BLD-Final | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PART |
Dave Hannah
|
|
|
Taylor-still needs mec final & P&Z ok''d a temp Phone #: ###-#### ok for temp occ ok for perm occ after others go perm
|
FIRE-Final Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for sprinklers complete, final inspection for fire alarms complete, hood suppression system inspection complete. Final life fire safety inspection for area of work complete.
Taylor Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | CANC |
Jim Page
|
|
|
Fire alarms and hood suppression system inspection did not happen, this request is cancelled and will need to be rescheduled to coincide with fire alarm and hood suppression inspection.
call 10 mins ahead- Tyler Phone #: ###-####
|
BLD-Conference | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Taylor Phone #: ###-####
|
BLD-Conference | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | DONE |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
FIRE-Final Inspection | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler, hood suppression (FIR19-00178 is for the hood suppression) and fire alarm permits are still in issued status and have not had final inspections, FIR permits for fire alarm, fire sprinkler and hood suppression must be inspected and finaled before life fire safety can be completed.
Taylor Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
BLD-Other | 1/28/2019 | 1/28/2019 | 1/30/2019 | P | PASS |
Dave Hannah
|
|
|
Taylor-dry wall Phone #: ###-####
|
BLD-Framing/Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
BLD-Framing/Rough-in | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | DEFR |
Jim Storey
|
|
|
Taylor Phone #: ###-#### out of time
|
BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PART |
Mike Jordan
|
|
|
Taylor Phone #: ###-####. Ok to one side walls. Needs to complete fire caulking on through penetrations in floor. Ok to insulate and install base layer on 2hr. fire wall.
|