Description
(STOR-IT SELF STORAGE – Building 1A and Building 1B) Permit to construct two new storage buildings to replace fire damaged and demolished storage building (demo permit under BLD19-02405). New storage buildings are 3,185 sq. ft. storage building 1A + 8,085 sq. ft. storage building 1B (total 11,270 sq. ft. in area). Scope of work includes: construction of footing foundation, slab on grade concrete floor, construction of steel stud framed exterior walls with metal siding, metal roof purlins with a metal roof, metal storage unit partition panels, new overhead doors, electrical work. This building is not fire sprinkled. Note: special inspection required see attached form #310. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/31/20204/1/20204/1/2020PPASS
DetailsMike Jordan
Please call 15 minutes before inspection for access to project. Late in the day if possible. Phone #: ###-#### Inspection requested via web by Ian Franklin
BLD-Final3/27/20203/27/20203/27/2020PCANC
DetailsMike Jordan
BLD-Final3/26/20203/27/20203/27/2020ACANC
DetailsMike Jordan
Please call before arrival. Project is behind locked gates and no superintendent is on site. I am 15 minutes from the job site. Phone #: ###-#### Inspection requested via web by Ian Franklin. Moved to pm inspection.
FIRE-Final Inspection3/25/20203/26/20203/26/2020APASS
DetailsTroy Cobbley
Life safety passed.

Building numbers are installed, extinguishers mounted, and gate hardware exchanged. Review docs are on site with approved plans. Phone #: ###-#### Inspection requested via web by Ian Franklin
BLD-Final3/24/20203/25/20203/25/2020PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ian Franklin Inspection cancelled from web by: Ian Franklin
FIRE-Final Inspection3/24/20203/24/20203/24/2020PFAIL
DetailsTroy Cobbley
Provide plans and small documents, provide fire extinguishers. May need single action hardware on the man gate as discussed.

Opticom has been tested by fire house #6
3/18/20 Phone #: ###-#### Inspection requested via web by Ian Franklin
BLD-Wall cover2/13/20202/14/20202/14/2020APASS
DetailsMike Jordan
fire wall inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Framing/Rough-in2/11/20202/12/20202/12/2020APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Wall cover1/23/20201/24/20201/24/2020APASS
DetailsMike Jordan
and insulation in the fire wall Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Framing/Rough-in1/20/20201/21/20201/21/2020APASS
DetailsMike Jordan
can the inspector ring and hour before he goes there as i,am working on to jobs thanks Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Footing12/19/201912/19/201912/19/2019PPASS
DetailsMike Jordan
can they ring before they come Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD-Footing12/17/201912/17/201912/17/2019PCANC
DetailsMike Jordan
rebar Inspection Phone #: ###-#### Inspection requested via web by Glen Farrell