Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | | PASS |
Melissa Jannusch
|
|
|
Project complete. Soil stable okay to final.
|
General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Frame and driveway are complete. Trash and materials contained onsite. Site is in compliance.
|
Random Inspection | 11/1/2016 | 11/1/2016 | 11/1/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on frame and interior. Sidewalk and street are very clean, no trackout or sediment runoff. Trash and materials contained. No corrections.
|
General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit posted. Sidewalk and gutter free of loose dirt. Trash contained. No corrections needed.
|
General Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted clearly. Sediment trench has been installed at edge of pavement to prevent runoff to sidewalk. No trackout or other violations observed. Approved.
|
Site Preparation | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Andy J. Long
|
|
|
Approved for construction. Met homeowner RP on site to review ESC requirements/conditions. Infill lot, small bank along sidewalk will have small sediment trough. Permit to be posted on fence. Approved for constructin next week
|