BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//add VB over window headers//add stud where cut for bearing//add studd to header over stairs-joey will send photos//other framing ok per plans or in compliance with engineers changes and verbal walk through based on the first 8 units inspected//
|
BLD-Framing/Rough-in | 6/12/2020 | 6/12/2020 | 6/12/2020 | A | PASS |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//ok to insulate//see Joey onsite for correction notes//
|
BLD-Wall Bracing | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PART |
Tell Riley
|
|
|
Firewall Inspection requested via web by Carl Funk//interior gyp shear wall//ok to cover when screws have been added at blocking lines on each floor as discussed//screws per details and email from engineer for gyp shear walls//
|
BLD-Energy code compliance | 5/18/2020 | 5/18/2020 | 5/18/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
|
BLD-Energy code compliance | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | NR |
Tell Riley
|
|
|
Insulation Firewall Inspection requested via web by Carl Funk//need to fix R21/add R21 in areas noted on walk through//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//fire separation walls only//need verification on fire rating on heater box(all units)//other corrections made//ok to insulate fire separation walls only//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | FAIL |
Tell Riley
|
|
|
Fire blocking firewall Phone #: ###-#### Inspection requested via web by Carl Funk/framing for fire walls ONLY//add nuts and bolts in areas noted//add studs in areas noted//add fire blocking in areas noted//see details for truss connections at fire walls//complete air seal//
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//need to add nails, fix hold downs nails//did walk through with carl//add hold downs where needed//
|
BLD-Foundation | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PART |
Tell Riley
|
|
|
SERGIO- wall foundation inspection Phone #: ###-####//wip//
|
BLD-Footing | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PART |
Tell Riley
|
|
|
Sergio Phone #: ###-####//ok when verts added to meet 32" requrement//
|