Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD19-02307
StatusFinaled
Name CBH HOMES
Site Address 5967 S STURGEON WAY
Project NameLOT 06 BLK 01 FORK SOUTH SUB
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2025sq' one story single family dwelling with 4 bedrooms, 2 bathrooms, approximately 64sq' of covered patio/porch and a 658sq' attached garage per the approved plans, notations, local codes & ordinances. R-1C zoning and setbacks per Zoning. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/14/20201/14/20201/14/2020PPASS
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled1/14/20201/14/20201/14/2020PPASS
DetailsMike Jordan
BLD-Blower Door Test Results1/14/20201/14/20201/14/2020PDONE
DetailsMike Jordan
4.3
BLD-Final1/9/20201/10/20201/10/2020ACANC
DetailsMike Jordan
garage door code is 2468 Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Energy code compliance11/13/201911/14/201911/14/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in11/13/201911/14/201911/14/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle.
BLD-Framing/Rough-in11/11/201911/12/201911/12/2019AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on A06 truss. The A07 truss next to A06 trus appeares to have been modified in the field, justify. Nail of B3G 2ply per the engineering. Roll block trusses at shear wall locations. ok to insulate. Correction notice posted.
BLD-Framing/Rough-in11/8/201911/8/201911/8/2019PNR
DetailsBrandon Shaw
Air seal not done at time of inspection...
BLD-Framing/Rough-in11/8/201911/8/201911/8/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Joel Hirtle needs air seal package installed
BLD-Wall Bracing10/28/201910/29/201910/29/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing10/24/201910/25/201910/25/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation10/1/201910/2/201910/2/2019APASS
DetailsTell Riley
jerry Phone #: ###-####
BLD-Foundation9/30/201910/1/201910/1/2019PNR
DetailsMike Jordan
dANE- FOUNDATION WALL Phone #: ###-####
BLD-Footing9/27/20199/30/20199/30/2019PPASS
DetailsMike Jordan
Jerry Phone #: ###-####