Final | 9/23/2019 | 9/24/2019 | 9/23/2019 | A | PASS |
Mark Moncarr
|
|
|
Generator Room Phone #: ###-#### Inspection requested via web by Stephanie Huston Corrections were made to bonding. Generator is not attached to any life safety components. It is to be used for 4 laundry room fans
|
Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | FAIL |
Mark Moncarr
|
|
|
Generator Equipment Room Phone #: ###-#### Inspection requested via web by Stephanie Huston For a seperately derived system, grounding and bonding of the generator is required as per 250.30(A)
|
Final | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PART |
Mark Moncarr
|
|
|
-NE and SE Stair Towers -Janitor, Trash, Storage and Laundry Rooms for Floors 1,2,3, and 4 -1st floor Electrical Room 116 and Generator Room Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok for TCO for move in of non tenant related items. Not approved for occupancy at this time. Panel schedules need made, and a few areas need finished. No public access.
|
Final | 9/15/2019 | 9/16/2019 | 9/16/2019 | A | PART |
Mark Moncarr
|
|
|
Roof inspection A Building Phone #: ###-#### Inspection requested via web by Stephanie Huston Rooftop units partial
|
Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Mark Moncarr
|
|
|
Roof inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Taked to electrician said he needed to cancel
|
Electrical Rough-In | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Mark Moncarr
|
|
|
Building B 1st, 2nd, 3rd and 4th Floor Laundry rooms grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Final | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PART |
Mark Moncarr
|
|
|
B Building 2nd and 4th Floor Corridors Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for corridor lighting.
|
Final | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PART |
Mark Moncarr
|
|
|
B Building 1st and 3rd Floor Corridors and corresponding rooms Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for areas listed.
|
Final | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PART |
Mark Moncarr
|
|
|
B Building 1st Floor C area units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for areas listed.
|
Final | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PART |
Mark Moncarr
|
|
|
2nd Floor Units C area Rooms 221-223, 225, 227-229 Reinspect previous inspected units to confirm issues were addressed Phone #: ###-#### Inspection requested via web by Stephanie Huston TR installed in various areas. Connectors installed for all hoods, and open ground issue in 1 recept addressed.
|
Final | 8/18/2019 | 8/19/2019 | 8/19/2019 | A | PART |
Mark Moncarr
|
|
|
Building B 3rd Floor Units C and D Area (321-323, 325, 327-341) 19 Units
If time with inspector allows: 2nd Floor C Units (221-223, 225, 227-229) 7 Units 4Th Floor C and D Units 421-423, 425, 427- 441) 19 Units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial on units listed. Most range hoods didnt have bushings for wire feeding them, a few non-tamper recepts, and a few open grds. Will verify on next inspection of 2nd floor E side.
|
Final | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PART |
Mark Moncarr
|
|
|
B Building 2nd Floor D units Trim inspection 230-241 Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial final on rooms listed.
|
Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PART |
Mark Moncarr
|
|
|
B Building First floor D units trim inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for 1st floor Bldg D. In 1 bed units there 2 recepts that need replaced with GFI's, 6' from kitch sink. 2 bed units is 1 GFI needing installed, spark rings also. NO move in of furniture or other equiptment. I will need full access to all walls in all units. Will check these units for GFI's on next inspection.
|
Electrical Rough-In | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Mark Moncarr
|
|
|
B Building, 1st Floor Breezeway Grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover. Review notes for ele18-01605 for hardlid support of sheetrock
|
Electrical Rough-In | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Mark Moncarr
|
|
|
B Building 4th floor north east corridor grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Mark Moncarr
|
|
|
B Building North east 2nd and 3rd Floor Corridor Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 2nd and 3rd floors full N side corridors.
|
Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Mark Moncarr
|
|
|
Building B 4th Floor East Corridor Drop Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover area listed.
|
Electrical Rough-In | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Mark Moncarr
|
|
|
B Building 2nd and 3rd Floor D Area Corridor Drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Mark Moncarr
|
|
|
B building 1st Floor Laundry Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Mark Moncarr
|
|
|
2nd, 3rd and 4th Floor Laundry Room Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Permanent Service | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Mark Moncarr
|
|
|
A Building Electrical Room 116 Service Gear Phone #: ###-#### Inspection requested via web by Stephanie Huston p/s u/g n ok
|
Electrical Rough-In | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Mark Moncarr
|
|
|
B Building 1st Floor C Units Drop Lid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 5/5/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Mark Moncarr
|
|
|
Building B C Units Drop lid 2nd, 3rd and 4th Floor Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Mark Moncarr
|
|
|
Building B 4th Floor A Units Grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Temporary Service | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | CANC |
Mark Moncarr
|
|
|
Temporary power relocation Phone #: ###-#### Inspection requested via web by Stephanie Huston Contractor called in a new T/S permit. Should not have been under this RI permit.
|
Electrical Rough-In | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Mark Moncarr
|
|
|
Building B, A Area Trash room 123 Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mark Moncarr
|
|
|
C Area 2nd, 3rd and 4th Floor Corridor walls Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
Mark Moncarr
|
|
|
Building B, D units 3rd floor drops. Stairway 3 1sr, 2nd, 3rd and 4th. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Mark Moncarr
|
|
|
B Building 4th floor 418, 413, 420, 421 Stair way 4 Floor 4 and 4th floor corridor walls D Area. B/C common area entry way 1st floor lid. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/5/2019 | 4/8/2019 | 4/8/2019 | A | PASS |
Mark Moncarr
|
|
|
Return inspection for the following Building B 4th Floor C Units rough in. 1st Floor C corridor walls
D common areas 1st Floor 122, 121 and stairway 2nd Floor D units grid, 211, 212, 213, 214, 215, and Stairway 3rd Floor 312, 314, 315, Corridor Walls and Stairway Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 3rd floor corridor. All insulation was removed for inspection.
|
Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 | P | FAIL |
Mark Moncarr
|
|
|
Building B 4th Floor C Units rough in. 1st Floor C corridor walls
D common areas 1st Floor 122, 121 and stairway 2nd Floor 211, 212, 213, 214, 215, and Stairway 3rd Floor 312, 314, 315, Corridor Walls and Stairway Phone #: ###-#### Inspection requested via web by Stephanie Huston Boise City Ordinance Section 4-05-23 Unlawful to Conceal. All insulation in 3rd floor corridor will be removed. Not just bays with boxes in them. This warning has been mentioned before on previous inspections. This includes foam seal and caulking of boxes.
|
Electrical Rough-In | 3/29/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Mark Moncarr
|
|
|
Building B, C-Units 3rd ; 4th floors rough in inspection. Building B, 1st floor grid inspection D-Units. Phone #: ###-#### Inspection requested via web by James Kemner Ok cover 1st flr, D units ceilings, 3rd flr, C units, and 1st flr, C corridor.
|
Electrical Rough-In | 3/26/2019 | 3/27/2019 | 3/27/2019 | P | PASS |
Mark Moncarr
|
|
|
Building B. C1 and C2 units rough in and D1 corridor walls Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover units listed. Asked electrician to let GC know that next time a rough inspection is done, exterior boxes need to be free of caulking. If caulking is installed prior to future RI inspections, it will all be removed before inspection will be completed.
|
Electrical Rough-In | 3/20/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Mark Moncarr
|
|
|
B building 4th floor D units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 4th D units.
|
Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Mark Moncarr
|
|
|
Building B, D units 4th floor rough in inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Area specified on inspection was not done due to re-framing. Inspection was done on 2nd floor corridor instead. Ok cover walls only.
|
Electrical Rough-In | 3/7/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Mark Moncarr
|
|
|
Building B, D units on 3rd floor rough in Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 3rd floor. Some nailplates missed, were installed while there.
|
Electrical Rough-In | 3/4/2019 | 3/6/2019 | 3/6/2019 | A | PART |
Mark Moncarr
|
|
|
Second floor D units, rough in and ceilings inspection. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 2nd floor Bldg D. For future inspections, all walls will need to be open. 2nd floor exterior walls were insulated. All terminal barriers in panels were installed.
|
Electrical Rough-In | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Mark Moncarr
|
|
|
First floor D rough in inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 1st floor walls Bldg. D.
|
Electrical Rough-In | 2/15/2019 | 2/19/2019 | 2/19/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover exterior walls and ceilings in all units in Bldg D first floor.
|
Conference | 9/11/2018 | 9/13/2018 | 9/13/2018 | P | DONE |
Mark Moncarr
|
|
|
Job walk and discussion about start of rough electrical. Anytime after 12 pm works for me. If possible call me when you are on your way to site. Phone #: ###-#### Inspection requested via web by Stephanie Huston Discussed the need to ensure interior wiring is not compromised by the weather. It is recommended that the upper 4th floor get dryed in to avoid damage from water.
|
Electrical Rough-In | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PART |
Mark Moncarr
|
|
|
Underground outside building Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial cover for conduits going to transformer.
|
Electrical Rough-In | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Mark Moncarr
|
|
|
Underground pipe next layer Inspection requested via web by Stephanie Huston Ok cover conduits.
|
Electrical Rough-In | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Mark Moncarr
|
|
|
Underground inspection east electrical room Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 6- 4" and 8-5" conduits for E side electrical room.
|
Electrical Rough-In | 4/30/2018 | 5/1/2018 | 4/30/2018 | A | PASS |
Mark Moncarr
|
|
|
Ufer Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover. Looked at on 4/30/18. 3/0 ufer attached rebar. Concrete was to be poured early morning of 5/1/18.
|