BLD-Blower Door Test Results | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | DONE |
Tell Riley
|
|
|
4.41 ACH50
|
BLD-Final | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Tell Riley
|
|
|
Vinnie Phone #: ###-####//added smoke carbon combo near master--verified by text//final complete//
|
DOC - Permit Finaled | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Tell Riley
|
|
|
Vinnie Phone #: ###-####//should be energy//
|
BLD-Framing/Rough-in | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tell Riley
|
|
|
Vinnie Phone #: ###-####//corrections made//enginering fix provided and completed for cantilever beam//
|
BLD-Energy code compliance | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | FAIL |
Tell Riley
|
|
|
vinny Phone #: ###-####//need to fix framing of cantilever beam//
|
BLD-Framing/Rough-in | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | FAIL |
Tell Riley
|
|
|
vinny Phone #: ###-####//site conditions on cantilevered beam do not match provided engineering//
|
BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PART |
Tell Riley
|
|
|
Vinnie Phone #: ###-####//see correction notice onsite//ok to insulate only//
|
BLD-Wall Bracing | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Tell Riley
|
|
|
Vinny Phone #: ###-####
|
BLD-Foundation | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Tell Riley
|
|
|
Jerry- foundation wall Phone #: ###-####
|
BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Tell Riley
|
|
|
Dane Phone #: ###-####//setbacks ok per plans//
|