Site Final | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Andy J. Long
|
|
|
Project now under ESC17-01449. No ESC corrections, this permit finaled.
|
Aging Inspection | 8/7/2018 | 8/7/2018 | 8/7/2018 | | PASS |
Andy J. Long
|
|
|
NO trackout or discharges. WIP on foundation. Checking for permit status.
|
Aging Inspection | 6/5/2018 | 6/5/2018 | 6/6/2018 | | PASS |
Andy J. Long
|
|
|
No activity at site. No trackout or ESC violations. RP stated he will be finishing the common driveway prioer to another builder doing the SFHs.
Notified RP Keith that Code Enforcement posted a 10 day notice to abate weeds on May 30th. He said will notify lot owners to weed whack/clean up.
|
Random Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Andy J. Long
|
|
|
Driveway entrance to street has been installed. Some materials are staged on lot. No trackout or loose trash around site. No SFH activity yet.
|
Aging Inspection | 2/28/2018 | 2/28/2018 | 3/1/2018 | | PART |
Michael Zawacki
|
|
|
Site is inactive. Some stockpiles and parked trailers on site. No sign of any recent activity. No permit or SWPPP on site.
|
Aging Inspection | 12/29/2017 | 12/29/2017 | 12/29/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Melissa Jannusch
|
|
|
Met onsite with RP. Discussed concrete washout, trackout, keeping sidewalk and surroundings clean. Site has a 30-40ft vegetated buffer between the creek and a small buffer strip between the sidewalk and the disturbance. Oaky to start.
|