BLD-Final | 8/5/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Jim Storey
|
|
|
Call ahead to meet // Ann Phone #: ###-#### 30 min before.
|
BLD-Final | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | CANC |
Jim Storey
|
|
|
Call to meet out there // Ann Phone #: ###-####
|
FIRE-Final Inspection | 7/31/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Ann Phone #: ###-####
|
BLD-Aging Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | CANC |
Jim Page
|
|
|
Due to the history of this permit, the point of contact is going to reschedule for when Troy Cobbley is back in the office, this request is cancelled per conversation with point of contact.
Ann Phone #: ###-####
|
BLD-Final | 3/12/2019 | 3/14/2019 | 3/14/2019 | A | CANC |
Jim Storey
|
|
|
Ann Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2019 | 3/13/2019 | 3/13/2019 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final inspection due to needing the fire sprinkler work permited and a fire sprinkler monitoring system installed. There are still other life safety items as marked on the plans that need addressed. Ann Phone #: ###-####
|
BLD-Final | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | CANC |
Jim Storey
|
|
|
Ann Phone #: ###-####
|
BLD-Conference | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Jim Storey
|
|
|
Conference - Chad Phone #: ###-####
|
BLD-Final | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | DEFR |
Jim Storey
|
|
|
Conference - Chad Phone #: ###-####
|
FIRE-Final Inspection | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide correct exit door hardware. See city approved plans for items high lighted.
Chad Phone #: ###-####
|
FIRE-Final Inspection | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled for the following day per conversarion with point of contact.
Chad Phone #: ###-####
|
BLD-Final | 1/29/2019 | 1/31/2019 | 1/31/2019 | P | CANC |
Jim Storey
|
|
|
Ann Phone #: ###-#### Cancel per Ann Mofit
|
FIRE-Final Inspection | 1/29/2019 | 1/31/2019 | 1/31/2019 | A | CANC |
Troy Cobbley
|
|
|
Ann Phone #: ###-#### Cancel per Ann Mofit
|
Extend Permit 90/180 days | | 1/14/2019 | 1/14/2019 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Recieved email request Ann and Chad Moffat dated 1/10/19
|
BLD - Request for Extension | 1/9/2019 | 1/10/2019 | 1/10/2019 | P | DEFR |
Jim Storey
|
|
|
Call for access- Ann Phone #: ###-#### Adele Schaffeld-Griffin Assistant Building Official
Planning and Development Services
Office: ###-####
aschaffeldgriffin@cityofboise.org
|
BLD-Final | 8/25/2017 | 8/29/2017 | 8/29/2017 | P | NR |
Jim Storey
|
|
|
Chad Phone #: ###-#### fire sent back to planreview resch.
|
FIRE-Final Inspection | 8/25/2017 | 8/29/2017 | 8/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn deadbolt and provide single action hardware. Keyed is ok on the main exit as discussed. Provide annual inspection tag for fire extinguishers. Provide correct building address and suite number.
Provide annual inspection of the fire sprinkler system and provide fire sprinkler monitoring. Chad Phone #: ###-####
|