Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD17-02141
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 1636 S HADLEY AVE
Project NameBoise Skin Clinic
Customer Number 
ePlanReviewYes
Description
(BOISE SKIN CLINIC) (GRD17-00049) (BLD17-02820 FOUNDATION) (DRH17-00293) **(11/02/17 PLAN MODIFICATION TO REDUCE ROOF OVERHANG AT NORTH ELEVATION) Permit for the construction of a new 3,318 sq. ft., 1-story wood framed Type VB construction building with concrete slab for a new medical office. Grading and Foundation completed under previously issued permits. Special inspections required for Wood Construction, Soils, and EIFS per Form 310. Construction to be per the approved plans and the attached engineering. This building is not fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/2/20184/2/20184/2/2018 PASS
DetailsMike Jordan
BLD-Final1/31/20182/1/20182/1/2018APASS
DetailsMike Jordan
Rod Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection1/30/20181/31/20181/31/2018APASS
DetailsTroy Cobbley
life safety passed

Rod Phone #: ###-####
FIRE-Final Inspection1/26/20181/29/20181/29/2018AFAIL
DetailsTroy Cobbley
Need small documents, need four emergency lights repaired, need address, need fire dept signage, need Grading permit inspected/signed off.

Rod Phone #: ###-####
FIRE-Final Inspection1/26/20181/26/20181/26/2018PCANC
DetailsTroy Cobbley
Canceled due to time constraints

Rod Phone #: ###-####
BLD-Ceiling Grid Inspection1/16/20181/17/20181/17/2018APASS
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in12/1/201712/1/201712/1/2017PPASS
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Other10/26/201710/27/201710/27/2017APASS
DetailsBrandon Shaw
Draft stopping
BLD-Energy code compliance10/25/201710/26/201710/26/2017APASS
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in10/26/201710/26/201710/26/2017PPASS
DetailsMike Jordan
Rod Phone #: ###-####. previous framing issues resolved. Exterior walls, and roof system ok to cover.
BLD-Wall Bracing10/23/201710/24/201710/24/2017ACANC
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in10/24/201710/24/201710/24/2017APART
DetailsMike Jordan
Rod Phone #: ###-####. Complete lateral bracing and complete truss repairs. Also discussed installation of draft stop.
BLD-Wall Bracing10/6/201710/6/201710/6/2017PPASS
DetailsMike Jordan
shear - rod Phone #: ###-####. Exterior shear walls ok.