BLD-Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 11/1/2018 | 11/2/2018 | 11/2/2018 | P | PART |
Jim Sly
|
|
|
Mark Phone #: ###-#### OK for Temp. Occ. Zoning on Bond. OK for Perm Occ. when ........Zoning and ACHD signs off for Perm. Occ. Talked to Bill Gaul at ACHD 208 387 6100.
|
FIRE-Final Inspection | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Mark Phone #: ###-####
|
FIRE-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | CANC |
Troy Cobbley
|
|
|
Mark Phone #: ###-####
|
FIRE-Final Inspection | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Troy Cobbley
|
|
|
Still need all of the emergency lights over the sales floor repaired and tested.
Mark Phone #: ###-####
|
BLD-Final | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | NR |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
FIRE-Final Inspection | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit discharge light at the stockroom exit door, provide exit sign on mezzanine, provide all emergency lighting as per the city approved plans.
Mark Phone #: ###-####
|
FIRE-Conference | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | DONE |
Troy Cobbley
|
|
|
Mark and I went over the typical life safety requirements. He did not have the updated plans or any of the small documents.
Mark Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/7/2018 | 9/7/2018 | 9/10/2018 | P | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PEND |
Dave Hannah
|
|
|
just to do boarder tiles// Mark Phone #: ###-#### ok to cover main area after other trades sign off
|
BLD-Framing/Rough-in | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-#### pharm and receiving areas ok to cover
|
BLD-Framing/Rough-in | 8/2/2018 | 8/6/2018 | 8/6/2018 | A | PART |
Jim Sly
|
|
|
Mark ###-#### OK to cover Front Canopy, Corridor, restrooms and locker room.
|
BLD-Framing/Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PART |
Jim Sly
|
|
|
Mark Phone #: ###-#### South 2/3 of bldg....OK
|
BLD-Framing/Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PART |
Jim Sly
|
|
|
Mark Phone #: ###-#### OK to rock.......Elevator, Mezzanine and Walls 4 foot down from Ceiling.
|
BLD-Conference | 6/20/2018 | 6/20/2018 | 6/21/2018 | P | DONE |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
BLD-Other | 5/22/2018 | 5/22/2018 | 5/23/2018 | P | PART |
Jim Sly
|
|
|
Mark -a rebar placement and masonery wall- 8 foot lift on columns and 12 ft lift on drive thru Phone #: ###-####
|
BLD-Other | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PART |
Jim Sly
|
|
|
rebar in masonry wall // 24 foot lift west wall // Mark Phone #: ###-#### OK pending MTI insp, tests and approvals.
|
BLD-Other | 5/18/2018 | 5/18/2018 | 5/21/2018 | P | PART |
Jim Sly
|
|
|
Mark Project--rebar replacemt masonery wall-24 foot lift so and west walls Phone #: ###-#### MTI on site
|
BLD-Other | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PART |
Jim Sly
|
|
|
Mark-masonary wall to grout south and west wall 20'' Phone #: ###-#### OK pending MTI special inspection,tests and approvals.
|
BLD-Foundation | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | CANC |
Jim Sly
|
|
|
16ft lift south wall Rebar // Mark Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Wall Bracing | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PART |
Jim Sly
|
|
|
Mark-wall rebar placing-south wall and west wall 8 foot lift Phone #: ###-####MTI on site
|
BLD-Other | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PART |
Jim Sly
|
|
|
rebar- 4ft lift south wall Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 5/7/2018 | 5/8/2018 | 5/8/2018 | P | PART |
Jim Sly
|
|
|
Rebar... 24ft lift north wall // Mark Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PART |
Brandon Shaw
|
|
|
Rebar.. 24 ft. lift east wall
|
BLD-Foundation | 5/4/2018 | 5/4/2018 | 5/6/2018 | P | PART |
Jim Sly
|
|
|
Mark-masonary rebar-pour time 2:00 noth wall 20 ft lifts Phone #: ###-####
|
BLD-Footing | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PART |
Jim Sly
|
|
|
Masonry wall, rebar, 20ft lift N & E walls - Mark Phone #: ###-#### MTI on site
|
BLD-Foundation | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Jim Sly
|
|
|
Rebar... 16ft list mes.wall north and est // Mark Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Other | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PART |
Brandon Shaw
|
|
|
rebar placement & masonry wall east and north walls OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PART |
Jim Sly
|
|
|
sub-grade rebar - Mark Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PART |
Jim Sly
|
|
|
Mark-8'' lift-east wall and north wall Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PART |
Jim Sly
|
|
|
Mark-rebar on 4ft lift masonary wall on east and north walls Phone #: ###-#### OK pending MTI special inspection, Tests and Approvals.
|
BLD-Footing | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PART |
Jim Sly
|
|
|
Mark-rebar Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PART |
Jim Sly
|
|
|
Mark-pour time 2:30 Phone #: ###-#### Exterior Wall footings....OK pending MTI special inspections, tests and approvals.
|