BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Tell Riley
|
|
|
call prior vedad Phone #: ###-####//final complete when bollard added to protect mechanical-discussed with Vedad onsite//
|
DOC - Permit Finaled | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 1/14/2020 | 1/14/2020 | 1/14/2020 | A | DONE |
Tell Riley
|
|
|
3.95 ACH 50
|
BLD-Wall cover | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | CANC |
Tell Riley
|
|
|
Vedad Phone #: ###-####
|
BLD-Energy code compliance | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | NR |
Tell Riley
|
|
|
Vedad Phone #: ###-####//for final will need R 49 per Res check trade offs//
|
BLD-Energy code compliance | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Tell Riley
|
|
|
please call for access- Vedad Phone #: ###-####//truss rengineering provided for cut trusses//
|
BLD-Conference | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | DONE |
Tell Riley
|
|
|
Vedad Phone #: ###-####//ok to insulate//waiting on engineer truss fix//
|
BLD-Framing/Rough-in | 10/11/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Tell Riley
|
|
|
call half hour before to meet // Vedad Phone #: ###-####//need truss fix engineering for cut trusses and truss with added webing//add studs to plate breaks//add vapor barier and seal at corner tub//
|
BLD-Framing/Rough-in | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | CANC |
Tell Riley
|
|
|
Call 15 mins ahead- Vedad Phone #: ###-####//need mechanical//will re schedule for monday//
|
BLD-Wall Bracing | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Tell Riley
|
|
|
Call 30 minutes ahead // Kobic Phone #: ###-####
|
BLD-Wall Bracing | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | FAIL |
Tell Riley
|
|
|
Vedad Phone #: ###-####//correction notice posted//shear needs to be blocked per plan and nailing per engineering//
|
BLD-Wall Bracing | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | FAIL |
Tell Riley
|
|
|
shear // Vedad Phone #: ###-####//need engineering for tall walls//add straps to header at portal frame//correction notice posted//
|
BLD-Foundation | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | PART |
Tell Riley
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//wip....///
|
BLD-Footing | 9/4/2019 | 9/5/2019 | 9/5/2019 | P | PART |
Tell Riley
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks measured from west end of home where property pins are visible//wip//
|