Description
8-plex multi-family building.Perimeter controls and gravels on 15th and Front st. CW and other ESC controls. Plan approved. RP TBD need to be designated before construction begins.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/26/201810/30/201810/31/2018PPASS
DetailsAndy J. Long
Construction complete. Site has been clean and perimeter sidewalks and gutters swept. DI bags on 15th have been removed. ESC permit conditions satisfied. All permits finaled.
General Inspection10/26/201810/26/201810/26/2018 PASS
DetailsAndy J. Long
General Inspection9/10/20189/10/20189/10/2018 PASS
DetailsAndy J. Long
WIP on exterior finish. Storm drains still have sediment bags installed. These will need to be removed in order to get ESC site final approval.

No violations observed.
General Inspection7/25/20187/25/20187/25/2018 PASS
DetailsAndy J. Long
WIP installing pavers behind units on 15th Street. No trackout or loose material stored in ROW or gutter. Improvments on 15th street curb also occuring. No corrections requested.
General Inspection6/6/20186/8/20186/13/2018PPASS
DetailsAndy J. Long
check for corrections

Sidewalk and gutter have been swept as requested. Scaffolding for exterior stucco is being removed. DI bags still installed. No new corrections.
General Inspection6/6/20186/6/20186/6/2018PPART
DetailsAndy J. Long
No trackout, discharges, or piles of loose trash. Permit signs posted.

Correction request:
- sweep gutter on 15th Street
- clean up sediment and debris around storm drain inlet bags
- pick up loose trash and cigarette butts in gutter and sidewalks along 15th and Front.

Verbal correction request to RP Chad. He stated he will have it cleaned up today and tomorrow.
General Inspection4/24/20184/24/20184/25/2018 PASS
DetailsAndy J. Long
WIP applying exterior finish. No loose dirt or debris on sidewalk or in gutter. Trash consolidated in back staging area. MS4 inlet has sediment bag protection.

SIte needs new ESC permit sign posted, will provide to RP
General Inspection3/8/20183/8/20183/9/2018 PASS
DetailsAndy J. Long
No trackout from site. Storm drains on 15th have inlet protection. Permit sign posted of fence. No loose trash or debris leaving site.
General Inspection1/12/20181/12/20181/12/2018PPASS
DetailsMichael Zawacki
Concrete contractor doing sidewalks and approach on 15th. No dirt leaving perimeter.
General Inspection11/2/201711/3/201711/3/2017APEND
DetailsMichael Zawacki
Talked to Dwayne. Gave him new permit to fill out and post, old one was phaded and falling apart. Asked them to clean all the trash laying everywhere, said they do it weekly.
General Inspection8/7/20178/8/20178/9/2017PPASS
DetailsAndy J. Long
stockpile removal in progress...check that street and gutter are clean

Stockpile removed. Staging area swept clean. Bike lane and gutter are free of loose dirt or rock. DI bag installed, permit sign posted.