Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberBLD17-03648
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 367 N ANCESTOR PL
Project NameEpisciences Manufacturing Faci
Customer Number 
ePlanReviewYes
Description
(EPISCIENCES MANUFACTURING) This building is fire sprinklered for area increase and story increase. Permit for the construction of a new 18,446 sq. ft., 2-story concrete tilt-up building for a makeup manufacturing and office facility and associated site work. Scope of work includes: construction of slab on grade concrete foundation, concrete tilt up construction, second floor, interior non-bearing walls, restrooms, electrical, mechanical, plumbing, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. All work shall comply with the approved plans, DRH16-00360 and all applicable codes. Note: Special Inspections Required, see form 310. Note: complies with ANSI/ASHREA 90.1. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/201812/18/201812/18/2018APASS
DetailsMike Jordan
Tony Phone #: ###-####. OK for perm occ.
BLD-Final12/13/201812/14/201812/14/2018ANR
DetailsMike Jordan
Tony Phone #: ###-####. Needs both mech. permits finaled first.
BLD-Final11/14/201811/15/201811/15/2018PPASS
DetailsMike Jordan
Tony Phone #: ###-####. OK for temp occ. Will be ok for perm occ. once trades sign perm.
FIRE-Final Inspection11/14/201811/15/201811/15/2018APASS
DetailsTroy Cobbley
life safety passed

Tony Phone #: ###-####
FIRE-Final Inspection11/13/201811/14/201811/14/2018PFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm and fire sprinkler permit is addressed.

Tony Phone #: ###-####
BLD-Final11/14/201811/14/201811/14/2018AFAIL
DetailsMike Jordan
Tony Phone #: ###-####. Provide code compliant hardware on west stair.
FIRE-Conference11/7/201811/7/201811/7/2018PDONE
DetailsTroy Cobbley
I verified exit light and emergency light function
BLD-Ceiling Grid Inspection10/18/201810/18/201810/18/2018PPASS
DetailsMike Jordan
Ceiling grid for soffits in ware house ok.
BLD-Ceiling Grid Inspection10/17/201810/18/201810/18/2018ACANC
DetailsMike Jordan
Jose Phone #: ###-####.
BLD-Ceiling Grid Inspection10/3/201810/3/201810/3/2018PPASS
DetailsJim Storey
Jose Phone #: ###-####
BLD-Ceiling Grid Inspection9/27/20189/27/20189/27/2018PPASS
DetailsMike Jordan
Jose Phone #: ###-####. 1st. Floor only ok, pending sprinkler rough in.
BLD-Ceiling Grid Inspection9/25/20189/26/20189/27/2018ACANC
DetailsMike Jordan
Jose Phone #: ###-####
BLD-Ceiling Grid Inspection9/26/20189/26/20189/27/2018PCANC
DetailsMike Jordan
BLD-Other8/6/20188/7/20188/7/2018ACANC
DetailsMike Jordan
Jose-plenum wall Phone #: ###-####
BLD-Energy code compliance8/2/20188/2/20188/2/2018PPASS
DetailsMike Jordan
Jose Phone #: ###-####. 2nd.floor ok.
BLD-Energy code compliance7/30/20187/31/20187/31/2018APASS
DetailsMike Jordan
Jose Phone #: ###-####. Exterior walls, north of gridline 2 only, 1st. floor.
BLD-Framing/Rough-in7/31/20187/31/20187/31/2018APART
DetailsMike Jordan
Jose Phone #: ###-####. Interior steel stud framed walls, 1st. and 2nd. floors north of gridline 2. pending plumbing rough in inspection.
BLD-Framing/Rough-in7/12/20187/13/20187/13/2018APART
DetailsMike Jordan
Jose Phone #: ###-####. Interior steel stud framed walls from gridlines 2 to 5 ok. Pending plumbing rough in inspection. Also noted that a select number of the interior full height walls are to be plenum walls. Electrical and plumbing inspectors were notified, as there are additional requirements.
BLD-Framing/Rough-in6/22/20186/25/20186/26/2018APASS
DetailsMike Jordan
Jose Phone #: ###-####. Exterior steel stud columns ok.
BLD-Footing3/12/20183/13/20183/13/2018APART
DetailsMike Jordan
Jose Phone #: ###-####. Interior column pad footings and exterior perimter footings. Pending special inspection.