Site Final | 5/30/2017 | 5/31/2017 | 5/31/2017 | A | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 5/29/2017 | 5/29/2017 | 5/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Melissa Jannusch
|
|
|
Almost complete. Landscaping has not been installed yet.
|
General Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed
|
General Inspection | 1/30/2017 | 1/30/2017 | 1/31/2017 | | PASS |
Melissa Jannusch
|
|
|
Building is finished. No WIP. Final stabilization not installed yet. Snow covered conditions preventing vegetation installation. No trackout. Ensure sidewalk is swept and vegetation is installed before finaling
|
General Inspection | 12/9/2016 | 12/15/2016 | 12/19/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/29/2016 | 12/5/2016 | 12/9/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit sign is posted. No hillside disturbance, no trackout or discharges. Receiving storm drain has DI protection.
|
General Inspection | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit sign posted, materials and trash well contained. No trackout or discharges, approved.
|
General Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on framing. No sediment or other materials leaving site. Trash and materials contained. Clean site. Permit sign posted.
|
Site Preparation | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Andy J. Long
|
|
|
Buster Phone #: ###-####
Silt fence BMP installed at back of slope. Permit sign posted with ESC plan and permit documents on site. GC Buster stated that concrete washout to be installed when back hoe arrives onsite. Requested that employees park on street as to not disturb the adjacent lots.
Approved for construction.
|