Description
(Koelsch Elementary) Proposed new stand-alone cafeteria building at Koelsch Elementary. The new building has a cafeteria space, full cooking kitchen, restrooms, and a custodian closet. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/18/201912/19/201912/19/2019APASS
DetailsTell Riley
Jay Phone #: ###-####//signed card--final occupancy ok//
FIRE-Final Inspection12/17/201912/18/201912/18/2019APASS
DetailsTroy Cobbley
Life safety passed.

Call for access 30 mins- Jay Phone #: ###-####
BLD-Aging Inspection12/17/201912/17/201912/18/2019 PASS
DetailsTell Riley
WIP
FIRE-Final Inspection10/17/201910/18/201910/18/2019APART
DetailsTroy Cobbley
A temporary for life safety is ok with the fire dept approval until the existing fire dept access as been modified as discussed to cut back the trees and provide a ramp. jay Phone #: ###-####
BLD-Final10/14/201910/17/201910/17/2019PPASS
DetailsTell Riley
Jay Phone #: ###-####/for temporary occupancy only//need final statement from special inspections//will need permanant signatures prior to permanant occupancy//
FIRE-Final Inspection10/11/201910/14/201910/14/2019PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit inspected/finaled for a temporary to be given due to the fire dept access issues.

jay Phone #: ###-####
FIRE-Final Inspection10/2/201910/3/201910/3/2019PFAIL
DetailsTroy Cobbley
The fire dept access needs addressed as discussed, need K class fire extinguisher, need thumbturn deadbolt on Kitchen door addressed, need the project related fire alarm and hood suppression permits finaled. Jay Phone #: ###-####
BLD-Ceiling Grid Inspection9/19/20199/20/20199/20/2019APASS
DetailsTell Riley
JAY Phone #: ###-####
BLD-Conference8/26/20198/26/20198/26/2019PDONE
DetailsTell Riley
Jay Phone #: ###-####
BLD-Framing/Rough-in7/2/20197/3/20197/3/2019PPASS
DetailsTell Riley
Jay Phone #: ###-####//ok to cover walls//trades rough ins complete//call for grid inspection//
BLD-Concrete5/2/20195/2/20195/2/2019PPART
DetailsJim Sly
CMU-Jay Phone #: ###-####
Up to 4 feet........OK pending MTI special inspection, tests and approvals.
BLD-Foundation3/19/20193/20/20193/21/2019PPEND
DetailsDave Hannah
Jay Phone #: ###-#### ok after spec inspection sign off
BLD-Footing3/15/20193/18/20193/18/2019APASS
DetailsDave Hannah
Jay- Would like to pour by 10 am please Phone #: ###-####