Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-03119
StatusFinaled
Name BRADLEY J CHRISTENSEN
Site Address 3455 N WINSOME RD
Project NameChristensen Home - Winsome
Customer Number 
ePlanReviewYes
Description
|> FIRE SPRINKLER REQUIRED <|
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 4,619 sq. ft., two story (first story 2,359 sq. ft., second story 2,260 sq. ft.) single family dwelling with 5 bedrooms, 3 and a half bathrooms, approximately 304 sq. ft. of covered patio/porch and a 947 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20199/18/20199/19/2019PDONE
DetailsTony Young
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.

Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.

If all goes well, we are hoping to move in this weekend.

Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
BLD-Final9/18/20199/19/20199/19/2019APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Brad Christensen
DOC - Permit Finaled9/19/20199/19/20199/19/2019PPASS
DetailsTony Young
BLD-Blower Door Test Results9/18/20199/19/20199/19/2019ADONE
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Brad Christensen// 3.1
BLD-Blower Door Test Results9/13/20199/18/20199/18/2019PNR
DetailsTony Young
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.

Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.

If all goes well, we are hoping to move in this weekend.

Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
BLD-Final9/13/20199/13/20199/13/2019PPART
DetailsTony Young
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.
all ok ,, just needs hinges set on the garage entry and the blower door test results
Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.

If all goes well, we are hoping to move in this weekend.

Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
BLD-Aging Inspection8/9/20198/9/20198/14/2019 PEND
DetailsTony Young
BLD-Aging Inspection8/8/20198/8/20198/9/2019 PEND
DetailsTony Young
BLD-Energy code compliance3/26/20193/27/20193/27/2019APASS
DetailsTony Young
Hi Tony- We are rolling - insulation will be all done by this afternoon - maybe later a little better. If you want to call when you''re headed, I''ll meet you there.

Brad Phone #: ###-#### Inspection requested via web by Brad Christensen
BLD-Energy code compliance3/26/20193/26/20193/26/2019PPART
DetailsTony Young
Hi Tony- We are rolling - insulation will be all done by this afternoon - maybe later a little better. If you want to call when you''re headed, I''ll meet you there.

Brad Phone #: ###-#### Inspection requested via web by Brad Christensen,, work in progress,, will come back on wed.
BLD-Framing/Rough-in3/21/20193/22/20193/22/2019APART
DetailsTony Young
Would you please call me so I can meet you there for any items. Thanks. Brad Phone #: ###-#### Inspection requested via web by Brad Christensen/// ok to insulate,, ,, needs another fire sprinkler inspection
BLD-Framing/Rough-in3/20/20193/21/20193/21/2019PPART
DetailsTony Young
Would you please call me so I can meet you there for any items. Thanks. Brad Phone #: ###-#### Inspection requested via web by Brad Christensen/// fixes are work in progress
BLD-Framing/Rough-in3/20/20193/20/20193/20/2019PPART
DetailsTony Young
Would you please call me so I can meet you there for any items. Thanks. Brad Phone #: ###-#### Inspection requested via web by Brad Christensen,, frame walk through,, need truss engineering,, will reinspect prior to insulation,, needs final approval for fire sprinklers
BLD-Wall cover2/4/20192/4/20192/4/2019PPASS
DetailsBrandon Shaw
Shear walls
Work in progress...
BLD-Conference1/31/20191/31/20191/31/2019APART
DetailsTony Young
Hey Tony- just want to go through some things with you. Please call when you’re headed my way. Thanks much. Phone #: ###-#### Inspection requested via web by Brad Christensen/// walk through on frame
BLD-Conference1/16/20191/23/20191/23/2019ACANC
DetailsTony Young
Client cancel conference, will call back-Call ahead 15 minutes // Brad Phone #: ###-####
BLD-Foundation11/21/201811/26/201811/26/2018APASS
DetailsTony Young
Brad Phone #: ###-####
BLD-Footing11/20/201811/20/201811/20/2018PPASS
DetailsTony Young
Willy Phone #: ###-####
BLD-Footing11/19/201811/20/201811/20/2018ANR
DetailsTony Young
pour time 12:30-Willy Phone #: ###-####