Site Final | 8/7/2017 | 8/11/2017 | 8/14/2017 | A | PASS |
Andy J. Long
|
|
|
All exterior work complete. No temporary BMPs or loose dirt/materials around site. No ESC corrections needed, permit conditions satisfied.
|
General Inspection | 8/7/2017 | 8/7/2017 | 8/7/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2017 | 6/20/2017 | 6/23/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/5/2017 | 5/5/2017 | 5/5/2017 | | PASS |
Melissa Jannusch
|
|
|
|
BMP Violation | 3/17/2017 | 3/20/2017 | 3/21/2017 | A | PART |
Andy J. Long
|
|
|
Staging lane and sidewalks and gutters on Front & 9th have been swept.
Corrections remaining: - post ESC permit sign at 8th & Front entrance - increase sweeping frequency - will investigate grate on 9th to see if MS4 needs inlet protection
|
BMP Violation | 3/15/2017 | 3/17/2017 | 3/17/2017 | P | FAIL |
Andy J. Long
|
|
|
check for progress on corrections
No inlet bag installed. Sweep up of staging area was and parking lane has been inadequate. New permit sign provided has not been posted
|
General Inspection | 3/13/2017 | 3/14/2017 | 3/15/2017 | P | FAIL |
Andy J. Long
|
|
|
Corrections required:
- continue sweep up of closed traffic lane and parking lane on Front in between 8th & 9th. Lots of dust and dirt accumulated - install sediment protection on MS4 inlet on 9th Street at Front. Note: - drain on 8th & Front grate is unable to be removed. Increase sweeping frequency in this area en lieu of no inlet protection - recommend daily - Post new ESC permit sign at 8th & Grove entrance area (provided sign to flagger to giver to RP Adam)
Corrections issued verbally to RP Adam with ESI. Follow up inspection for corrections on Friday 3/17
|
General Inspection | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 2/21/2017 | 2/21/2017 | 2/23/2017 | | PASS |
Melissa Jannusch
|
|
|
okay to final
|
General Inspection | 1/6/2017 | 1/6/2017 | 1/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/21/2016 | 11/21/2016 | 11/22/2016 | | PASS |
Andy J. Long
|
|
|
note: Phase III of Boise Centre Expansion to be covered under ESC16-01574.
|
General Inspection | 10/4/2016 | 10/4/2016 | 10/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP on Grove Centre expansion. Mulitiple projects in vicinity , permitted seperately.
Staging area is on the 8th Street walkway to the plaza. No discharges or trackout. System installd for wet cutting materials to reduce dust. Process water collect in leak prooof container.
DIs on Front and 9th and have sediment filter bags. Approved.
|
General Inspection | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/17/2016 | 8/17/2016 | 8/18/2016 | | CANC |
Andy J. Long
|
|
|
|