Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-04256
StatusFinaled
Name CBH HOMES
Site Address 10075 W CAMPVILLE ST
Project NameLOT 10 BLK 11 UNION SQUARE SUB
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2002 sq. ft., two story (first story 922 sq. ft., second story 1080 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 36 sq. ft. of covered patio/porch and a 462 sq. ft. attached garage per the approved plans and any notations. R-2-D zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/31/20204/1/20204/1/2020APASS
DetailsMike Jordan
We finally got the step installed. Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled4/1/20204/1/20204/1/2020PPASS
DetailsMike Jordan
All issues resolved.
BLD-Final3/3/20203/4/20203/4/2020PFAIL
DetailsMike Jordan
Front door is open Phone #: ###-#### Inspection requested via web by Joel Hirtle. Step from slider to patio exceeds the 7.75 max .
BLD-Blower Door Test Results3/4/20203/4/20203/4/2020PDONE
DetailsMike Jordan
3.1
BLD-Energy code compliance1/21/20201/22/20201/22/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in1/21/20201/22/20201/22/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in1/17/20201/21/20201/21/2020AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Missed bearing point on F7 floor truss. Provide approved fix for cut top chord on F13 floor truss. Ok to insulate.
BLD-Wall Bracing1/10/20201/10/20201/10/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing1/8/20201/10/20201/10/2020ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation12/16/201912/17/201912/17/2019PPART
DetailsMike Jordan
Dane- foundation wall Phone #: ###-####
BLD-Foundation12/13/201912/16/201912/16/2019PNR
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/12/201912/13/201912/13/2019PPART
DetailsMike Jordan
Dane - Phone #: ###-####
BLD-Foundation12/11/201912/12/201912/12/2019PCANC
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/10/201912/11/201912/11/2019PNR
DetailsMike Jordan
Dane Phone #: ###-####. No one on site. Concrete form work has not yet been constructed.