Permit Information
Permit NumberBLD18-04288
StatusFinaled
Name FORGE BUILDING COMPANY LLC
Site Address 55 N ALLUMBAUGH ST
Project NameStor-it Self Storage Bldg 2
Customer Number 
ePlanReviewYes
Description
(STOR-IT SELF STORAGE – BUILDING #2) (DRH17-00528) The fire sprinkler system is used for building area increase, for fire area, and for fire flow. To construct a new 81,165 square foot, 2 story self-storage building. The 1st story will have a total floor area of about 41,270 square feet with 150 individual self-storage units (4 less than 25 square feet, 6 between 26 square feet and 50 square feet, 55 between 51 and 100 square feet, 84 between 101 square feet and 150 square feet, 16 between 151 square feet and 200 square feet, and 40 between 201 square feet and 300 square feet). The 2nd story will have a total floor area of about 39,895 square feet with 360 individual self-storage units (21 less than 25 square feet, 140 between 26 square feet and 50 square feet, 150 between 51 square feet and 100 square feet, 48 between 101 square feet and 150 square feet, and 1 between 151 square feet and 200 square feet). Thirteen (13) self-storage units on the 1st story will be accessible to the disabled (9 at 142 square feet each and 4 at 93 square feet each). Seventeen (17) self-storage units on the 2nd story will be accessible to the disabled (3 at 142 square feet each, 11 at 93 square feet each, and 3 at 70 square feet each). This building is one of five buildings on this site. Work is to include concrete footings; minimum 4” thick concrete slab on grade thickened at roll-up doors, bearing walls, and exterior walls; concrete slabs on grade at loading docks; steel stud bearing and shear walls; steel shear panels; post-installed anchors in hardened concrete; steel pan deck with 4.5 inch concrete fill for the 2nd story floor; two 1-hr stairway enclosures with a steel stairways inside each; two elevators with elevator machine rooms and concrete elevator pits; steel columns for elevator framing; exterior windows on the 2nd story; non-rated corridors on both stories; steel exterior siding; steel roof purlins; steel box headers at doors; steel beams; steel strap roof braces; steel drag struts; steel roof panels; metal gutters; exterior side-hinged swinging doors; and roll-up doors. Special Inspection is required for soils, for concrete, for structural steel (including welding and bolting), and for post-installed anchors in hardened concrete. About 24,309 square feet on the 1st story and the entire 39,895 square foot 2nd story of this building will be conditioned and is required to have a thermal envelope in compliance with the 2015 IECC. About 16,961 square feet of the 1st story will NOT be conditioned or have a thermal envelope. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/2/20204/3/20204/3/2020PPASS
DetailsMike Jordan
Please call in advance. No Superintendent on premises and gate requires code for access. Phone #: ###-#### Inspection requested via web by Ian Franklin
FIRE-Final Inspection4/2/20204/3/20204/3/2020APASS
DetailsTroy Cobbley
Life safety passed.

Please call in advance. Phone #: ###-#### Inspection requested via web by Ian Franklin
FIRE-Final Inspection4/1/20204/1/20204/1/2020PFAIL
DetailsTroy Cobbley
Corrections for life safety have been made. Life safety can be given a temp when a permit has been issued for the racking in Building E as discussed. Or a final when the racking permit for Building E is finaled.

Corrections have been made. Please contact me before heading to the site. Superintendent will be coming and going throughout the day. I want to make sure we have a representative to walk with you. Phone #: ###-#### Inspection requested via web by Ian Franklin
FIRE-Final Inspection3/26/20203/30/20203/30/2020PFAIL
DetailsTroy Cobbley
Provided additional emergency lighting as discussed. Need the racking permit addressed in Building E as discussed. Other life safety items appear ok.

Phone #: ###-#### Inspection requested via web by Ian Franklin
BLD-Conference2/24/20202/24/20202/24/2020PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Wall cover12/3/201912/3/201912/3/2019PPASS
DetailsMike Jordan
insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Energy code compliance12/3/201912/3/201912/3/2019PPASS
DetailsMike Jordan
insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Framing/Rough-in11/6/201911/7/201911/7/2019APASS
DetailsMike Jordan
drywall inspection for firewall on stairs and elevators building two Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Other9/30/20199/30/20199/30/2019PPASS
DetailsMike Jordan
Rebar and 6x6 mesh building two second floor and screw inspection on the deck second floor Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Concrete9/26/20199/26/20199/26/2019PCANC
DetailsMike Jordan
second floor rebar and 6x6 mesh inspection and decking screw inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Other9/5/20199/5/20199/5/2019PPART
DetailsDave Hannah
Insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell ground floor east west and south walls ok
BLD-Framing/Rough-in8/29/20198/30/20198/30/2019PPASS
DetailsMike Jordan
Southend of building two Phone #: ###-#### Inspection requested via web by Glen Farrell. SW4 type shearwalls ok for insulation,
BLD-Other8/26/20198/26/20198/26/2019PPASS
DetailsMike Jordan
Rebar inspection at loading docks building two Phone #: ###-#### Inspection requested via web by Glen Farrell. Reinforcement for slab on grade.
BLD-Other8/7/20198/8/20198/8/2019APASS
DetailsMike Jordan
rebar inspection building two southend Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Other7/26/20197/29/20197/29/2019PPASS
DetailsMike Jordan
Rebar inspection middle section building one and BLD18 -04286 middle section building two Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Footing7/23/20197/24/20197/24/2019PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Glen Farrell//interior footings on large building//rebar ok pendinngs special inspections///
BLD-Footing7/19/20197/22/20197/22/2019APASS
DetailsMike Jordan
Rebar inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Footing7/2/20197/3/20197/3/2019APART
DetailsMike Jordan
Glen- Building 2 rebar footing inspection Phone #: ###-####. North footing. Work in progress on installing dowels. Ok to place concrete pending special inspection.
BLD-Foundation6/26/20196/27/20196/27/2019APART
DetailsMike Jordan
rebar.. pour at 11 // Glenn Phone #: ###-####. East, West and south perimeter footings. Special inspector to verify installation of #4 dowels at 4ft. oc for cold joint. Also noted elevator pit slabs have been placed. Contractor noted that it was inspected by All West (special inspections agency).