Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD19-03482
StatusIssued
Name KB FINANCIAL LLC
Site Address 2310 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberBLD19-03482-03485
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** **FOUR TOWNHOMES UNDER EPLAN BLD19-03482** Permit for the construction of a new 1500 sq. ft., two story (first story garage, second story 1500 sq ft.) townhouse with 2 bedrooms, 2 bathrooms, approximately and a 668 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN ***Sprinklers not required***LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference8/6/20208/6/20208/7/2020PPASS
DetailsTony Young
want to discuss furnace room and fire door in garage Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Concrete4/30/20204/30/20204/30/2020PPART
DetailsTony Young
screened // Austin Phone #: ###-####
// upper foundation wall
BLD-Conference4/24/20204/27/20204/27/2020APASS
DetailsTony Young
want to discuss entry stairs and confirm framer fixes are acceptable Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Concrete4/22/20204/23/20204/23/2020APASS
DetailsTony Young
screened - rebar // Austin Phone #: ###-####
upper footings ok,, soils ok via e-mail
BLD-Energy code compliance4/21/20204/22/20204/22/2020APASS
DetailsTony Young
wall insulation in, would like to sheetrock Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Wall cover4/19/20204/20/20204/20/2020APASS
DetailsTony Young
Townhome has been airsealed, would like to install wall insulation and sheetrock Phone #: ###-#### Inspection requested via web by ron beckman// frame ok,, ok to insulate
BLD-Energy code compliance4/19/20204/20/20204/19/2020ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by ron beckman Inspection cancelled from web by: ron beckman
BLD-Conference4/16/20204/16/20204/16/2020PPART
DetailsTony Young
Would like fire wall framer fixes inspected and would like to insulate part of garage ceiling so garage doors can be installed to secure building Phone #: ###-#### Inspection requested via web by ron beckman// ok after sealing gaps in firewall,, ok to insulate garage areas
BLD-Conference4/6/20204/7/20204/7/2020APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by ron beckman// over build ?s on firewall.. needs to be all the way to roof deck on uppermost roof
BLD-Wall Bracing4/2/20204/3/20204/3/2020APASS
DetailsDave Hannah
additional hold downs were installed 4/2/2020. Would like to cover exterior walls for stucco prep Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Wall Bracing3/26/20203/27/20203/30/2020PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by ron beckman nailing of pannals ok but hold dows/bolting of portel frame panals not done
BLD-Conference3/24/20203/25/20203/25/2020ADONE
DetailsDave Hannah
Party wall ?s, please call ahead for access - Ron Phone #: ###-####
BLD-Foundation3/18/20203/18/20203/18/2020PPASS
DetailsDave Hannah
rebar // Austin Phone #: ###-####
BLD-Footing3/6/20203/9/20203/9/2020ACANC
DetailsTony Young
austin Phone #: ###-####// wrong permit called in
BLD-Wall Bracing3/3/20203/4/20203/4/2020APART
DetailsTony Young
Ron Phone #: ###-####,, upper firewalls ok
BLD-Framing/Rough-in2/21/20202/21/20202/21/2020PPART
DetailsTony Young
Ron Phone #: ###-####.. pony wall ok to cover
BLD-Wall Bracing2/18/20202/18/20202/19/2020PPART
DetailsTony Young
Ron Phone #: ###-####// lower garage firewall ok
BLD-Conference2/3/20202/3/20202/3/2020PPART
DetailsTony Young
Ron Phone #: ###-####,, ?s on walls,,
BLD-Foundation1/7/20201/8/20201/8/2020APART
DetailsTony Young
Austin Phone #: ###-####,, work in progress on upper foundation walls
BLD-Foundation12/20/201912/23/201912/23/2019APART
DetailsTony Young
Austin Phone #: ###-####.. upper level of home footings
BLD-Foundation12/4/201912/5/201912/5/2019PPART
DetailsTony Young
Austin Phone #: ###-####,, work in progress,, ok
BLD-Foundation11/20/201911/21/201911/21/2019APART
DetailsTell Riley
Austin Phone #: ###-####//garage section only//ok per plans//discussed covering for cold weather--will get blankets onsite//WIP//footings only//