Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC15-01613
StatusFinaled
Name ADAM JOHNSON
Site Address 850 W FRONT ST
Project NameBoise Centre 2015 Expansion
Customer Number 
ePlanReviewNo
Description
ESC plan waiver approved. BMPs include immediate haul away of excavated excess soils, storm drain protection, and pollution prevention practices in staging area. See also ESC15-01613**Project Management-Ron Hill** (BOISE CENTRE LOBBY EXPANSION, TERRACE, PEDESTRIAN WALKWAY, AND CONCOURSE) (DRH15-00462) Fire sprinkler systems used for high-rise and for occupancy. To expand a portion of the existing Boise Centre Convention building by constructing a 2nd story to create a vertical circulation route to a new elevated pedestrian walkway and enclosed elevated concourse that will connect the Boise Centre Convention building to the City Center Plaza building (3,603 square feet total). The floor of the new elevated circulation route will be located about 24 feet above grade, at the perimeter of The Grove. The concourse will be part of the Century Link Arena building. A terrace will also be constructed at the Boise Centre Convention building adjacent to The Grove.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/7/20178/11/20178/14/2017APASS
DetailsAndy J. Long
All exterior work complete. No temporary BMPs or loose dirt/materials around site. No ESC corrections needed, permit conditions satisfied.
General Inspection8/7/20178/7/20178/7/2017 CANC
DetailsAndy J. Long
General Inspection6/20/20176/20/20176/23/2017 PASS
DetailsAndy J. Long
General Inspection5/5/20175/5/20175/5/2017 PASS
DetailsMelissa Jannusch
BMP Violation3/17/20173/20/20173/21/2017APART
DetailsAndy J. Long
Staging lane and sidewalks and gutters on Front & 9th have been swept.

Corrections remaining:
- post ESC permit sign at 8th & Front entrance
- increase sweeping frequency
- will investigate grate on 9th to see if MS4 needs inlet protection
BMP Violation3/15/20173/17/20173/17/2017PFAIL
DetailsAndy J. Long
check for progress on corrections

No inlet bag installed. Sweep up of staging area was and parking lane has been inadequate. New permit sign provided has not been posted
General Inspection3/13/20173/14/20173/15/2017PFAIL
DetailsAndy J. Long
Corrections required:

- continue sweep up of closed traffic lane and parking lane on Front in between 8th & 9th. Lots of dust and dirt accumulated
- install sediment protection on MS4 inlet on 9th Street at Front. Note: - drain on 8th & Front grate is unable to be removed. Increase sweeping frequency in this area en lieu of no inlet protection - recommend daily
- Post new ESC permit sign at 8th & Grove entrance area (provided sign to flagger to giver to RP Adam)

Corrections issued verbally to RP Adam with ESI. Follow up inspection for corrections on Friday 3/17
General Inspection2/23/20172/23/20172/23/2017PPASS
DetailsMelissa Jannusch
General Inspection2/21/20172/21/20172/23/2017 PASS
DetailsMelissa Jannusch
okay to final
General Inspection1/6/20171/6/20171/10/2017 CANC
DetailsAndy J. Long
General Inspection11/21/201611/21/201611/22/2016 PASS
DetailsAndy J. Long

note: Phase III of Boise Centre Expansion to be covered under ESC16-01574.
General Inspection10/4/201610/4/201610/6/2016 PASS
DetailsAndy J. Long
WIP on Grove Centre expansion. Mulitiple projects in vicinity , permitted seperately.

Staging area is on the 8th Street walkway to the plaza. No discharges or trackout. System installd for wet cutting materials to reduce dust. Process water collect in leak prooof container.

DIs on Front and 9th and have sediment filter bags. Approved.
General Inspection8/17/20168/18/20168/18/2016APASS
DetailsAndy J. Long
General Inspection8/17/20168/17/20168/18/2016 CANC
DetailsAndy J. Long