Permit Information
Permit NumberELE18-01606
StatusFinaled
Name SALMON ELECTRICAL CONTRACTORS INC
Site Address 2419 W FAIRVIEW AVE
Project NameAdare Manor Apartments
Customer Number3817
ePlanReviewNo
Description
Alteration: Electrical Work for Adare Manor/Building B
New Construction
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/23/20199/24/20199/23/2019APASS
DetailsMark Moncarr
Generator Room Phone #: ###-#### Inspection requested via web by Stephanie Huston Corrections were made to bonding. Generator is not attached to any life safety components. It is to be used for 4 laundry room fans
Electrical Rough-In9/19/20199/19/20199/19/2019PFAIL
DetailsMark Moncarr
Generator Equipment Room Phone #: ###-#### Inspection requested via web by Stephanie Huston For a seperately derived system, grounding and bonding of the generator is required as per 250.30(A)
Final9/17/20199/18/20199/18/2019APART
DetailsMark Moncarr
-NE and SE Stair Towers
-Janitor, Trash, Storage and Laundry Rooms for Floors 1,2,3, and 4
-1st floor Electrical Room 116 and Generator Room
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok for TCO for move in of non tenant related items. Not approved for occupancy at this time. Panel schedules need made, and a few areas need finished. No public access.
Final9/15/20199/16/20199/16/2019APART
DetailsMark Moncarr
Roof inspection A Building Phone #: ###-#### Inspection requested via web by Stephanie Huston Rooftop units partial
Final9/12/20199/13/20199/13/2019PCANC
DetailsMark Moncarr
Roof inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Taked to electrician said he needed to cancel
Electrical Rough-In8/30/20198/30/20198/30/2019APASS
DetailsMark Moncarr
Building B
1st, 2nd, 3rd and 4th Floor Laundry rooms grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Final8/29/20198/29/20198/29/2019PPART
DetailsMark Moncarr
B Building
2nd and 4th Floor Corridors Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for corridor lighting.
Final8/28/20198/28/20198/28/2019PPART
DetailsMark Moncarr
B Building
1st and 3rd Floor Corridors and corresponding rooms Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for areas listed.
Final8/27/20198/27/20198/27/2019PPART
DetailsMark Moncarr
B Building
1st Floor C area units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for areas listed.
Final8/19/20198/20/20198/20/2019PPART
DetailsMark Moncarr
2nd Floor Units C area
Rooms 221-223, 225, 227-229
Reinspect previous inspected units to confirm issues were addressed
Phone #: ###-#### Inspection requested via web by Stephanie Huston TR installed in various areas. Connectors installed for all hoods, and open ground issue in 1 recept addressed.
Final8/18/20198/19/20198/19/2019APART
DetailsMark Moncarr
Building B
3rd Floor Units C and D Area (321-323, 325, 327-341) 19 Units

If time with inspector allows:
2nd Floor C Units (221-223, 225, 227-229) 7 Units
4Th Floor C and D Units 421-423, 425, 427- 441) 19 Units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial on units listed. Most range hoods didnt have bushings for wire feeding them, a few non-tamper recepts, and a few open grds. Will verify on next inspection of 2nd floor E side.
Final8/15/20198/15/20198/15/2019PPART
DetailsMark Moncarr
B Building
2nd Floor D units Trim inspection
230-241
Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial final on rooms listed.
Final8/14/20198/14/20198/14/2019PPART
DetailsMark Moncarr
B Building
First floor D units trim inspection
Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for 1st floor Bldg D. In 1 bed units there 2 recepts that need replaced with GFI's, 6' from kitch sink. 2 bed units is 1 GFI needing installed, spark rings also. NO move in of furniture or other equiptment. I will need full access to all walls in all units. Will check these units for GFI's on next inspection.
Electrical Rough-In8/6/20198/6/20198/6/2019PPASS
DetailsMark Moncarr
B Building, 1st Floor Breezeway Grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover. Review notes for ele18-01605 for hardlid support of sheetrock
Electrical Rough-In7/17/20197/18/20197/18/2019APASS
DetailsMark Moncarr
B Building
4th floor north east corridor grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In7/15/20197/16/20197/16/2019APASS
DetailsMark Moncarr
B Building
North east 2nd and 3rd Floor Corridor Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 2nd and 3rd floors full N side corridors.
Electrical Rough-In7/9/20197/9/20197/9/2019PPASS
DetailsMark Moncarr
Building B
4th Floor East Corridor Drop Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover area listed.
Electrical Rough-In6/25/20196/25/20196/25/2019PPASS
DetailsMark Moncarr
B Building
2nd and 3rd Floor D Area Corridor Drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In6/14/20196/14/20196/14/2019PPASS
DetailsMark Moncarr
B building
1st Floor Laundry Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In6/11/20196/12/20196/12/2019APASS
DetailsMark Moncarr
2nd, 3rd and 4th Floor Laundry Room Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Permanent Service5/29/20195/30/20195/30/2019APASS
DetailsMark Moncarr
A Building
Electrical Room 116 Service Gear Phone #: ###-#### Inspection requested via web by Stephanie Huston p/s u/g n ok
Electrical Rough-In5/8/20195/8/20195/8/2019PPASS
DetailsMark Moncarr
B Building
1st Floor C Units Drop Lid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In5/5/20195/6/20195/6/2019PPASS
DetailsMark Moncarr
Building B
C Units
Drop lid 2nd, 3rd and 4th Floor Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In4/25/20194/26/20194/26/2019APASS
DetailsMark Moncarr
Building B 4th Floor A Units Grid
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Temporary Service4/22/20194/23/20194/23/2019ACANC
DetailsMark Moncarr
Temporary power relocation Phone #: ###-#### Inspection requested via web by Stephanie Huston Contractor called in a new T/S permit. Should not have been under this RI permit.
Electrical Rough-In4/17/20194/18/20194/18/2019APASS
DetailsMark Moncarr
Building B, A Area Trash room 123 Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In4/16/20194/16/20194/16/2019PPASS
DetailsMark Moncarr
C Area 2nd, 3rd and 4th Floor Corridor walls Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In4/15/20194/16/20194/16/2019APASS
DetailsMark Moncarr
Building B, D units 3rd floor drops. Stairway 3 1sr, 2nd, 3rd and 4th.
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In4/10/20194/10/20194/10/2019PPASS
DetailsMark Moncarr
B Building
4th floor 418, 413, 420, 421 Stair way 4 Floor 4 and 4th floor corridor walls D Area.
B/C common area entry way 1st floor lid.
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
Electrical Rough-In4/5/20194/8/20194/8/2019APASS
DetailsMark Moncarr
Return inspection for the following
Building B
4th Floor C Units rough in.
1st Floor C corridor walls

D common areas
1st Floor 122, 121 and stairway
2nd Floor D units grid, 211, 212, 213, 214, 215, and Stairway
3rd Floor 312, 314, 315, Corridor Walls and Stairway Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 3rd floor corridor. All insulation was removed for inspection.
Electrical Rough-In4/4/20194/5/20194/5/2019PFAIL
DetailsMark Moncarr
Building B
4th Floor C Units rough in.
1st Floor C corridor walls

D common areas
1st Floor 122, 121 and stairway
2nd Floor 211, 212, 213, 214, 215, and Stairway
3rd Floor 312, 314, 315, Corridor Walls and Stairway Phone #: ###-#### Inspection requested via web by Stephanie Huston Boise City Ordinance Section 4-05-23 Unlawful to Conceal. All insulation in 3rd floor corridor will be removed. Not just bays with boxes in them. This warning has been mentioned before on previous inspections. This includes foam seal and caulking of boxes.
Electrical Rough-In3/29/20194/1/20194/1/2019PPASS
DetailsMark Moncarr
Building B, C-Units 3rd ; 4th floors rough in inspection.
Building B, 1st floor grid inspection D-Units.
Phone #: ###-#### Inspection requested via web by James Kemner Ok cover 1st flr, D units ceilings, 3rd flr, C units, and 1st flr, C corridor.
Electrical Rough-In3/26/20193/27/20193/27/2019PPASS
DetailsMark Moncarr
Building B. C1 and C2 units rough in and D1 corridor walls
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover units listed. Asked electrician to let GC know that next time a rough inspection is done, exterior boxes need to be free of caulking. If caulking is installed prior to future RI inspections, it will all be removed before inspection will be completed.
Electrical Rough-In3/20/20193/21/20193/21/2019PPASS
DetailsMark Moncarr
B building 4th floor D units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 4th D units.
Electrical Rough-In3/18/20193/19/20193/19/2019PPASS
DetailsMark Moncarr
Building B, D units 4th floor rough in inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Area specified on inspection was not done due to re-framing. Inspection was done on 2nd floor corridor instead. Ok cover walls only.
Electrical Rough-In3/7/20193/11/20193/11/2019APASS
DetailsMark Moncarr
Building B, D units on 3rd floor rough in Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 3rd floor. Some nailplates missed, were installed while there.
Electrical Rough-In3/4/20193/6/20193/6/2019APART
DetailsMark Moncarr
Second floor D units, rough in and ceilings inspection. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 2nd floor Bldg D. For future inspections, all walls will need to be open. 2nd floor exterior walls were insulated. All terminal barriers in panels were installed.
Electrical Rough-In2/28/20193/1/20193/1/2019APASS
DetailsMark Moncarr
First floor D rough in inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 1st floor walls Bldg. D.
Electrical Rough-In2/15/20192/19/20192/19/2019APASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover exterior walls and ceilings in all units in Bldg D first floor.
Conference9/11/20189/13/20189/13/2018PDONE
DetailsMark Moncarr
Job walk and discussion about start of rough electrical. Anytime after 12 pm works for me. If possible call me when you are on your way to site. Phone #: ###-#### Inspection requested via web by Stephanie Huston Discussed the need to ensure interior wiring is not compromised by the weather. It is recommended that the upper 4th floor get dryed in to avoid damage from water.
Electrical Rough-In6/27/20186/27/20186/27/2018PPART
DetailsMark Moncarr
Underground outside building Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial cover for conduits going to transformer.
Electrical Rough-In6/14/20186/14/20186/14/2018APASS
DetailsMark Moncarr
Underground pipe next layer Inspection requested via web by Stephanie Huston Ok cover conduits.
Electrical Rough-In6/12/20186/12/20186/12/2018PPASS
DetailsMark Moncarr
Underground inspection east electrical room Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 6- 4" and 8-5" conduits for E side electrical room.
Electrical Rough-In4/30/20185/1/20184/30/2018APASS
DetailsMark Moncarr
Ufer Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover. Looked at on 4/30/18. 3/0 ufer attached rebar. Concrete was to be poured early morning of 5/1/18.