Information based on query as of Tuesday, May 7, 2024.
Permit Information
Permit NumberBLD18-01002
StatusIssued
Name JH DEVELOPMENT INC
Site Address 1443 S GALAXY WAY
Project Name 
Customer NumberGRD18-00005/ESC18-00109
ePlanReviewNo
Description
***8-10-19 - PLAN MODIFICATION TO GRADING AND DRAINGE PLAN*** HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. *This structure is required to have a NFPA 13D fire sprinkler system.* Permit for the construction of a new 6206 sq. ft., two story with 643 sq. ft. unfinished basement (first story 5563 sq. ft., second story 643 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 320 sq. ft. of covered patio/porch and a 1330 sq. ft. attached garage per the approved plans and any notations. R-1A/DA zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference8/8/20198/9/20198/9/2019ADONE
DetailsBrandon Shaw
Eric Phone #: ###-####
BLD-Conference8/1/20198/1/20198/1/2019PDONE
DetailsBrandon Shaw
Pre-final walk thru...
BLD-Conference6/20/20196/20/20196/20/2019ADEFR
DetailsBrandon Shaw
Work in progress...
BLD-Aging Inspection6/20/20196/20/20196/20/2019 CANC
DetailsBrandon Shaw
BLD-Aging Inspection6/19/20196/19/20196/19/2019 CANC
DetailsBrandon Shaw
BLD-Energy code compliance2/4/20192/5/20192/5/2019APASS
DetailsBrandon Shaw
Eric Phone #: ###-####
BLD-Framing/Rough-in1/3/20191/3/20191/3/2019PPEND
DetailsBrandon Shaw
OK to insulate pending..."cpvc piping compatibility with the insulation spray foam needs to be verified prior to cover on any of the vertical sprinkler lines." As per Troy Cobbley...
BLD-Foundation11/15/201811/15/201811/15/2018PCANC
DetailsBrandon Shaw
Inspection requested via web by Ben Sears.Pool permit is BLD18-03830
BLD-Footing11/8/201811/9/201811/9/2018PCANC
DetailsBrandon Shaw
Retaining wall
BLD-Footing11/8/201811/8/201811/8/2018ANR
DetailsBrandon Shaw
Need soil sub-grade submitted and approved by PW...
BLD-Wall Bracing10/22/201810/22/201810/22/2018PPART
DetailsDave Hannah
call 1 hr before to meet (will be in nampa) // mike Phone #: ###-#### needs to install 6 hold downs retro 3 ok to rap house
BLD-Foundation6/21/20186/22/20186/22/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Ben Sears
Work in progress.....appears OK.
BLD-Foundation6/20/20186/21/20186/21/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation6/20/20186/20/20186/20/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Ben Sears Inspection cancelled from web by: Ben Sears
BLD-Footing6/13/20186/14/20186/14/2018APASS
DetailsBrandon Shaw
Work in progress
Last footing pour for this permit
BLD-Foundation6/1/20186/1/20186/1/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing5/17/20185/18/20185/18/2018APASS
DetailsBrandon Shaw
Work in progress- rain/standing water
BLD-Footing5/16/20185/17/20185/17/2018ANR
DetailsBrandon Shaw
Dewater and clear sediment/mud as needed