BLD-Final | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Scott Phone #: ###-####
|
BLD-Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O has been OK'd...
|
FIRE-Final Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | A | PART |
Jim Page
|
|
|
TCO for fire life safety approved per conversation with Ron Johnson for 30 days for vendor/employee training only. Once fire alarm permit is finaled then life fire safety can be signed off as finaled.
Schedule to come at the same time as the Fire Alarm inspection. Thanks Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Final Inspection | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | CANC |
Troy Cobbley
|
|
|
Need the project related FIR permits scheduled and finaled prior to a life safety inspection.
Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Final Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | FAIL |
Jim Page
|
|
|
FIR permits for fire alarm, fire alarm communicator and hood suppression system needs to be completed and finaled before life fire safety inspection can be completed.
Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PART |
Brandon Shaw
|
|
|
Need Engineer fix for two broken trusses at BLDG B main entry... OK to isulate...
|
BLD-Energy code compliance | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PART |
Brandon Shaw
|
|
|
Air Seal inspection for area A.
|
BLD-Energy code compliance | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PART |
Brandon Shaw
|
|
|
Air seal BLDG- C to common area
|
BLD-Framing/Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PART |
Brandon Shaw
|
|
|
Area C shower stall drywall and tape
|
BLD-Framing/Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PART |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Brandon Shaw
|
|
|
BLDG D- OK to cover exterior and one side of individual units
|