Site Final | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 | | PASS |
Melissa Jannusch
|
|
|
Project complete. Okay to final.
|
General Inspection | 3/24/2017 | 3/24/2017 | 3/24/2017 | | PASS |
Melissa Jannusch
|
|
|
No WIP. Soil stable. Okay to final with BLD permit.
|
General Inspection | 2/6/2017 | 2/6/2017 | 2/6/2017 | | PASS |
Melissa Jannusch
|
|
|
No corrections. BLD still open. Small patch of diveway still not paved.
|
General Inspection | 12/20/2016 | 12/20/2016 | 12/21/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/4/2016 | 11/4/2016 | 11/4/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/19/2016 | 9/19/2016 | 9/19/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 | | PASS |
Andy J. Long
|
|
|
Project near completion. Remodel structure, exterior, and foundation complete. BLD still open.
Small patch of dirt between garage and driveway is source of small amount of trackout. Looks like it will be finished/stabilized. Will keep ESC open till paved over/tstabilized.
|
Site Preparation | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | PART |
Andy J. Long
|
|
|
WIP in backyard. Permit sign posted. Need to sweep up the small amount of trackout at the end of the day.
|
Site Preparation | 2/1/2016 | 2/4/2016 | 2/4/2016 | P | CANC |
Andy J. Long
|
|
|
Chris-please call 1 hour prior to meet Phone #: ###-####1
rescheduled
|