Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberBLD18-01760
StatusFinaled
Name RRC CONTRACTORS
Site Address 999 W MAIN ST
Project NameJacobs - 10th & 12th Floor
Customer NumberBLD18-01055 VANILLA
ePlanReviewYes
Description
(JACOBS – 10th and 12th FLOOR) //Plan modification for fire wall locations and removal of room #105 repro room from scope of work on the 10th floor. 11-27-2018 JG// Permit is to remodel the 10th and 12th floor within the existing building (approximately 9,304 sq. ft. on the 10th floor and 17,572 sq. ft. on the 12th floor, tenant to occupy part of the 10th floor and all of the 12th floor) Note: the demo work was done under BLD18-01055. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: on the construction of interior non-bearing walls creating tenant demising walls, offices, break rooms, storage room, equipment room, phone rooms, conference rooms, closets, wellness room, privacy rooms, lan room, work rooms, reception areas, server room and open office areas, new door/door frames, millwork, interior windows, suspended acoustic and gypsum ceilings/soffits, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: corridor is to be 1-hour rated with 20 min. rated doors, the intervening restroom and small electric/telephone/closet rooms shall have the rated wall wrap around them. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/1/20192/4/20192/4/2019APASS
DetailsDave Hannah
Please call prior to arrival for access to building floors-Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Final1/31/20192/1/20192/1/2019ANR
DetailsMike Jordan
Ron Phone #: ###-####
BLD-Final10/29/201810/29/201810/29/2018PPART
DetailsDave Hannah
zack Phone #: ###-#### ok for tco
FIRE-Final Inspection10/29/201810/29/201810/29/2018PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Derek Phone #: ###-####
FIRE-Final Inspection10/26/201810/29/201810/29/2018ACANC
DetailsJim Page
zack Phone #: ###-####
BLD-Final10/26/201810/29/201810/29/2018ANR
DetailsDave Hannah
zack Phone #: ###-####
BLD-Final10/26/201810/26/201810/26/2018PNR
DetailsDave Hannah
Dereck-wants temp c of o Phone #: ###-####
FIRE-Final Inspection10/26/201810/26/201810/26/2018APART
DetailsJim Page
Partial final inspection for life fire safety inspection complete. TCO authorized for life safety pending fire alarm completion associated with project. Permit for life fire safety can be finaled when remaining noted items on fire alarm are complete.

Dereck-wants temp c of o Phone #: ###-####wants temp c of o
FIRE-Conference10/25/201810/26/201810/26/2018ADONE
DetailsJim Page
Fire conference complete

Zack Phone #: ###-####
BLD-Ceiling Grid Inspection10/23/201810/23/201810/24/2018ADONE
DetailsDave Hannah
Derek Phone #: ###-####
BLD-Ceiling Grid Inspection10/24/201810/24/201810/24/2018APASS
DetailsDave Hannah
Derek Phone #: ###-####
BLD-Ceiling Grid Inspection10/22/201810/23/201810/23/2018ANR
DetailsMike Jordan
Please call Derek or Zach 30 Minutes prior to arriving.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald. No call back and no access to jobsite. Will need to reschedule.
BLD-Framing/Rough-in10/9/201810/9/201810/9/2018PPASS
DetailsDave Hannah
This inspection is for hard lid soffits on floor 10. Please call upon arrival and I will get you up to the floor. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Ceiling Grid Inspection10/2/201810/3/201810/3/2018APART
DetailsBrandon Shaw
12th floor phase 1...
BLD-Framing/Rough-in9/18/20189/19/20189/19/2018APART
DetailsDave Hannah
Zack Phone #: ###-#### hard lids soffits ok to cover
BLD-Framing/Rough-in8/16/20188/16/20188/16/2018PPASS
DetailsDave Hannah
Rough framing on 10th floor minus plumbing wall at South west area. Please call upon arrival and I can bring you to the floor I will be back onsite at 1:00 pm today.

Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Framing/Rough-in8/6/20188/7/20188/7/2018APASS
DetailsDave Hannah
Please call upon arrival for access for 12th floor framing inspection. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald