Information based on query as of Wednesday, May 8, 2024.
Permit Information
Permit NumberBLD19-02972
StatusFinaled
Name CH PRO LLC
Site Address 8729 W HOLBROOK AVE
Project Name8729 W HOLBROOK AVE BOISE , ID
Customer Number 
ePlanReviewYes
Description
**PASSES USING UA TRADE OFF** Permit for the construction of a new 2047 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 248 sq. ft. of covered patio/porch and a 1155 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/13/20201/14/20201/14/2020APASS
DetailsTell Riley
call prior vedad Phone #: ###-####//final complete when bollard added to protect mechanical-discussed with Vedad onsite//
DOC - Permit Finaled1/14/20201/14/20201/14/2020PPASS
DetailsTell Riley
BLD-Blower Door Test Results1/14/20201/14/20201/14/2020ADONE
DetailsTell Riley
3.95 ACH 50
BLD-Wall cover1/10/20201/13/20201/13/2020ACANC
DetailsTell Riley
Vedad Phone #: ###-####
BLD-Energy code compliance1/10/20201/13/20201/13/2020ANR
DetailsTell Riley
Vedad Phone #: ###-####//for final will need R 49 per Res check trade offs//
BLD-Energy code compliance10/23/201910/24/201910/24/2019APASS
DetailsTell Riley
please call for access- Vedad Phone #: ###-####//truss rengineering provided for cut trusses//
BLD-Conference10/16/201910/16/201910/16/2019PDONE
DetailsTell Riley
Vedad Phone #: ###-####//ok to insulate//waiting on engineer truss fix//
BLD-Framing/Rough-in10/11/201910/15/201910/15/2019PFAIL
DetailsTell Riley
call half hour before to meet // Vedad Phone #: ###-####//need truss fix engineering for cut trusses and truss with added webing//add studs to plate breaks//add vapor barier and seal at corner tub//
BLD-Framing/Rough-in10/10/201910/11/201910/11/2019PCANC
DetailsTell Riley
Call 15 mins ahead- Vedad Phone #: ###-####//need mechanical//will re schedule for monday//
BLD-Wall Bracing10/7/201910/7/201910/7/2019PPASS
DetailsTell Riley
Call 30 minutes ahead // Kobic Phone #: ###-####
BLD-Wall Bracing10/3/201910/4/201910/4/2019AFAIL
DetailsTell Riley
Vedad Phone #: ###-####//correction notice posted//shear needs to be blocked per plan and nailing per engineering//
BLD-Wall Bracing9/26/20199/27/20199/27/2019PFAIL
DetailsTell Riley
shear // Vedad Phone #: ###-####//need engineering for tall walls//add straps to header at portal frame//correction notice posted//
BLD-Foundation9/5/20199/6/20199/6/2019PPART
DetailsTell Riley
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//wip....///
BLD-Footing9/4/20199/5/20199/5/2019PPART
DetailsTell Riley
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks measured from west end of home where property pins are visible//wip//