Permit Information
Permit NumberBLD19-03650
StatusFinaled
Name RRC CONTRACTORS
Site Address 999 W MAIN ST Unit: STE 1300
Project NameCushman and Wakefield
Customer Number 
ePlanReviewYes
Description
(CUSHMAN AND WAKEFIELD – 13TH STORY) The fire sprinkler system is used for high rise. To convert the 13th story of an existing high rise building to a multi-tenant story. For exit separation reasons, the common corridor that leads to exit stairway enclosures is required to comply as a 1-hr fire-resistance-rated corridor with egress travel in both directions through the elevator vestibule. Work is to include smoke- and draft-control doors having a fire-protection-rating of at least 20 minutes. The restrooms and drinking fountains on this story are required to be upgraded to be fully accessible to the disabled. The restrooms were partially upgraded under permit BLD16-03862. To create a 6,254 square foot tenant space on the 16,920 square foot 13th story of an existing high rise building. Work is to include interior walls, interior doors, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection1/31/20201/31/20201/31/2020PPASS
DetailsJim Page
Permenant doors have been installed, final life fire safety inspection for scope of work is complete.

David Phone #: ###-####
BLD-Final1/31/20201/31/20201/31/2020PPASS
DetailsDave Hannah
David Phone #: ###-####
BLD-Final1/16/20201/16/20201/16/2020PPART
DetailsDave Hannah
zach Phone #: ###-#### ok for temp occ will need to finish doors
FIRE-Final Inspection1/15/20201/16/20201/16/2020APART
DetailsJim Page
Partial final life fire safety inspection complete, fire alarm inspection is complete, fire sprinkler inspection is complete, fire extiguishers are placed with current inspection tags. Premenant doors for elevator lobby are on order, temporary doors have been placed for smoke control. 30 day TCO authorized.

zach Phone #: ###-####
FIRE-Final Inspection1/14/20201/15/20201/15/2020ACANC
DetailsJim Page
Fire alarm permit is still in issued status, needs finaled before life fire safety can be completed, this request is cancelled.

Zach Phone #: ###-####
BLD-Conference1/13/20201/13/20201/14/2020PDONE
DetailsDave Hannah
Zack Phone #: ###-####
FIRE-Conference1/10/20201/13/20201/13/2020ADONE
DetailsJim Page
Fire conference complete, discussed temporary install of elevator lobby doors due to finish doors being on order, advised point of contact to discuss with structural, if no issue with structural inspector then doors/frames can be used for temp.

Zach Phone #: ###-####
BLD-Ceiling Grid Inspection12/20/201912/20/201912/20/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by David Sferle
BLD-Other12/20/201912/20/201912/20/2019PPASS
DetailsDave Hannah
Fire Corridor Inspection. Phone #: ###-#### Inspection requested via web by David Sferle
BLD-Other12/10/201912/11/201912/11/2019ANR
DetailsDave Hannah
13th floor fire corridor Inspection. Phone #: ###-#### Inspection requested via web by David Sferle
BLD-Framing/Rough-in11/14/201911/15/201911/15/2019APASS
DetailsDave Hannah
zack Phone #: ###-####