Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberBLD19-00142
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 300 W FORT ST
Project NameFort Boise Learning Center
Customer NumberBLD19-00605 INT DEMO
ePlanReviewYes
Description
(FORT BOISE LEARNING CENTER) (BLD19-00605 Int Demo) Permit for renovations to an existing school. Work to include: demo of interior non-bearing partition walls and doors; new exterior ramp and stairs; repairing existing roof; new restrooms, entry vestibule, kitchen, and classrooms; plumbing, electrical, and mechanical work; and interior finishes in compliance with Ch. 8 of the 2015 IBC. The 1-hour fire resistance rating of the corridor is to be maintained. This is a scope of work permit only with a certificate of completion to be issued upon completion and approval of the project. This building is NOT fire sprinklered. This building has an approved Fire Alarm system. Any alterations or modifications to the building’s Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/18/20199/18/20199/18/2019PPASS
DetailsJim Page
Fire alarm issues have been resolved under FIR19-00588, final life fire safety inspwection for areas of work complete.
BLD-Final9/4/20199/5/20199/5/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Final8/8/20198/12/20198/9/2019APART
DetailsDave Hannah
Doug Phone #: ###-#### ok for 30 day temp occ needs to add handrails to ext stairs change door hardwear on ext door out of pre k rm
FIRE-Final Inspection8/8/20198/8/20198/8/2019PPART
DetailsJim Page
Partial final inspection for life fire safety inspection complete, final sign off is contingent upon FIR19-00588 being completed for the out of sync correction for fire alarm system. Scope of work for JCI on the fire alarms is complete, no fire sprinklers, fire extinguishers are placed with current inspection tags. 30 day TCO authorized per conversation with Romeo Gervais with Boise Fire for life fire safety.

Rescheduled by Doug for PM inspection when JCI can have a technician on site. 208.860.1445
FIRE-Final Inspection8/8/20198/9/20198/8/2019PNR
DetailsMark Scharfen
JCI unable to be on site till 8/9/2019-Afternoon to sound off horn strobes to make sure audibility noticed on last inspection has been repaired. Rescheduled.

Doug Phone #: ###-####
BLD-Final8/7/20198/8/20198/8/2019PDONE
DetailsDave Hannah
Please call when in route.

Thanks,

Doug S. Phone #: ###-#### >> Inspection requested via web by Brandon Grote
FIRE-Final Inspection8/7/20198/7/20198/8/2019PDONE
DetailsMark Scharfen
Fire/life/safety inspection. Please call when in route.

Thanks,

Doug S. Phone #: ###-#### >> Inspection requested via web by Brandon Grote
FIRE-Final Inspection7/29/20198/2/20198/2/2019PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Doug Storey
FIRE-Conference7/18/20197/19/20197/18/2019ACANC
DetailsJim Page
Room 102 (Front Office) Phone #: ###-#### >> Inspection requested via web by Doug Storey Inspection cancelled from web by: Doug Storey
BLD-Conference7/18/20197/18/20197/18/2019PPASS
DetailsDave Hannah
Room 102 Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Ceiling Grid Inspection6/13/20196/14/20196/14/2019PPASS
DetailsDave Hannah
Rooms 102, 132, 130 please. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Framing/Rough-in5/15/20195/16/20195/16/2019APASS
DetailsDave Hannah
Room 100, 130 Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Framing/Rough-in5/9/20195/10/20195/10/2019APASS
DetailsJim Storey
Rooms 107A, 106A, 148, 131 Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Foundation5/8/20195/8/20195/8/2019APASS
DetailsDave Hannah
South Entry Stem Walls. Would like to pour about noon. Not sure if this has been looked at yet. Thank You. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Foundation5/7/20195/7/20195/8/2019PPASS
DetailsDave Hannah
South Entry Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Energy code compliance4/23/20194/24/20194/25/2019PPASS
DetailsDave Hannah
Rooms 130, 131, and 132. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Framing/Rough-in4/19/20194/22/20194/22/2019APART
DetailsJim Storey
Rooms 130, 131, 132. Phone #: ###-#### Inspection requested via web by Doug Storey ceilling ok to insulate// ok to cover all but corridor fur out wall need finsh gyp protection.
BLD-Framing/Rough-in4/11/20194/12/20194/12/2019PPASS
DetailsDave Hannah
Rooms 102 and 121 Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Footing3/27/20193/28/20193/28/2019APASS
DetailsDave Hannah
South Entry Footing, trying for a 12 pm noon pour. Thank you. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Conference3/27/20193/28/20193/28/2019APASS
DetailsDave Hannah
Architect would like to meet with building Inspector regarding walls in room 130. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Foundation3/26/20193/27/20193/27/2019ADONE
DetailsTony Young
Stem wall inspection, north entry.
Quality concrete is trying for a 9 am pour..
Thanks. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Footing3/25/20193/26/20193/26/2019APART
DetailsTony Young
Footing Inspection on North side of building. Would it be possible for a 7:30 am inspection.
Thank you. Phone #: ###-#### Inspection requested via web by Doug Storey,, entry footing