPASS
DetailsDave Hannah
Early afternoon, if possible. Project is in secure area at Airport. Please call when you are at the Gate (Gate 30) Phone #: ###-#### Inspection requested via web by Harvey VanderVeen ph 3 ok to cover
BLD-Ceiling Grid Inspection9/13/20189/13/20189/13/2018APART
DetailsDave Hannah
Please call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen kitchen commanders room and bunk area ok to flood
BLD-Framing/Rough-in7/5/20187/6/20187/6/2018APASS
DetailsJim Storey
Call when at the gate. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen phase 2 ok to cover pending trade aprovals// 11/2 insulation north/south walls to roof deck/
BLD-Energy code compliance6/6/20186/6/20186/6/2018APASS
DetailsJim Storey
Please call when at the gate. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen vapor barrior ok in kitchen area under slab
BLD-Footing5/7/20185/7/20185/7/2018PPASS
DetailsJim Storey
Concrete is scheduled for 2:00 pm. Please call when at the gate for admittance on to property. Thanks. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen ft and wall ok for placement.
BLD-Energy code compliance2/8/20182/9/20182/9/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Harvey VanderVeen vapor barrior in place for slab placment/ rebar ok
BLD-Foundation11/16/201711/16/201711/16/2017PPASS
DetailsJim Storey
Around 2:30 PM, if possible. Call when at the gate. Thanks Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
BLD-Foundation11/16/201711/16/201711/16/2017PCANC
DetailsJim Storey
Right after lunch, if possible. They would like to pour around 2:00 PM Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
BLD-Footing11/8/201711/9/201711/9/2017PPASS
DetailsJim Storey
After lunch, if possible. Call when at the gate for admittance into secure Airport Property Phone #: ###-#### Inspection requested via web by Harvey VanderVeen mti pending